quiet zone improves quality of life for clinton recreation hub

communities coexisting with train traffic in america

located along the mississippi river on iowa’s eastern border, the city of clinton regularly experiences a disruption common to many communities — the ear-splitting noise of train horns as long freight trains move through town. the riverfront is home to several popular recreation destinations that are regularly enjoyed by citizens, including riverview park, swimming pool, rv campground, and bandshell, as well as the clinton marina and nelsoncorp field, home of the clinton lumberkings. the frequent noise pollution from loud train horns severely impacts the quality of enjoyment for visitors taking part in all of these activities.

in 2018, clinton city leaders met with local business owners, the canadian pacific railroad, and the federal railroad administration to discuss potential crossing improvements along the riverfront. as recognized experts in the field, the professionals with snyder & associates were brought in to help guide the complex process of ensuring a seamless and efficient result for the quiet zone implementation.

what comprises a “quiet zone”?

when a quiet zone is established, improvements are made to the safety of at-grade railroad crossings. improvements can take the form of adding roadway medians so that cars can’t drive around crossing gates, adding crossing gates, and closing crossings. once those improvements have been made, trains are no longer required to blow their horns through the quiet zone, except in the case of an emergency. these steps are aimed at helping to improve the quality of life throughout the clinton riverfront area.

effective & cost-efficient crossing improvements implemented along clinton riverfront

crossing closures

the least expensive and most effective way to improve safety at a railroad crossing is to close the crossing. along the mile-long project area in the clinton study, there are eight 世界杯足球比赛预选赛 roadway crossings, some of which lack warning signals and gates. the traffic counts at several of these crossings are low and alternate roadways exist for traffic to reach areas that might otherwise be isolated due to a crossing closure. with that in mind, it was recommended that the following three crossings be closed, 4th avenue south, south 1st street, and 4th avenue north.

two-quadrant gates with medians

most of the existing gates installed at crossings within the proposed quiet zone are two-quadrant gates. the two-quadrant gate-style means that gates are only present on the approach side of the crossing for oncoming traffic. currently, an impatient driver could drive around these gates without much trouble. to improve safety, medians can be added to the roadway to make this maneuver more difficult. the main criterion is that medians must be a minimum of 60 feet long on each side of the tracks. this typically eliminates any crossings that have side roads or major entrances and driveways within that area. the following two crossings will have medians installed with two-quadrant gates, 6th avenue south and 2nd avenue south.

four-quadrant gates

another infrastructure improvement to ensure that traffic does not drive around gates is to install them at all four quadrants of the intersection, on the approach and trailing sides of the roadway crossing. four-quadrant gates are generally used instead of two-quadrant gates with medians when there are side roads or important access points close to the railroad crossing. the following three locations will have four-quadrant gates installed, 5th avenue south, 6th avenue north, and 9th avenue north.

additional measures taken to improve the riverfront & pedestrian safety

improvements to the crossings in the riverfront area weren’t the only upgrades in this expansive project. because of the multiple crossing closings and other crossing changes, new access points had to be created at several locations. this included the relocation of the roadway leading to city facilities north of 4th avenue south. the new access approaches from the south and the existing access road connecting to south 1st street was removed. additionally, a new parking lot for the skatepark was constructed near south 1st street and several lightly traveled portions of roosevelt street were removed.

although the rules for the establishment of a quiet zone address the safety of vehicles, they do not address the safety of pedestrians within the quiet zone. because the canadian pacific railroad tracks run adjacent to parks and other amenities used by the 世界杯足球比赛预选赛 , it’s important to add protections for pedestrians using those facilities. to that end, multiple fences were added to separate the tracks from pedestrian-heavy areas. additionally, a sidewalk close to the tracks was removed while other sidewalks near individual crossings were improved.

snyder & associates has extensive experience guiding communities through this critical process and was vocal in making the clinton quiet zone a success. while the primary focus of quiet zone rules are to provide communities a way to silence train horns, maintaining an adequate level of safety that compensates for the risk that silencing train horns creates is the ultimate goal. without the constant blare of train horns interrupting outdoor (and sometimes, indoor) activities, the positive impact on people’s lives is immeasurable.

client

city of clinton

client type

project type

no team members assigned to this project.

related projects

ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
intersection map||map of us 30 iowa

improved access & safety needs prompt interchange operations report

a wide-reaching 2022世界杯32强预选赛 study started in the 1980s by the iowa department of transportation (dot) gave priority status to the widening of u.s. highway 30 across much...
|bettendorf-26th-street|map of street light data|traffic flow diagram

bettendorf city-wide signal retiming project improves traffic efficiency

bettendorf city leaders retained the services of snyder & associates to update traffic signal timing along numerous corridors throughout the city.

|aerial view of us 61 study area|vehicles entering a signalized intersection|aerial view of us-61 and mason road proposed corridor improvements|

corridor study of u.s. highway 61 through burlington emphasizes safety & efficient operations

the iowa dot tasked the traffic professionals with snyder & associates to conduct a traffic study along the busy, u.s. 61 corridor.

ada complaint new sidewalk|new ada compliant sidewalk with red domes by street|construction of new ada compliant sidewalk surrounded by dirt|non-compliant sidewalk|||sidewalk turning before tree|

iowa dot sidewalk improvement project requires extensive right-of-way services

multidisciplinary service offering is just the ticket for ada compliance project in their ongoing efforts to meet the compliance requirements of the americans with...
sky view of farmland and interstate|waukee street design poster|black and white street design plans|multicolored roadway map

waukee street design guide provides detailed roadway plan for community

the transportation 2022世界杯32强预选赛 experts with snyder & associates recently completed a street design guide and major streets plan to provide waukee with a roadmap for...
|||lush green stormwater culvert|black and white map with project area outlined in red|traffic backed up bumper to bumper|||||

iowa highway 17 realignment study leads to overpass construction

snyder & associates was tasked by the iowa dot with performing a realignment study that would assess the practicality of constructing a grade separation over the...