“let’s connect” trail segment expands high trestle & raccoon river valley trail systems

evaluating trail alignment options to connect popular trail systems

the high trestle and raccoon river valley trails are two of the most popular and heavily used trail systems in the state of iowa. however, these two trails were separated by nine miles between the communities of woodward and perry. in 2014, snyder & associates began working with the dallas county conservation board to identify a feasible trail route to connect the raccoon river valley trail in perry to the high trestle trail in woodward. promoted as the “let’s connect” trail segment when completed, this project will create a significant link between these two popular destination trail systems.

former railroad right-of-way creates challenging trail alignment

many trail systems in iowa (including the high trestle and raccoon river valley trails) are fully or partially constructed on former railroad rights-of-way (row), taking advantage of existing grading and property rights agreements. our team experienced challenges with the alignment of the let’s connect trail route because the former railroad right-of-way between perry and woodward had long ago been abandoned and reverted to adjacent property owners. in some places, the right-of-way parcels remained intact. in others, the right-of-way and former grade were completely obliterated.

trail signage at the s avenue crossing as progress continues.

our team’s initial task was to find suitable routes, ideally with property owners willing to work (in principle) with the dallas county conservation board to accommodate the trail design. snyder & associates reviewed and evaluated nine separate alignments based on several factors, including the availability of row (or ability to acquire), 世界杯足球比赛预选赛 feedback, route directness, safety, anticipated construction costs, and a preliminary environmental review.

two options were identified as feasible of these nine alternative alignments, and the dallas county conservation board began to move forward with property acquisition and fundraising for the preferred alignment. during that time, our team provided easement plats, reviewed funding applications, and developed construction cost opinions for each of the five planned phases. our team also completed countersigned categorical exclusion documentation, resulting in nepa clearance for the proposed trail route.

trail funding leads to phased trail construction

with an estimated $5 to $6 million price tag to complete the entire trail, a phased construction process was implemented that would move forward as funding was secured. phase one of the project was designed to begin in perry and follow the former railroad grade out of town, ending 1.5 miles to the northeast at 130th street. construction commenced and was completed in the summer of 2018. phases two and three moved to the woodward side of the trail connection and worked to the west from s avenue to quinlan avenue. these two phases were completed in 2020 and 2021, respectively.

a dedicated trail bridge adjacent to 130th street provides trail users greater safety.

also completed in 2021, phase four of the project continued the eastward movement of the trail near perry from 130th street to m avenue. this included the construction of a new bridge over beaver creek to accommodate trail users. the snyder & associates team completed wetland delineation, engineering trail design and specifications, project letting, construction administration, and nepa clearance for all these phases. the remaining four miles between m avenue and quinlan avenue are anticipated to be completed in 2023, with the final mile or so lapsing into 2024.

our team continues to assist the dallas county conservation board as they move forward with the remaining property acquisition while additional funds are secured. donations are still being accepted and can be made directly to dallas county conservation online. when completed, this new connection of these two major trails will create an 86-mile-loop and a 118-mile-loop, providing central iowa trail users with more options.

client

dallas county conservation board

client type

project type

rich voelker, p.e.

rich voelker, p.e.

transportation business unit leader

related projects

a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
||||||indian creek trail connection ribbon cutting

indian creek trail connection unites key marion neighborhoods

having doubled in population over the past three decades, the cedar rapid’s suburb of marion has been the dual beneficiary of a rapidly expanding metro area and the...
fixed up railroad bridge into a trail bridge|summer time light hits the trail bridge and water below|engineering interns learning how to pave the roads|shaded trail bridge|brand new trail bridge with beautiful greenery|black gated fence around a trail route|construction happening on a old railroad bridge

river’s edge trail connects iowa’s heartland

while it's been many years in the making and still has many miles remaining to construct, the river's edge trail is ideally positioned to take advantage of the scenic...
bike trail winding through the green forest|trail with black fencing one either side|freshly paved trail goes uphill towards a tree line|incomplete trail bridge|map of the rolling prairie trail system|paving underway in the middle of a storm|trail water drainage

rolling prairie trail provides rural link across iowa’s scenic landscape

when rail transportation in iowa peaked in the early 1900s, the state was home to more than 10,500 miles of track. as automobiles became the preferred mode of...
|prairie city welcome signage town square|large green plants and trees on either side of a bike trail|winding trail heads towards a casey's gas station|child bikes a trail through a small town in iowa|small town welcome sign with a trail and road next to it|prairie city town square||

red rock prairie trail provides scenic recreational opportunities

most trail 2022世界杯32强预选赛 in central iowa over the past two decades has centered around making connections. whether connecting small communities or social venues, providing...
bridge on the railroad highway trail|pre-construction of the railroad highway trail|bridge on the railroad highway trail|trail pavement of the railroad highway trail|map of the railroad highway trail

railroad highway trail connects western iowa communities

now standing at more than 50% complete, the dream of a completely off-roadway, multi-use trail network spanning the entire country keeps taking steps to becoming...
high trestle trail pedestrian bridge at night|oralabor road trail bridge|many citizens gathered for a bike ride|oralabor road trail bridge under construction|the snyder and associates transportation team for oralabor road trail bridge|many bicyclists riding along the high trestle trail bridge|family smiling as they ride across a trail bridge on bikes||||rich voelker

pedestrian tunnel & bridge showcase trail extension in ankeny — high trestle trail

shortly after the high trestle trail bridge over the des moines river was completed in 2011, the focus quickly shifted to continuing the trail south through the ankeny...
thick metal signage with large text|bicyclist ride past the council bluffs fire station|before construction on first ave|bicyclist happily wave at on down the bike trail|first ave trail in council bluffs|asphalt trail along high school athletic facilities|council bluffs bike trail

first avenue trail creates council bluffs connection

formally adopted by the city of council bluffs in 2015, the west broadway corridor plan was developed to guide the transformation of this busy stretch of roadways into...

more than 45 years

serving clients around the country

db+