stream realignment required for roadway extension in west des moines

community growth drives roadway expansion & stream realignment

the stagecoach drive extension over sugar creek in west des moines extended a minor arterial roadway to serve a rapidly-growing residential area. stagecoach drive is currently a two-lane road, which is planned for expansion to five lanes as future conditions warrant. ultimately, city traffic models predict that stagecoach drive will carry up to 23,000 vehicles per day, creating the need for additional lanes.

as land development in west des moines pushes to the west side of sugar creek, a bridge crossing on stagecoach drive was included in the city’s comprehensive plan. with stagecoach drive already constructed 500-feet to the east side of sugar creek, options to cross the creek were limited. the desired crossing location was near a sharp meander in the creek where severely eroded banks posed a challenge.

after completing an alternatives analysis and coordinating with the u.s. army corps of engineers (usace), our design team determined the best solution was a single span, 135′-long, 30′-wide, pretensioned prestressed concrete beam bridge with a five’-wide sidewalk on the south side. as future traffic demand warrants, the bridge can be widened to provide 660′ of additional roadway with a 10′-wide trail on the north side.

mitigation options for stream realignment

plan sheet showing planned stream realignments

preliminary plans mapping stream renovations.

the sharp meander in the creek needed to be removed to accommodate the new bridge. by realigning the creek to minimize the meander, the stream length of sugar creek was reduced by 140′. at the time of the project, stream mitigation banks offering credits within the watershed were not available, so the snyder & associates environmental scientists reviewed a city-owned property that would be suitable for mitigation for the stream realignment.

jordan creek, which runs through brookview park in west des moines, was chosen to mitigate the environmental impacts of sugar creek stream realignment. eroding streambanks, minimal trees, and plenty of areas to increase the stream length made brookview park an ideal mitigation location. the improved stream enhances the natural beauty of the park. coincidentally, the stream realignment design increased the overall length of jordan creek by nearly 200′.

back at the site of the roadway expansion, the banks of sugar creek were armored to prevent erosion around the bridge abutments and a rock riffle was installed downstream to reduce overall erosion. the bridge accommodates the planned construction of a trail along the west side of sugar creek, which will go underneath the bridge. water flowing through the project site now appears clearer than water upstream and downstream, signaling that erosion control measures in the area are working.

roadway extension highlights community character

the city of west des moines wanted the creek crossing to be aesthetically pleasing and harmonize with other creek and river crossings in the area. with that in mind, we developed a custom aluminum railing design for the stagecoach drive bridge and other local bridges, including the new grand prairie parkway bridges over sugar creek and the raccoon river. custom bridge monuments were also designed and constructed for each corner of the new bridge design, creating a sense of place. monuments on the north side of the bridge are within the future widened roadway’s footprint, so our structural engineers designed them to be mobile for future relocation.

monuments will also be built at other local bridge locations to tie the bridge crossings together and help the traveling 世界杯足球比赛预选赛 feel connected to the environment around them. the monument on the right side of the bridge approach contains the west des moines logo and the name of the waterway running underneath.

the bridge, monuments, and stream mitigation at brookview park were constructed during the 2017 construction season. as the lead consultant, our responsibilities included the design, permitting, and construction oversight for the project. in addition to overall project management, the range of services provided included topographic survey, wetland delineation, hydrologic and hydraulic modeling, 404 permitting, roadway design, acquisition plats, and construction administration and observation. in addition, 2022足球世界杯小组赛赛程 , our structural engineering subsidiary, provided the structural bridge design services.

client

city of west des moines

client type

project type

mark land, p.e., cfm

mark land, p.e., cfm

vice president

related projects

aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
exposed siphon at omaha papio creek|drone map of the papio creek in omaha ne|papio creek stream

safeguarding critical infrastructure and water resources: omaha’s “papio” creek

in march 2019, the city of omaha faced a significant threat to its critical infrastructure under west papillion creek (known to locals as papio creek). a disastrous...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
south dakotas capitol building behind dredging equipment on lake|excavator on floating platform|excavator dredging from shoreline|sediment being pulled from lake bed|aerial view of capitol lake in south dakota|dump truck being filled with sediment from of south dakota's capitol lake

sediment buildup necessitates lake dredging project at south dakota capitol complex

one of the prominent features complementing the architectural beauty of the capitol complex in pierre, south dakota, is the 9.5-acre capitol lake. fed by a naturally...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...

more than 45 years

serving clients around the country

db+