sac city treatment plant renovations renew timeworn wastewater system

budget-conscious upgrades provide wastewater solution

initially constructed in the late 1970s, sac city’s wastewater treatment plant and some of its critical components had reached the end of their useful life. working closely with city leaders and the iowa department of natural resources (dnr), a team from snyder & associates determined that the plant could be upgraded using a significant amount of the existing facility, while also incorporating the rotating biological contactors (rbc) technology city staff was familiar with. when fully implemented, these renovations would save the municipality both time and money.

since the wastewater facility was functional but outdated, our experts needed to decide what original aspects could be saved and what needed to be replaced. using a comprehensive facility plan, we determined that the two final clarifiers and the chlorine disinfection tank could remain in service with proper renovations.

additionally, reconfiguring the facility’s current building — which housed labs, offices, headworks, treatment area, and a chlorine disinfection room — to fit the recommended updates, significantly reduced the project’s overall cost and timeline. with these funds added back into the budget, the city was able to afford the significant upgrades necessary to update its system for better quality and efficiency.

new facility layout creates infrastructure space

although our team tried to preserve as much of the original physical plant as possible, multiple features were beyond restoration and required a complete replacement or significant upgrades. after renovating the expansive building, our team brought in upgraded equipment and components to replace the outdated systems. this included two new rotary fine screens and a vortex grit removal system that serves as the facility’s headworks. additional improvements were made to the chlorination/dechlorination disinfection system, with storage upgraded to meet modern standards.

in the same building, each of the six existing rotating rbc units was replaced due to age. this update maximized the facility’s total biological and hydraulic capacity and increased treatment quality.

irregular inflow and infiltration (i/i) & biosolids treatment inadequacies addressed

with a history of high flows and irregular inflow and infiltration (i/i), it was imperative that our designs accommodate these concerns. as a mitigation effort, a synthetically lined five-million-gallon flow equalization basin was constructed toward the west end of the treatment complex. with this basin in place, the facility can operate within its hydraulic capacity and treat excess wastewater once flows have decreased.

for years the original facility had been plagued by inadequate biosolids treatment and storage capacity issues that were creating operational difficulties. our team remedied this problem by installing pumps to move the biosolids from the final clarifiers to combined aerobic digesters and storage units. the addition of the pumps resulted in a significant improvement by providing finite system control. also, existing biosolids components were significantly upgraded, including the construction of a new blower building and a new biosolids storage and treatment system.

other facility upgrades included:

  • modern supervisory control and data acquisition (scada) control system
  • improved heating, ventilation, and air conditioning (hvac) system
  • significant electrical upgrades
  • new emergency power generators
  • aluminum covers on final clarifiers
  • new facility roof

new pump station requires structural improvements to update treatment facility

tunnel view from bottom of sac city pump looking up ladder

view from the bottom of sac city’s main pump station.

after our thorough facility study highlighted structural and corrosion issues, along with worn-out equipment in the main pump station leading to the updated treatment facility, the city determined that maintaining the existing pump station was critical and should be added to the project plans. as part of the larger treatment plant, this station pumps 100 percent of the wastewater flow from the city to the plant. since the pump station was constructed simultaneously with the original treatment facility in the 70s, it was designed without any type of emergency bypass options — a feature that is no longer viable under current regulations.

the original pump station also consisted of a steel cylinder construction that was over 35-feet-deep with two, open-motor centrifugal pumps and a ladder for access. this design created confined space concerns, had no operational gas detection equipment and was outfitted with antiquated ventilation equipment.

requiring complete reconstruction, our project team implemented structural improvements to address the shortcomings of the current configuration. this included a bypass plan for use during the pump station rebuild process that ultimately became a permanent feature for emergency situations. the station was also protected with new coatings and had new dry-pit submersible pumping units installed. other improvements included a new ventilation system, an active gas detection system, an emergency generator, and a new electrical system.

multi-source project funding eases community burden

as the nation’s wastewater infrastructure ages, the gap between necessary spending and available funding for repairs is rapidly growing. the staff at snyder & associates understands the importance of preparing work plans that strategically position your project to acquire the funding and financing needed for water infrastructure improvements.

for sac city’s wastewater treatment plant project, numerous funding sources, including community development block grant (cdbg), state revolving fund (srf), american recovery and reinvestment act (arra), and user rates, were tapped to finance the improvements. by incorporating facility aspects that were already in use, we were able to dramatically decrease the projected costs, open the door for more widespread improvements, and provide sac city residents with a much more efficient wastewater treatment system that gives them the maximum return on their investment.

client

city of sac city

client type

project type

darin jacobs, p.e.

darin jacobs, p.e.

water resources work group leader

related projects

exposed siphon at omaha papio creek|drone map of the papio creek in omaha ne|papio creek stream

safeguarding critical infrastructure and water resources: omaha’s “papio” creek

in march 2019, the city of omaha faced a significant threat to its critical infrastructure under west papillion creek (known to locals as papio creek). a disastrous...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
slater wastewater treatment greenhouse at sunset|wastewater lagoon with aeration bubbles|greenhouse and settling pond|aerial view of large lagoon cell drained for construction|slater's new greenhouse for wastewater treatment|inside slater greenhouse with empty cells|inside of slater wastewater treatment plant with algae belts.|slater wastewater treatment plant ribbon cutting|visitors walk inside the new slater greenhouse and view rab belts|aerated lagoon at the slater wastewater treatment plant|rab belts at the slater wastewater treatment plant

slater incorporates algae to treat community wastewater

for years, the city of slater used an aerated lagoon system as its primary wastewater treatment method. however, increased awareness of pollutants and their impact on...
blue and red map of sewer system service area|corroded manhole|lime green map of pleasant hill sewer system and neighboring communities

growth in pleasant hill leads to sanitary sewer system review

snyder & associates was tasked with conducting a sanitary sewer system review, identifying long-term system and infrastructure upgrades.

square concrete new lift station|above ground section of vertical screen|large machine used to bore holes and make way for pipe|trenchless construction|lead tubing being placed before pipe|concrete tube that will eventually house pumps|square concrete new lift station

lift station upgrades eliminate backups & increase efficiencies: anamosa

anamosa 2nd street wastewater lift station improvements as community leaders in mature communities know, the need for new and more efficient wastewater systems is a...
large rectangle wastewater lagoon pond|snowy fields with school in distant background||large dirt hole during lagoon construction|concrete walls of the lagoons lift station placed in the ground

starmont high school’s wastewater dilemma requires speedy solution

thanks to positive client relationships and word-of-mouth recommendations, snyder & associates was hired to find a viable wastewater solution for a high...
aerial view of two large blue lagoons and operation buildings||waterside view of lagoon and gravel shores|metal walkway between two lagoons. one is rough and one is smooth.||

west burlington’s wastewater treatment plant upgraded to meet current npdes requirements

snyder & associates wastewater engineers were enlisted to develop a plan for remodeling and expanding west burlington’s existing wastewater treatment...
car sprays water while driving through a large puddle||car sprays water while driving through a large puddle|view of downtown skyscrapers at then end of a main street|satellite map with project area outlined in red|construction work in a deep trench

des moines’ sewer separation initiative prevents flooding, backups & overflows

antiquated stormwater & wastewater system fails to meet new standards when the city of des moines wastewater system was initially constructed, viable methods for...
inside of the disinfection-flow equalization tank.|inside of the sbr tank looking at the aeration piping system.|inside of treatment tank looking at piping

custom wastewater treatment solutions for growing industrial client

working with this industrial client for over ten years, snyder & associates continues to provide the most cost-effective, environmentally-sound, and...
cement building with blue roof|grey wall of electrical pannels|multiple pumps in cement room|three oval motors in a row|looking down on multi-level facility floors|

new pump station expands st. joseph’s eastside sewer system reach

the city of st. joseph selected snyder & associates to replace the outdated, undersized easton road pump station with a newly designed wastewater facility in an...

more than 45 years

serving clients around the country

db+