raccoon river valley trail design packs user-friendly amenities

creating one of the nation’s longest paved recreational trail loops

several former railroad depots along the trail were rehabilitated for use as trailhead destinations.

extending from the walnut creek crossing along hickman road in clive to the community of jefferson, the raccoon river valley trail (rrvt) has been a work in process since the late 1980s. most of the trail is constructed on a former railroad right-of-way that had long ago been abandoned by the railroad companies. the new life given to these rail lines by this rails-to-trails project is one more step in making iowa a leader in multi-use trail construction.

the design team with snyder & associates became involved with this rails-to-trails project in the late 2000s. our team was tasked with designing a 35-mile trail extension through dallas and guthrie counties. this extension established one of the longest paved, recreational trail loops in the nation at 72-miles-long and connected 15 communities and four counties in central iowa. it also completed a critical section of the 3,700-mile-long  great american rail-trail route.

railroad bridge retrofits & refurbished depot trailheads

this multi-year project involved three railroad bridge rehabilitations and retrofits, two box culvert improvements, and one box culvert replacement. 2022足球世界杯小组赛赛程 , a subsidiary of snyder & associates, prepared detailed plans to convert the railroad structures for trail use. the trail sections our team designed for the north loop extension are 10-foot-wide concrete paths that follow the rail-banked corridor.

paving construction for trail

crews pour a path between perry and minburn.

because the trail system passes through many communities that formerly utilized the railroad network for passenger travel, abandoned depots were present in several towns along the proposed path. depots in the communities of dawson, perry, and minburn were rehabilitated for use as trailhead destinations. these upgrades include restrooms, freshwater access, vending machines, shelter areas, and historic interpretive displays.

due to funding schedules and local budget constraints, this 35-mile trail extension was divided into numerous construction projects that spanned several years. this brief timeline outlines the major accomplishments under each construction season:

  • june 2008 — an 894-foot-long bridge retrofit and two box culvert upgrades between the towns of dawson and perry
  • april 2009 — 1.77-mile waukee trail extension
  • august 2009 — 6.74-mile dawson to perry paving completed
  • august 2010 — 5.4-mile dallas center to waukee connection
  • september 2010 — .27-mile trail through minburn
  • september 2011 — 5.59-mile trail connection between perry and minburn
  • june 2012 — 5.88-mile trail connection between minburn and dallas center that included a 13-foot-long railroad bridge retrofit (this project represents the smallest retrofit our team has ever completed)
  • june 2012 — 2-mile trail section between jamaica and dawson completed
  • august 2012 — 2-mile trail section between herndon and jamaica, including a box culvert replacement

while many portions of the trail remained open during trail additions, a grand opening of the completed 89-mile trail (including the 72-mile trail loop) was held on june 1, 2013.

multi-disciplinary service offering & inter-agency coordination streamlines trail project

the relatively flat terrain creates the perfect environment for long trail rides.

the snyder & associates team provided lead design services on this multi-year project that encompassed land surveying services, including preliminary survey, boundary survey, construction staking, and construction observation. professional trail design services included trail alignment and profile design, and bridge and culvert rehabilitation detailing. wetland and stream delineation along with 404 permitting assistance, a bat habitat survey, and a categorical exclusion for funding purposes were also provided by our environmental services team.

in addition, our team performed a hydrologic and hydraulic analysis of the box culvert between herndon and jamaica that needed to be replaced. we also coordinated with the iowa department of natural resources (dnr) and the u.s. army corps of engineers (usace) on the submittal of a joint application for the box culvert replacement.

in conjunction with the design of the project, we provided cost opinions for use in funding applications, detailed construction cost opinions for each segment, and obtained the national pollutant discharge elimination system (npdes) permit for the projects on behalf of our clients. since the trail crossed state highways 44 and 169, extensive coordination with the iowa department of transportation (dot) was also required. the first three projects in this long series were let through the iowa dot using iowa dot specifications. our team administered local lettings for each of the remaining projects utilizing statewide urban design and specifications (sudas) criteria.

trail building for the future

plans to further strengthen iowa’s vast trail network through the let’s connect trail project are continuing with snyder & associates serving as the lead trail design firm. this includes a 9-mile trail segment that will link the raccoon river valley trail with the high trestle trail between perry and woodward. much like the north loop of the rrvt, this trail section is being built in phases to meet funding allotments. during the summer of 2018, 1.5 miles of the trail was built starting in perry and working east. phase two was constructed just west of woodward in 2019. phases three and four are scheduled to wrap up in late 2021 or the spring of 2022. when completed, this trail will create a first-class amenity for the region by connecting two of the most popular trail systems in the state.

client

dallas county

client type

project type

rich voelker, p.e.

rich voelker, p.e.

transportation business unit leader

related projects

a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
||||||indian creek trail connection ribbon cutting

indian creek trail connection unites key marion neighborhoods

having doubled in population over the past three decades, the cedar rapid’s suburb of marion has been the dual beneficiary of a rapidly expanding metro area and the...
fixed up railroad bridge into a trail bridge|summer time light hits the trail bridge and water below|engineering interns learning how to pave the roads|shaded trail bridge|brand new trail bridge with beautiful greenery|black gated fence around a trail route|construction happening on a old railroad bridge

river’s edge trail connects iowa’s heartland

while it's been many years in the making and still has many miles remaining to construct, the river's edge trail is ideally positioned to take advantage of the scenic...
bike trail winding through the green forest|trail with black fencing one either side|freshly paved trail goes uphill towards a tree line|incomplete trail bridge|map of the rolling prairie trail system|paving underway in the middle of a storm|trail water drainage

rolling prairie trail provides rural link across iowa’s scenic landscape

when rail transportation in iowa peaked in the early 1900s, the state was home to more than 10,500 miles of track. as automobiles became the preferred mode of...
|prairie city welcome signage town square|large green plants and trees on either side of a bike trail|winding trail heads towards a casey's gas station|child bikes a trail through a small town in iowa|small town welcome sign with a trail and road next to it|prairie city town square||

red rock prairie trail provides scenic recreational opportunities

most trail 2022世界杯32强预选赛 in central iowa over the past two decades has centered around making connections. whether connecting small communities or social venues, providing...
bridge on the railroad highway trail|pre-construction of the railroad highway trail|bridge on the railroad highway trail|trail pavement of the railroad highway trail|map of the railroad highway trail

railroad highway trail connects western iowa communities

now standing at more than 50% complete, the dream of a completely off-roadway, multi-use trail network spanning the entire country keeps taking steps to becoming...
high trestle trail pedestrian bridge at night|oralabor road trail bridge|many citizens gathered for a bike ride|oralabor road trail bridge under construction|the snyder and associates transportation team for oralabor road trail bridge|many bicyclists riding along the high trestle trail bridge|family smiling as they ride across a trail bridge on bikes||||rich voelker

pedestrian tunnel & bridge showcase trail extension in ankeny — high trestle trail

shortly after the high trestle trail bridge over the des moines river was completed in 2011, the focus quickly shifted to continuing the trail south through the ankeny...
thick metal signage with large text|bicyclist ride past the council bluffs fire station|before construction on first ave|bicyclist happily wave at on down the bike trail|first ave trail in council bluffs|asphalt trail along high school athletic facilities|council bluffs bike trail

first avenue trail creates council bluffs connection

formally adopted by the city of council bluffs in 2015, the west broadway corridor plan was developed to guide the transformation of this busy stretch of roadways into...

more than 45 years

serving clients around the country

db+