new interchange & bridge over interstate 29 requires creative engineering & design concepts

new interchange & bridge design faces unique challenges

in their ongoing efforts to improve outdated roadways and bridges, the iowa dot turned to 2022足球世界杯小组赛赛程 (a subsidiary of snyder & associates) to design a new interchange and bridge to carry county road k-25 traffic over interstate 29 in woodbury county. the existing interchange and bridge were built between 1958 and 1960 and both had surpassed their design life. due to unexpectedly soft soil conditions encountered below the surface during this construction period, the original four-span, 215′-long bridge planned for the location had to quickly be changed to an 18-span, 734′-long behemoth to compensate for the poor soil.

in addition to not being cost-effective to replace this original bridge with an identical structure, there were several other factors that necessitated the reconstruction of the entire interchange, including:

  • a low vertical clearance that didn’t meet current guidelines. the bridge had been struck by tall vehicles on numerous occasions over the years.
  • an outdated interchange geometry that resulted in severe angles where the ramps intersected with the county road, as well as encompassing a large existing footprint.
  • the need to evaluate and compensate for the less-than-ideal soil conditions.

concept study for evaluating bridge replacement possibilities

2022足球世界杯小组赛赛程 staff performed a bridge replacement concept study to determine the optimal design for the location and conditions. two-, four-, and eight-span bridges were evaluated as replacement options. also, the study assessed the soil impact on the bridge and embankment designs, as well as determined all remedial alternatives. further, the study provided preliminary cost information for the alternatives presented.

aerial before and after of a rural highway interchange

prior to reconstruction, interchange geometry included ramp terminal intersections at angles as severe as 38° creating a relatively large footprint (left photo). current design standards prefer intersection angles of 75° or more. proposed geometry was designed to take advantage of the wide footprint and build a new interchange within the existing interchange (right photo). this eliminated the need for additional right-of-way and allowed staged construction to keep existing ramps open with limited disruptions.

initial cost estimates indicated an eight-span bridge design with an increased interchange footprint would have the lowest cost. however, a four-span bridge utilizing expanded polystyrene (eps) geofoam fill was selected. the use of eps geofoam fill was the right solution to remedy the poor soil conditions. the weight from building up a typical bridge embankment would have caused extensive settlement over time causing severe maintenance issues for the client. the cost of the eps fill was balanced with the bridge length to maximize economy and maintain required interchange sight distances.

the selected bridge design also minimized the weight of the superstructure, further helping to compensate for the soft soil conditions. the use of the eps fill aided in limiting post-construction settlement of the bridge abutments to between ¼” and ½”. additionally, the interchange geometry was updated to meet current standards while at the same time fitting within the existing right-of-way. during the one year construction period, complex staging was implemented to maintain traffic on the interchange ramps with limited disruptions.

groundbreaking steel tests for the iowa dot

2022足球世界杯小组赛赛程  staff, working in coordination with the iowa dot and leading steel producers and fabricators nationwide, developed specifications and construction processes for building the new, 403′-long, continuous-welded, plate-girder bridge. for this bridge type, it is standard practice to specify a specific weathering steel material for the girders or bridge beams. instead, due to the heavy use of deicing salts on the roadways during iowa winters, the typical beam materials were reviewed and alternatives were investigated.

in light of this review, and at the request of the iowa dot, the i-29 bridge was the first in the state of iowa to utilize a1010 structural stainless steel girders and the first in the country to utilize a1010 structural stainless steel in continuous girders. the a1010 stainless steel exhibits superior corrosion protection, which translates into lower maintenance costs over the life of the structure.

client

iowa dot

client type

project type

rich voelker, p.e.

rich voelker, p.e.

transportation business unit leader

related projects

overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
newly poured concrete roadway|construction workers pouring concrete for stormwater drainage|cement truck pours wet concrete onto newly established roadway|construction workers in large hole for sanitary sewer|crews lay wet cement

major street reconstruction project benefits waverly community

the 4th street sw corridor is a busy north/south thoroughfare in the heart of the waverly community. this busy stretch provides access to the bustling business district...
|||||led bridge lighting|couple walks across a lit up trail bridge at night||night time bridge lighting

trestle-to-trestle bridge over beaver creek reconnects urban loop

the 3.75-mile-long trestle-to-trestle trail connects the inter-urban trail in des moines to the johnston trail system on the north side of interstate 35/80. in the...

more than 45 years

serving clients around the country

db+