multiple services provided for jasper street reconstruction effort

municipal engineering services leads to roadway reconstruction project

the city of pleasantville was faced with the task of upgrading highway g 40 (locally known as jasper street), the main east/west corridor through the heart of town. this almost one-mile-long section of jasper street connects highway 5 on the west side of town with business highway 5 to the east. it’s also the main conduit leading to red rock lake. the street had fallen into severe disrepair and was inadequately sized to handle a traffic flow that had increased over the years.

snyder & associates engineers had been providing municipal engineering services for the city of pleasantville for several years before this project. it was a natural progression to have our team design and plan the roadway expansion. through numerous recommendations and revisions, the snyder & associates engineers came up with a design that was ultimately approved by the city.

our team determined the best course of action was to expand the existing 27′-wide roadway (narrower in some parts) to 31′ wide. the plan also called for adding 5′-wide sidewalks on each side of the new street. the existing sidewalk network was spotty at best and was only on one side of the street. a new sidewalk system would create a safer environment for pedestrians and vehicle traffic alike. additionally, a complete water main replacement would be performed along the corridor in conjunction with new stormwater services.

due to problems with localized flooding during periods of heavy rain, a solution was necessary to divert stormwater. since space was limited along the corridor, using an above-ground detention pond was not feasible. ultimately, a plan was devised to create a large underground detention vault on a piece of property adjacent to the roadway. the vault consists of large sections of corrugated plastic placed on a compacted bed of gravel. once covered, stormwater is diverted to the basin through normal channels where it’s temporarily stored. it’s then released through a series of outlet pipes that are specifically designed to let water out in a controlled manner to mitigate flooding issues.

3-d visualization & in-house, right-of-way acquisition services simplify process

rendering of roadway

3-d visualization software allows residents to “see” the finished project before it starts.

世界杯足球比赛预选赛 buy-in was critical for a project of this nature. to that end, our design team was able to use 3-d visualization software to show several residents what the completed street improvements would look like before work was started. this gave homeowners in the reconstruction area a thorough understanding of how their property would be impacted by the changes.

the proposed design would impact 80 property owners with right-of-way acquisition issues. since most of the affected right-of-way areas were narrow strips of property that simply required fee acquisition and temporary construction easements, the city felt they could best serve the community by handling the 80 acquisition parcels with city staff. however, the complicated task of assembling and completing all of the necessary documents was too intensive for the available city resources.

with an in-house, right-of-way acquisition team, snyder & associates was able to quickly step in to assist with the administrative portion of the project. the right-of-way team worked with the city and their attorney on completing all of the documents and easements for each of the 80 properties affected by the project.

our right-of-way team provided all of the administrative support for the city to complete and present the necessary documents for use by their staff. to meet a tight turnaround deadline, we partnered with a third-party appraiser to complete a project data book containing property valuations. additionally, our team ordered title certificates, completed easement documents, created compensation estimates, and wrote cover letters to the owners on the city of pleasantville letterhead. close work with the city attorney was also required to complete the warranty deeds.

our team provided all of the time-sensitive document packets ready to present to the property owners. this allowed the city staff to focus on negotiations and explaining the project with the landowners without getting delayed by the administrative duties. as design changes were requested, our right-of-way team was able to quickly coordinate with the engineering team to make immediate adjustments. this meant the modified design documents were proffered in a prompt manner to keep the negotiations moving forward.

snyder & associates provides a unique offering to our clients with our in-house, right-of-way team working side by side with the engineering design team. this ability to move seamlessly through the design and negotiation process is a tremendous benefit to our clients — keeping projects on task and on time. our service with the city of pleasantville is just one example of how we can customize our right-of-way services to meet our client’s needs.

funding assistance improves project success

similar to other projects our team has completed for the city, snyder & associates found multiple funding sources that brought this project to fruition. we provided grant application assistance by obtaining two community development block grants (cdbg) and utilized the iowa srf program, as well. additionally, tax increment financing (tif) and local option sales tax (lost) funding were procured for this project. our knowledge and years of experience with transportation funding options allow the communities we work for to get the best results with the limited resources available.

phased construction helps reduce disruptions

to minimize the disruption to residents, a carefully planned construction schedule was created for this project. it was anticipated that two construction seasons would be necessary to complete the entire one-mile stretch of roadway. with that in mind, work began on the west end and proceeded east, replacing the water main and storm sewer pipes, as well as pouring new pavement in roughly 1,000-foot sections. a limited number of days was written into the construction contract to try to ensure that the project was completed as quickly as possible.

currently, crews are working on the final sections of the project with a substantial completion date anticipated for mid-summer of 2020. when the roadway portion is finished the sidewalks will be added, along with new led streetlights and a permanent speed sign to remind motorists to be safe. the reconstruction of this main roadway aims to bring more traffic into and through the town, with the intent of supporting increased commerce at local businesses.

client

city of pleasantville

client type

project type

nathan carhoff, p.e.

nathan carhoff, p.e.

civil engineer

related projects

||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...
overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade