roadway improvements upgrade multimodal hub: iowa state university/morrill road

college campus roadway reconstruction improves access

morrill road is a one-way street that winds through the iowa state university central campus in ames, iowa. the corridor is adjacent to several significant campus buildings, including the library, beardshear hall, and morrill hall. morrill hall has the distinction of being listed on the national register of historic places. morrill road was originally constructed of concrete in the mid-1920s and had undergone numerous rehabilitation efforts and overlays over the years. by 2008, the pavement was beyond its design life and needed replacement in order to continue servicing the multiple modes of traffic that use the corridor, including a high number of pedestrians and bicyclists.

morrill road project requires complete street solutions to address unique challenges

at the request of isu officials, snyder & associates completed a corridor study with the primary goal of creating a “complete street” design in a campus setting. the existing use of the roadway consisted of one-way vehicle traffic, including numerous cyride buses passing along the corridor. two-way bicycle traffic shared one, narrow lane, creating a less-than-ideal situation. also, the heavy, student pedestrian traffic along the route needed to be a chief concern for the new design.

in addition, several special situations had to be taken into consideration during the design and construction of the project, including:

  • the need to maintain several pedestrian crossings during construction to allow full access through campus.
  • maintaining the current level of available parking spaces along the corridor to meet the high-priority parking needs.
  • minimizing any disruption to a major communications duct bank that ran the length of the corridor and the reconstruction of an electrical vault had to remain energized during the project.
  • the need for updated lighting along the corridor.

    new crossings were designed to accommodate a high volume of pedestrian traffic.

design expertise creates a better campus experience

the final design created by snyder & associates maintained the one-way vehicle traffic, but added a one-way, contra-flow bicycle lane for northbound bike traffic, greatly improving bicycle safety. the width of the adjacent sidewalks was increased and an additional walkway was constructed to accommodate the high volume of pedestrian traffic. the extra walkway was designed to help minimize pedestrian crossings. as needed, three pedestrian crossings remained open during the entire construction process.

parking along the corridor was also greatly improved in the final design. it not only maintained the number of parking stalls by using a combination of parallel and diagonal parking spaces, the new design also relocated several spaces which opened up the view in front of beardshear hall. the alignment of the roadway was designed to minimize the disruption of the communications duct running the length of the corridor. this also helped to address the reconstruction of the electrical vault. crews were able to keep it energized at all times throughout the project.

as part of the study, snyder & associates provided iowa state university a photometric analysis for various lighting options within the corridor. the university chose to replace the existing lights with new, decorative poles and led fixtures.

additional improvements decrease future costs

snyder & associates advanced a developmental specification, subsequently approved by the iowa dot, for the use of a high build, waterborne traffic paint for all pavement markings. the pavement markings also included pavement grooving to extend the life of the markings. additionally, the overall width of the roadway was reduced from 24′ to 20′. due to this decrease in hard surface area, the amount of stormwater piping and intakes were minimized. both of these features incorporated by our firm greatly reduced future maintenance costs for the university.

funding assistance provided by snyder & associates

in addition to the normal services provided by our firm for this project, which included the initial topographic survey and full-time construction oversight, snyder & associates also developed a concept statement for the university to acquire iowa dot institutional roads funding that helped pay for the project. due to the amount of construction required on the morrill road project and critical time constraints, work began during the spring semester. the road was opened to traffic one week prior to the following fall semester.

client

iowa state university

client type

project type

rich voelker, p.e.

rich voelker, p.e.

transportation business unit leader

related projects

overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
newly poured concrete roadway|construction workers pouring concrete for stormwater drainage|cement truck pours wet concrete onto newly established roadway|construction workers in large hole for sanitary sewer|crews lay wet cement

major street reconstruction project benefits waverly community

the 4th street sw corridor is a busy north/south thoroughfare in the heart of the waverly community. this busy stretch provides access to the bustling business district...
|construction workers under bridge|bridge underpass|i-35 bridge construction|pedestrian sidewalk on bridge|under interstate bridge|google maps of i-35 bridge in iowa|side view of an interstate bridge|concrete bridge in iowa|concrete sidewalk bridge|busy traffic and a gas station||||||||||

corporate woods drive bridge over interstate 35 supports new development

the rapid population growth in ankeny, iowa can in large part be attributed to its proximity to des moines and the easy access to interstate 35. to support new site...
diamond grinding construction truck.|fault line in a road being measured||large construction truck and workers on a road.|pavement technology machine.|road construction|

pavement structural integrity analysis drives kiwanis avenue rehabilitation

when the busy kiwanis avenue corridor in sioux falls began to show signs of deterioration, city leaders turned to the professionals with snyder & associates to...

more than 45 years