locust street bridge reconstruction conveys modern aesthetic on riverfront

opened in 1909, the locust street bridge was one of a series of four bridges (locust street, walnut street, grand avenue, court avenue) built between 1907 and 1918 spanning the des moines river in the heart of iowa’s capital city. over the years, these ornately decorated, reinforced-concrete arch structures became symbols of the city’s rich history. they also provide a critical link connecting the east village with the downtown des moines business district.

in the late 1960s, the locust street, walnut street, and grand avenue bridge decks were reconstructed along with other improvements. as a cost-saving measure, most of the original ornamentation was removed, leaving only the arched spans and piers. after another half-decade of use, the time came again in the 2010s to either renovate the existing structures or build entirely new bridges. focusing on the grand avenue bridge, the professionals with 2022足球世界杯小组赛赛程 were brought on board to help develop the designs for completely replacing this iconic structure.

deteriorated structure requires complete replacement

bridge over river with cars driving across

the newly reconstructed grand avenue bridge served as the model for the locust street bridge.

fast forward several years, with the reconstructed grand avenue bridge open and operating as intended, the team from 2022足球世界杯小组赛赛程 was once again tasked with performing the same duties for the replacement of the locust street bridge. much like the bridge on grand avenue, the engineering team found the locust street bridge to be structurally deficient with scour-critical concrete piers and poor hydraulic performance.

the 2022足球世界杯小组赛赛程 team developed plans for a pretensioned, prestressed concrete (ppc) beam bridge that would maximize the use of standard construction details and could be constructed for under $10 million. the design copied many of the same aesthetic details as the newly reconstructed grand avenue bridge, including the use of scalloped metal panels along the sides of the bridge. as already established, this design satisfies the requirements of efficiency and economy.

unique features, bridge details, & design challenges

des moines bridge and sidewalk

the new locust street bridge provides ample room for on-street parking and shared bicycle lanes.

while the four-span, 446-foot long, 42-foot wide, concrete-beam bridge is 12-feet narrower than the grand avenue bridge, it was designed to support two lanes of traffic, on-street parking, and 12-foot-wide sidewalks on both sides. a non-standard deck cross-section was incorporated to raise the pedestrian sidewalk above the roadway. a modified crash rail protects pedestrians, while the raised sidewalks with extended overhangs enhance the dramatic effect of the scalloped fascia panels.

the engineering team also added beamlines under the raised pedestrian sidewalk to support a snooper truck for future under-bridge inspections and maintenance. the additional sidewalk load resulted in nonuniform beam reactions requiring careful analysis to determine the proper reinforcing strand and shear stirrup patterns, as well as bearing pad sizes. further, more than 18 separate utility conduits were incorporated into or below the new bridge deck along with a new, 20-inch water main.

also like the grand avenue bridge location, the bridge abutments at locust street were designed to penetrate the levee on both riverbanks while still maintaining flood protection for the city, with the new bridge abutments sized to match the locations of the floodwalls. to minimize excavation and disturbance to the existing floodwalls, large portions of the original massive abutments were left in place. the new prototypical, semi-integral abutments were developed to account for the pile fixity caused by the rigid connection/incorporation into the existing abutments.

with the pier footings for the new bridge supported on steel piles extending to bedrock, one less pier was required, increasing the flow area of the river by nearly twenty percent. additionally, the bridge is designed to withstand the hydraulic effects of a 100-year frequency flood event and the intense water pressure acting against the bridge fascia.

expert coordination & collaboration lead to aggressive build schedule

bridge construction temporary causeway

temporary causeways aided crews during the bridge construction process.

following the demolition of the previous structure, construction began on the new bridge. the shallow river depth allowed for the use of temporary causeways during construction with a minimal impact on the environment. even though work was temporarily delayed in 2019 due to high river levels, work wrapped up in september of 2020.

the 2022足球世界杯小组赛赛程 team, along with parent company snyder & associates, made the project possible by collaborating to provide the development of project concept statement, preliminary bridge and roadway plans, hydraulic analysis and documentation, final bridge and roadway design plans, as well as the extensive coordination and development of aesthetic details. also, the design team provided rapid response service for issues that arose during construction. these included addressing unanticipated site conditions, pile driving inquiries, and general construction observation.

with the grand avenue and locust street bridges complete, plans are underway to let the walnut street bridge in 2022. the innovative aesthetics on the new bridges is viewed as a visual complement to the iowa women of achievement bridge located just upstream from grand avenue and helped to transform the downtown river area for a new generation.

client

city of des moines

client type

project type

no team members assigned to this project.

related projects

aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
|||||led bridge lighting|couple walks across a lit up trail bridge at night||night time bridge lighting

trestle-to-trestle bridge over beaver creek reconnects urban loop

the 3.75-mile-long trestle-to-trestle trail connects the inter-urban trail in des moines to the johnston trail system on the north side of interstate 35/80. in the...
fixed up railroad bridge into a trail bridge|summer time light hits the trail bridge and water below|engineering interns learning how to pave the roads|shaded trail bridge|brand new trail bridge with beautiful greenery|black gated fence around a trail route|construction happening on a old railroad bridge

river’s edge trail connects iowa’s heartland

while it's been many years in the making and still has many miles remaining to construct, the river's edge trail is ideally positioned to take advantage of the scenic...
|prairie city welcome signage town square|large green plants and trees on either side of a bike trail|winding trail heads towards a casey's gas station|child bikes a trail through a small town in iowa|small town welcome sign with a trail and road next to it|prairie city town square||

red rock prairie trail provides scenic recreational opportunities

most trail 2022世界杯32强预选赛 in central iowa over the past two decades has centered around making connections. whether connecting small communities or social venues, providing...
a winding trail moves towards the wanatee bridge|wanatee pond project|wanatee pond project|wanatee bridge sits over a stream of water surrounded by native plantings|wanatee pond project|civil engineer lindsay beaman and and environmental scientist nichoel church receive acec award 2022|new steel bridge over wanatee creek|pedestrian bridge in wanatee creek on a fall day|green

wanatee park upgrades improve wetlands & recreational opportunities

in november 2016, linn county iowa residents passed the water and land legacy bond issue with a 74 percent approval. this popular concept demonstrated that county...
high trestle trail pedestrian bridge at night|oralabor road trail bridge|many citizens gathered for a bike ride|oralabor road trail bridge under construction|the snyder and associates transportation team for oralabor road trail bridge|many bicyclists riding along the high trestle trail bridge|family smiling as they ride across a trail bridge on bikes||||rich voelker

pedestrian tunnel & bridge showcase trail extension in ankeny — high trestle trail

shortly after the high trestle trail bridge over the des moines river was completed in 2011, the focus quickly shifted to continuing the trail south through the ankeny...
|bridge drainage crossing||||||group of people walking a trail||

admiral trail creates welcome connection for rural community

providing recreational opportunities, creating access to local attractions and amenities, and establishing organic connections between rural communities are just a few...
|construction workers under bridge|bridge underpass|i-35 bridge construction|pedestrian sidewalk on bridge|under interstate bridge|google maps of i-35 bridge in iowa|side view of an interstate bridge|concrete bridge in iowa|concrete sidewalk bridge|busy traffic and a gas station||||||||||

corporate woods drive bridge over interstate 35 supports new development

the rapid population growth in ankeny, iowa can in large part be attributed to its proximity to des moines and the easy access to interstate 35. to support new site...
||||earth fill being removed from eureka bridge during rehab||heavy machinery widening eureka bridge|eureka bridge reconstructed arches

eureka bridge rehabilitation improves historic structure

bridge upgrades preserve iconic structure originally constructed in 1912 with only minor modifications in the intervening years, the eureka bridge in central iowa has...

more than 45 years

serving clients around the country

db+