wildflower pond restoration project utilizes drone mapping technology

development of wildflower pond restoration plan

originally constructed in the 1940s, wildflower pond on the outskirts of ankeny began its life on the edge of a vast, rural homestead. by the time residential and commercial development began to overtake the area in 2004, the pond had filled with sediment which dramatically decreased its size, reduced the water’s quality, and resulted in overflow concerns during heavy rainstorms. after more than a decade of economic expansion, the entire 85-acre watershed surrounding the pond was filled with thriving neighborhoods and new business locations. city of ankeny leaders contracted snyder & associates to develop a pond restoration plan in an effort to return wildflower pond to its former glory.

satellite image of pond surrounded by residential neighborhoods

wildflower pond post-development

pond improvements create new, sustainable habitats 

early hydrologic and hydraulic modeling performed by our team revealed two significant problems — the existing pond basin could not confine area stormwater runoff in the event of large rainstorms and the downstream system was not equipped to receive flows from a significantly larger outlet pipe. these two issues made it clear that our team would have to make the pond functional in addition to adding overflow structures.

working carefully to avoid wetland impacts, the snyder & associates team increased the pond’s overall footprint and lowered the standing pool depth, expanding its total storage capacity. increasing the pond’s depth from around two to three feet to a range of three to twelve feet also created new, sustainable habitats that can now house a variety of aquatic species.

while these changes successfully eliminated frequent overflows, the storage volume of the pond was now large enough that it surpassed the threshold requiring an iowa department of natural resources (dnr) dam permit. our team worked with iowa dnr dam safety program engineers to analyze breach failure impacts, redesign the outlet structure, and add embankment drains. these substantial improvements greatly increased the dam’s safety and met all permitting requirements.

incorporating drone modeling after pond restoration

post-construction, the city requested a base map of its newly renovated pond to assist in future improvement 2022世界杯32强预选赛 . to meet this request, snyder & associates engineers enlisted the help of our survey team and their drone. these unmanned aerial vehicles (uavs) provide invaluable insight with expansive views of project locations.

flying nearly 200 feet above the pond, the drone took 123 aerial photos of the pond and its surrounding areas. once the flight was complete, our team used software to stitch the images together and create a 360-degree interactive map. these maps are detailed, showing varying surface elevations and area features such as houses, trees, and fences. thanks to drone technology, what would have previously taken multiple surveyors a full day to accomplish can now be completed by a single operator in under an hour — and in much greater detail. snyder & associates was proud to provide this unique deliverable and was met with positive feedback from our client.

drone aerial photos create 3d visual of pond restoration area

the finished product of many drone photos stitched together to create an immersive map.

what started as a small pond on a rural homestead has now been transformed into a vibrant recreational focal point for a growing residential area. green spaces like wildflower pond are known to positively impact human health and are crucial in building community relationships. walkable neighborhoods, parks, and open green areas draw people outside and foster social interactions. with future park and walking path improvements planned for the area by the city’s parks department, the restored pond is certain to be a feature attraction within this ankeny neighborhood.

client

city of ankeny

client type

project type

mark land, p.e., cfm

mark land, p.e., cfm

vice president

related projects

||||

creating a safer, smarter space for animal services in des moines

at the corner of se 14th and harriett streets in des moines, a forward-thinking facility now stands as a beacon of care for animals and the community. the new des...

innovative structural solutions at the historic polk county courthouse

the polk county courthouse, a 1906 beaux arts classical landmark, has been thoughtfully restored to meet the evolving needs of the county while honoring its storied...

radial collector wells strengthen water supply for atchison, kansas

reliable access to safe drinking water is essential for any community, and the city of atchison is taking proactive steps to enhance its raw water supply system. as...
|||||

ziggy park ball field: a lasting gift to the deforest & windsor communities

snyder & associates is proud to have played a key role in the development of ziggy park, a new baseball facility in the village of deforest that enhances the...
||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...

more than 45 years

serving clients around the country

db+