anamosa 2nd street wastewater lift station improvements

as community leaders in mature communities know, the need for new and more efficient wastewater systems is a universal concern. this issue was an unwelcome reality for many anamosa residents near the 2nd street lift station. frequent sewage backups into homeowner’s basements had resulted in numerous insurance claim filings and additional expenses to the city. anamosa city leaders turned to the professionals with snyder & associates to tackle this concerning and costly problem.

as the designers of the city’s new wastewater treatment facility, our team was intimately familiar with the current municipal systems in anamosa. after preparing upgraded facility plans and offering solutions to upgrade the aging infrastructure, our experts collaborated with city staff to determine the most cost-effective and sustainable solution.

upgrades increase lift station & force main capacity while improving efficiency & safety

the preferred option involved upgrading the existing wastewater lift station and portions of the adjoining sanitary sewer collection system. lift stations are pumping stations used to move wastewater from a lower elevation to a higher elevation and eventually to a treatment facility.

a new, precast structure was constructed to house the lift station apparatus. the facility’s capacity was increased from 800,000 gallons per day to over 2.4 million gallons per day. to meet current iowa department of natural resources (dnr) water quality design standards, the new station is equipped with a three-pump system, where one serves as a backup. each of the three pumps is controlled by variable frequency drives, providing the pumps the capability to handle a wide range of pumping needs, ensuring operational efficiency. the plan also doubled the size of the force main piping, which extends over ½ mile along 2nd street to the west of the lift station.

vertical wastewater filtration prevents clogging & potential damage

above ground section of vertical screen

the above-ground section of the vertical screen. the pink bag collects debris that flows towards the station.

to address the problem of unnatural items clogging the system — a point of discontent for city leaders and staff in the past — a vertical screen was installed within the pipes leading towards the upgraded station. a vertical screen system accumulates and eliminates much of the debris before it enters the lift station, a proactive measure that will extend the treatment system’s longevity. additionally, the screen is self-serviced by clearing blockages through a rotation system, eliminating the unsafe task of maintenance personnel climbing into the unsanitary wells to remove blockages.

trenchless installation provides minimal disturbance

installing new sewer pipes and infrastructure in established residential areas is often a high-impact process that necessitates removing sidewalks, roadways, and driveways. for this project, however, trenchless construction technology was employed.

while it requires specialized equipment, trenchless technology has become increasingly popular in the engineering industry as it provides an environmentally and financially sound alternative to traditional excavation techniques. this non-invasive method produces less damage than open-cut techniques, using only a few entry and exit holes to push or pull the new sewer line into place. most of the new sewer was installed through this method, reducing daily traffic disruptions and eliminating the disturbance of existing underground utilities.

snyder & associates provided all construction administration and observation services for this project. our team also relayed the city’s needs to the contractor to facilitate a seamless construction process that minimized environmental impacts, continued wastewater treatment plant operations, and mitigated residential disturbance. with these upgrades in place, the anamosa sanitary system will be able to manage expected community growth well into the future.

client

city of anamosa

client type

project type

lindsay beaman, p.e.

lindsay beaman, p.e.

cedar rapids business unit leader

related projects

exposed siphon at omaha papio creek|drone map of the papio creek in omaha ne|papio creek stream

safeguarding critical infrastructure and water resources: omaha’s “papio” creek

in march 2019, the city of omaha faced a significant threat to its critical infrastructure under west papillion creek (known to locals as papio creek). a disastrous...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
slater wastewater treatment greenhouse at sunset|wastewater lagoon with aeration bubbles|greenhouse and settling pond|aerial view of large lagoon cell drained for construction|slater's new greenhouse for wastewater treatment|inside slater greenhouse with empty cells|inside of slater wastewater treatment plant with algae belts.|slater wastewater treatment plant ribbon cutting|visitors walk inside the new slater greenhouse and view rab belts|aerated lagoon at the slater wastewater treatment plant|rab belts at the slater wastewater treatment plant

slater incorporates algae to treat community wastewater

for years, the city of slater used an aerated lagoon system as its primary wastewater treatment method. however, increased awareness of pollutants and their impact on...
blue and red map of sewer system service area|corroded manhole|lime green map of pleasant hill sewer system and neighboring communities

growth in pleasant hill leads to sanitary sewer system review

snyder & associates was tasked with conducting a sanitary sewer system review, identifying long-term system and infrastructure upgrades.

large rectangle wastewater lagoon pond|snowy fields with school in distant background||large dirt hole during lagoon construction|concrete walls of the lagoons lift station placed in the ground

starmont high school’s wastewater dilemma requires speedy solution

thanks to positive client relationships and word-of-mouth recommendations, snyder & associates was hired to find a viable wastewater solution for a high...
aerial view of two large blue lagoons and operation buildings||waterside view of lagoon and gravel shores|metal walkway between two lagoons. one is rough and one is smooth.||

west burlington’s wastewater treatment plant upgraded to meet current npdes requirements

snyder & associates wastewater engineers were enlisted to develop a plan for remodeling and expanding west burlington’s existing wastewater treatment...
car sprays water while driving through a large puddle||car sprays water while driving through a large puddle|view of downtown skyscrapers at then end of a main street|satellite map with project area outlined in red|construction work in a deep trench

des moines’ sewer separation initiative prevents flooding, backups & overflows

antiquated stormwater & wastewater system fails to meet new standards when the city of des moines wastewater system was initially constructed, viable methods for...
inside of the disinfection-flow equalization tank.|inside of the sbr tank looking at the aeration piping system.|inside of treatment tank looking at piping

custom wastewater treatment solutions for growing industrial client

working with this industrial client for over ten years, snyder & associates continues to provide the most cost-effective, environmentally-sound, and...
cement building with blue roof|grey wall of electrical pannels|multiple pumps in cement room|three oval motors in a row|looking down on multi-level facility floors|

new pump station expands st. joseph’s eastside sewer system reach

the city of st. joseph selected snyder & associates to replace the outdated, undersized easton road pump station with a newly designed wastewater facility in an...
||||||new bluff creek lift station building

wastewater system analysis & 2022世界杯32强预选赛 : cedar falls, iowa

community growth prompts new wastewater system needs steady population growth and an expanding commercial base led to sewer system capacity issues in cedar falls, iowa....

more than 45 years

serving clients around the country

db+