camp dodge strives for water independence to meet future demand

located west of northwest beaver drive in johnston, camp dodge has been cemented as a community staple for over a century. this military installation where thousands of world war i soldiers once trained now serves as the headquarters for the iowa national guard, iowa’s fire service training bureau, the state police academy, and numerous other organizations.

as the facility has grown over the years, it’s been plagued by well-documented water treatment issues and inefficiencies. based on their desire to own and operate an independent, modern water source with treatment, water storage, and an onsite distribution system, iowa national guard leaders reached out to the duo of 2022足球世界杯小组赛赛程  and snyder & associates to design safe and efficient structural and water system upgrades.

comprehensive water system plan presents viable solutions

the snyder & associates team completed a comprehensive water system master plan to help determine the best course of action moving forward. our 2022世界杯32强预选赛 efforts included the presentation of options for improved water quality with increased capacity and flexibility to meet future demands and regulations. ultimately, the proposed improvements would allow the iowa national guard to serve adequate, reliable, and high-quality water to all camp residents and organizations on the base.

after an extensive review of existing facilities, it was found that raw source water from two shallow groundwater wells contained high levels of iron and total organic carbon (toc), along with small amounts of radium. the team analyzed two treatment alternatives — a lime softening system and an ion exchange process that was similar to the existing plant. detailed equipment sizing plans, functional plan view layouts and elevations, and construction cost estimates for both alternatives were completed. likewise, operational cost estimates for each alternative were provided to aid in determining which alternative would be more economical long-term.

selected lime softening water treatment system & additional upgrades

lime storage silo

the lime silo was built to provide storage of lime used in the water softening process. it also houses the lime mixing equipment and the waste lime sludge pumps.

after careful consideration and discussion, the iowa national guard committee authorized the snyder & associates team to proceed with the development of the lime softening water treatment system. this system was viewed as the most versatile treatment option, as well as the best alternative to meet the master plan directives. the lime softening process is able to reduce and/or remove hardness, iron and manganese, arsenic, total organic carbon (toc), and radium from the source water.

to provide system redundancy and allow additional capacity for the future, the final designs included two lime softeners for the facility. additionally, a bulk steel silo for lime storage was included next to the facility. this 20-ton silo provides one-month storage for peak day demand and four-month storage at average day demand.

to further support the new treatment system, an inspection of both source water wells was also recommended. since these systems were built to handle capacities from nearly 60 years ago, it was determined neither well would be able to meet current-day peak demands. our team recommended increasing the overall capacity by upgrading the existing submersible pump, motor, column, discharge piping, valves, and various electrical upgrades. this served as a near-term solution but was the most cost-effective since the expenses associated with a new supply and raw water transmission main were fiscally unachievable at the time.

at snyder & associates, providing solutions that not only overcome immediate obstacles but also consider future expansion needs is at the core of our design process. to that end, much care was taken with the design of the facility’s piping system. our team made sure to create an easily accessible network to accommodate another lime softener in the future if conditions warrant. our piping design can be quickly and easily extended for expansion.

facility upgrades make room for new water treatment systems

completed by our structural engineering team, the building addition for the lime softening equipment was added just to the south of the existing water plant facility. this building also houses the aeration process system, recarbonation, filtration, disinfection, chemical addition, and high service pumping equipment. outside the building, lime sludge lagoons and a 150,000-gallon ground storage reservoir were constructed. in addition, the existing water plant facility was renovated by removing outdated process equipment. this provided space to convert the area into an office, conference room, laboratory, storage area, restroom with shower and lockers, and control room facilities.

construction of new chemical feed room with no roof

interior of chemical feed room during construction completed by 2022足球世界杯小组赛赛程

this ambitious project was completed in multiple phases implemented over several construction seasons to make them financially feasible for the iowa national guard. the updated lime softening water treatment facility has now been operational for a number of years and has continued to meet the needs of all camp residents and organizations on the base.

client

iowa national guard

client type

project type

darin jacobs, p.e.

darin jacobs, p.e.

water resources work group leader

related projects

radial collector wells strengthen water supply for atchison, kansas

reliable access to safe drinking water is essential for any community, and the city of atchison is taking proactive steps to enhance its raw water supply system. as...
water tower behind 世界杯足球比赛预选赛
 works building|concrete water tower base being constructed|west burlington storage tank with small hole|workers buildig the tower base|painted water tower top being raised into place

west burlington upgrades water storage tower & booster station

the community of west burlington in the southeast corner of iowa relies on two water storage facilities to meet the town's water needs. while the city sources its water...
kimballton water tower above trees in blue sky|large machine digging trench for blue water pipe.|kimballtons new water next to shorter

kimballton community benefits from improved drinking water system

the western iowa town of kimballton is the quintessential rural community that faced the familiar challenge of an aging water infrastructure system needing...
||||||view of lake through trees

creston water treatment plant assessment and suggested facility renovations

when it came time for a condition assessment on the current water treatment facility, creston water works turned to the experts at snyder & associates to complete...
footing foundation being placed|pre-made brick walls are pieced together|three large white tanks

creative solutions for toledo water treatment plant upgrades

snyder & associates worked with the city of toledo to create a new water treatment facility that specifically focused on removing radium.

|blue and white reverse osmosis system|

reverse osmosis water treatment plant improvements: oakland, iowa

in 2012, it became clear to city officials that the water treatment system in oakland, iowa, was no longer meeting its water supply demands. as businesses, including a...
|

design & construction of new electrodialysis reversal (edr) water treatment plant: walnut, iowa

this project involved the construction of a new facility to treat drinking water from deep jordan sandstone wells containing excessive amounts of naturally occurring...
|||

full-scale reverse osmosis water treatment system: atkins, iowa

water system study finds high nitrite levels in raw water snyder & associates prepared a water system study for the city of atkins, iowa to address capacity issues,...
front entrance of new water treatment facility|pipes with turn wheels controlling influent connection points|control panel that runs reverse osmosis system|inside view of new reverse osmosis system building|back entrance to reverse osmosis system area

reverse osmosis system addition improves panora water treatment plant

source water contaminants drive in-depth analysis utilizing a surface water treatment facility, the city of panora in central iowa, has encountered challenging source...

more than 45 years

serving clients around the country

db+