small-scale street project, substantial results: lainson avenue rehabilitation

residential roadway rehabilitation project improves neighborhood

lainson avenue in council bluffs, iowa is a short, dead-end, residential street extending to the west from the intersection with harrison street on the north side of town. it runs up a steep grade to conclude at a t-intersection with lainson court a mere 500′ away. after years of receiving overlays as a stop-gap measure, the street pavement, along with the sidewalks, retaining walls, and the resident access staircases were significantly deteriorated.

the rehabilitation project called for the complete demolition and removal of the existing street, sidewalks, and retaining walls. it was also necessary to reconstruct and replace the sanitary and storm sewers, as well as replace the utilities and water mains. new retaining walls, sidewalks with ada ramps, driveway approaches, and lawn restoration were also needed to complete the project.

challenging staging for street & utility reconstruction

since there was only one entrance to the street, consideration had to be taken that allowed residents access to their homes during the entire project. in order to address this challenge, the project was divided into three

narrow street for project location

with only one point of entry for the project, our experts had to be considerate of resident access.

construction phases which left one lane of the narrow street open at all times. this multi-phase approach also helped to facilitate the utility construction sequencing.

in addition, many properties on lainson avenue are elevated above the street. this resulted in several properties having stormwater runoff and roof drains that discharged over the slopes or retaining walls. snyder & associates designed a drainage assembly connection located behind the replacement retaining walls to help move stormwater to the storm sewer system without unsightly above-ground piping. cleanouts were placed within the retaining walls to access the drainage assembly in the event that it becomes plugged with debris.

with a total project cost of $550,000, snyder & associates provided numerous services that contributed to the project’s success, including:

  • topographic survey
  • coordination for geotechnical consulting and reporting
  • sanitary, storm sewer, and roadway design
  • coordination for water main design
  • bidding phase services
  • construction staking
  • coordination for construction materials testing
  • construction observation
  • project management

because all of the street pavement, sidewalks, and retaining walls were replaced on lainson avenue, the overall look of the neighborhood was drastically improved as a result of the project. this street rehabilitation is the perfect example of how snyder & associates can tailor their services to meet the needs of any size project.

client

city of council bluffs

client type

project type

michael g. geier, pls

michael g. geier, pls

council bluffs business unit leader

related projects

||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...

more than 45 years

serving clients around the country