radial collector wells strengthen water supply for atchison, kansas

reliable access to safe drinking water is essential for any community, and the city of atchison is taking proactive steps to enhance its raw water supply system. as part of these efforts, snyder & associates provided critical engineering support for the city’s new radial collector wells, designed to meet the growing water demands of residents, industries, and rural water customers. this innovative system will help supply the city’s water treatment plant, which requires a peak flow capacity of approximately 9 million gallons daily (mgd).

project scope & site challenges

the city’s water treatment plant is situated approximately 8,300 feet from the existing raw water pumping station and more than 12,000 feet from the new radial collector wells. compounding this challenge, the plant is located approximately 200 feet higher in elevation than the well field. to efficiently integrate the new wells into the system, 4,000 feet of new raw water main is being constructed to connect with the existing raw water pipeline. the project design prioritizes maximizing the use of the existing infrastructure while maintaining the operation of the current raw water intake pump station.

addressing surge control & system integrity

given the significant water volume being supplied, high static head, and high pumping head, the project required extensive analysis to implement effective surge control measures. to compound the complexity, the existing raw water main presents some unknowns due to its original design and condition. currently, daily operating flow and pressure data provide the only confirmed information on its performance. to safeguard potentially fragile sections of the pipeline, the new system has been engineered to prevent surge pressures from exceeding those currently experienced in daily operations.

high-capacity pump stations & operational flexibility

each radial well functions as a high-capacity pump station, equipped with three vertical turbine pumps powered by 500-horsepower electric motors. these pumps are controlled by variable frequency drives (vfds), allowing smooth startup and shutdown along with precise adjustments to match water demand. the system offers significant operational flexibility as pumps can function independently, in coordination with other pumps at the same well, in tandem with the second well, or in conjunction with the existing raw water pump station.

advanced control & reliability features

to further enhance reliability, specialized pump check valves and mechanical surge relief equipment have been incorporated into the system to prevent damage during unexpected shutdowns, such as power failures. additionally, both wells are fully integrated into the city’s scada system, enabling centralized control from the treatment plant. given the remote location of the wells and operational complexity, the control systems have been designed for maximum reliability, intuitive operation, and resilience against disruptions.

emergency preparedness & flooding considerations

an added challenge for the project is the potential for seasonal flooding, which could occasionally require boat access to the well sites. to mitigate operational risks, each well site is equipped with an emergency power system featuring large natural gas-fired emergency generators with automatic operation, ensuring uninterrupted service even in the event of power outages.

sustainable water future for atchison community

through strategic engineering and system integration, the city of atchison’s new radial collector wells will provide a more resilient and efficient raw water supply, reinforcing the city’s commitment to reliable water access for years to come. snyder & associates is proud to contribute to this critical infrastructure improvement, partnering with lre water to deliver innovative, long-term solutions that secure atchison’s water future through essential hydrogeologic expertise.

client

city of atchison

client type

project type

darin jacobs, p.e.

darin jacobs, p.e.

water resources work group leader

related projects

water tower behind 世界杯足球比赛预选赛
 works building|concrete water tower base being constructed|west burlington storage tank with small hole|workers buildig the tower base|painted water tower top being raised into place

west burlington upgrades water storage tower & booster station

the community of west burlington in the southeast corner of iowa relies on two water storage facilities to meet the town's water needs. while the city sources its water...
kimballton water tower above trees in blue sky|large machine digging trench for blue water pipe.|kimballtons new water next to shorter

kimballton community benefits from improved drinking water system

the western iowa town of kimballton is the quintessential rural community that faced the familiar challenge of an aging water infrastructure system needing...
||||||view of lake through trees

creston water treatment plant assessment and suggested facility renovations

when it came time for a condition assessment on the current water treatment facility, creston water works turned to the experts at snyder & associates to complete...
footing foundation being placed|pre-made brick walls are pieced together|three large white tanks

creative solutions for toledo water treatment plant upgrades

snyder & associates worked with the city of toledo to create a new water treatment facility that specifically focused on removing radium.

|blue and white reverse osmosis system|

reverse osmosis water treatment plant improvements: oakland, iowa

in 2012, it became clear to city officials that the water treatment system in oakland, iowa, was no longer meeting its water supply demands. as businesses, including a...
|

design & construction of new electrodialysis reversal (edr) water treatment plant: walnut, iowa

this project involved the construction of a new facility to treat drinking water from deep jordan sandstone wells containing excessive amounts of naturally occurring...
inside view of new water treatment plant||||two lime storage lagoons|large circular softener unit|||entrance to camp dodge

lime softening system upgrade for iowa national guard base

camp dodge strives for water independence to meet future demand located west of northwest beaver drive in johnston, camp dodge has been cemented as a community staple...
|||

full-scale reverse osmosis water treatment system: atkins, iowa

water system study finds high nitrite levels in raw water snyder & associates prepared a water system study for the city of atkins, iowa to address capacity issues,...
front entrance of new water treatment facility|pipes with turn wheels controlling influent connection points|control panel that runs reverse osmosis system|inside view of new reverse osmosis system building|back entrance to reverse osmosis system area

reverse osmosis system addition improves panora water treatment plant

source water contaminants drive in-depth analysis utilizing a surface water treatment facility, the city of panora in central iowa, has encountered challenging source...

more than 45 years

serving clients around the country

db+