roadway reconstruction gives new life to council bluffs neighborhood

council bluffs infrastructure reconstruction project upgrades south 1st street network

south 1st street cuts through a bustling residential neighborhood on the east side of council bluffs. this historic neighborhood dates to the turn of the 20th century and much of the infrastructure at this location was originally constructed without storm sewers and on moderately sloped grades with narrow rights-of-way. the south 1st street reconstruction project is part of a multi-phase initiative to improve neighborhood streets throughout the community. the professionals with snyder & associates were hired to create a comprehensive plan that considered continued traffic flow in the area, as well as full access for residents during construction.

prior to reconstruction, this short section of langstrom street was in very poor condition.

streets that are thirty years old or more have typically outlived their service life. in many cases, the only remedy is a complete reconstruction, which can cost significantly more than a minor street rehabilitation project. reconstruction consists of completely removing the existing pavement. occasionally, the subbase layer may also need to be rebuilt. if poor subgrade soils are found under the pavement, new aggregate subbase material can be placed and compacted, or the old pavement material can be pulverized and compacted. a new asphalt or concrete surface is then placed on top. curbs and sidewalks are often replaced, as well, as part of an urban road reconstruction project.

reconstructed streets are designed to last for thirty years or longer. however, with a proper pavement preservation policy and applied techniques, they can last far beyond their design life.

construction efforts transform local corridor

reconstruction on the south 1st street project included the complete removal and replacement of numerous streets, driveways, and sidewalk pavements, along with sanitary sewers in the right-of-way. the project also included the construction of new storm sewers and intakes. street cross-sections and profiles were revised when conditions allowed, meeting current statewide urban design and specifications (sudas) standards. construction efforts were carefully staged to maximize access to homes and limit disruption within the neighborhood.

the snyder & associates team oversaw the geotechnical engineering contractor and completed all other aspects of this comprehensive project in-house. our team recommended the use of carefully planned construction phases that broke the project into service basin areas with reasonable construction timelines.

our team also evaluated the existing drainage and sanitary sewer service areas along the corridor, provided a concept development for new storm sewers, and provided construction observation over the entirety of the project. options of probable cost for sanitary sewer reconstruction, storm sewer construction, and street and sidewalk reconstruction were also provided.

because all the street pavement, sidewalks, and crosswalks were replaced in numerous areas around the south 1st street site, the overall look of the neighborhood was drastically improved because of the project. this street reconstruction is the perfect example of how snyder & associates can tailor their services to meet the needs of any size project.

client

city of council bluffs

client type

project type

wade greiman, p.e.

wade greiman, p.e.

transportation business unit leader

related projects

||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...
overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...

more than 45 years

serving clients around the country

db+