preserving wetlands key to new fire station for expanding community

in order to prepare for anticipated population growth and reduce response times on the southeast side of town, the city of madison recently completed the construction of a new, 20,000 square-foot, fire station. the new fire station 14 features spacious living areas, training facilities, and multiple support spaces, including small meeting rooms and a large community room for 世界杯足球比赛预选赛 use. the incorporation of open green space around the facility was designed to accommodate fire department training needs and provide the city with room to expand the facility in the future.

as the civil engineer for the project, snyder & associates provided a variety of services including:

the new fire station is located in a light industrial area. the original site was home to an old greenhouse that had been vacant for many years. the project centered on the rehabilitation and redevelopment of the area to protect wetlands and other sensitive environmental spaces east of the project site. a variety of erosion control methods including, silt fence, berms, construction staging, and temporary seeding were implemented to meet the rehabilitation effort.

permeable parking lot pavers & bioretention areas contribute to leed platinum certification

central to the project design was the city of madison’s requirement for leadership in energy and environmental design (leed) certification at a silver rating or higher. developed by the u.s. green building council (usgbc), leed is a program that focuses on

parking lot utilizing permeable pavers

permeable pavers allow for stormwater to seep through instead of creating localized runoff.

environmental and social sustainability principles to transform how buildings are designed, built, and operated. the program not only considers environmental and occupant well-being, but it also strives to use fewer resources in the construction process, which helps minimize waste.

in addition to the building’s green design, one major contributing factor that led to leed accreditation on this project was the use of permeable pavers in three separate parking areas. around the perimeter of each parking lot, permeable pavers were used to cover 4,300 square feet of space. the pavers were installed on 18″ of compacted stone to promote stormwater filtration. also, two bioretention areas with native plantings cover another 2,000 square feet of land. a 2′ layer of engineered soil comprised of compost and sand on top of another 2′ layer of rock, encourages the filtration of stormwater runoff before it infiltrates the native soil below.

the use of permeable pavers and bioretention areas will help improve water quality and replenish underground water reservoirs. together, these stormwater management facilities are expected to achieve over 90% predevelopment infiltration volumes. these green designs developed by snyder & associates were a major factor in this project garnering leed “platinum” certification, far exceeding the city’s silver certification requirement.

client

opn architects

client type

project type

no team members assigned to this project.

related projects

||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
newly poured concrete roadway|construction workers pouring concrete for stormwater drainage|cement truck pours wet concrete onto newly established roadway|construction workers in large hole for sanitary sewer|crews lay wet cement

major street reconstruction project benefits waverly community

the 4th street sw corridor is a busy north/south thoroughfare in the heart of the waverly community. this busy stretch provides access to the bustling business district...
project street after rainfall with no flooding|street signs showing 47th and holcomb location|storm drains and wet pavement with no flooding|civil engineer wes farrand and city representative receive acec award 2022|street signs at intersection of 47th and holcomb|map of closes creek construction projects

right-sizing stormwater infrastructure in flood-prone des moines neighborhood

homeowners near the intersection of 47th street and holcomb avenue in des moines are no strangers to repeated localized flooding. this issue has plagued the beaverdale...

more than 45 years

serving clients around the country

db+