grand avenue bridge replacement over the des moines river

replacing a historic bridge: innovative solutions add modern charm to grand avenue bridge in des moines

bridge with archway features over a calm river

the original grand avenue bridge

contemplating the replacement of historic structures is never an easy decision for communities to make. prominent structures have a way of growing into meaningful icons by striking a permanent pose against a city skyline. unfortunately, the forces of time and weather are relentlessly at work, causing material deterioration to even the best-built structures. having seasoned professionals involved and engaged, providing critical guidance, is a primary component in the decision-making process. a case in point is the recently completed grand avenue bridge project in des moines, iowa.

opened in 1918, the grand avenue bridge was one of a series of four bridges (locust street, walnut street, grand avenue, court avenue) built between 1907 and 1918 spanning the des moines river in the heart of iowa’s capital city. over the years, these ornately-decorated, reinforced-concrete arch structures became symbols of the city’s rich history and are even depicted on the city of des moines flag. while these bridges provided passage for horse-drawn carriages, pedestrians, and early automobiles, over decades, the grand avenue bridge, in particular, became a critical link connecting the east village with the downtown des moines business district. by a recent count, approximately 7,600 vehicles utilize it each day, making it one of the most heavily used bridges in the downtown region.

in the late 1960s, the locust street, walnut street, and grand avenue bridge decks were reconstructed along with other improvements. as a cost-saving measure, most of the original ornamentation was removed, leaving only the arched spans and piers. after another half-decade of use, the time came again in the 2010s to either renovate the existing structures or build entirely new bridges. focusing on the grand avenue bridge, the professionals with 2022足球世界杯小组赛赛程 were brought on board to help provide guidance in this all-important, reconstruct or replace decision.

deteriorated structure requires complete replacement

to kick start this process, the bridge experts with 2022足球世界杯小组赛赛程 prepared a structural evaluation report and feasibility study to aid in the repair or replace decision of the century-old arch bridge. the engineering team found the bridge to be structurally deficient with scour-critical concrete piers and immediately set about creating design options for consideration.

a modern concrete beam bridge takes full advantage of standard construction methods.

during this phase, multiple 世界杯足球比赛预选赛 participation opportunities were held to inform the community of the findings, the design process, and receive feedback relating to the design alternatives, schedules, and costs. 2022足球世界杯小组赛赛程 also enlisted the services of substance architects to help refine the design concepts. it was determined that renovating the existing bridge would cost between $7 and $10 million, but would only result in a short-term solution. rebuilding a bridge in a similar arch-style could cost more than $30 million. however, a pretensioned, prestressed concrete (ppc) beam bridge would maximize the use of standard construction details and could be constructed for under $9 million.

once the decision was made to replace the bridge with a modern concrete beam structure, an aesthetic steering committee consisting of city personnel, architects, and other local stakeholders was established to evaluate the design options and make recommendations to the city council. keeping some of the same aesthetic details as the original grand avenue bridge (namely, the iconic arches) was a critical requirement for many of the committee members. to meet this directive, the designers developed a concept that would use scalloped metal panels along the sides of the bridge reminiscent of the original arch span. this design, along with strategically-placed led accent lighting, would create a new, signature des moines river bridge while also satisfying the requirements of efficiency and economy.

unique features, bridge details, & design challenges

the spacious new bridge combines safety and efficiency for all modes of transportation.

the new four-span, 446-foot long, 54-foot wide, concrete-beam bridge was designed to support two lanes of traffic, on-street parking, bicycle lanes, and 14-foot wide sidewalks on both sides. a non-standard deck cross-section was incorporated to raise the pedestrian sidewalk above the roadway. a modified crash rail protects pedestrians, while the raised sidewalks with extended overhangs enhance the dramatic effect of the scalloped fascia panels.

the engineering team also added beamlines under the raised pedestrian sidewalk to support a snooper truck for future under-bridge inspections and maintenance. the additional sidewalk load resulted in nonuniform beam reactions requiring careful analysis to determine the proper reinforcing strand and shear stirrup patterns, as well as bearing pad sizes. further, more than 30 separate utility conduits were incorporated into or below the new bridge deck.

because of existing constraints at the bridge location, several design challenges needed to be addressed to accommodate the preferred bridge design. foremost was the limited ability to raise the roadway from its current elevation and the preference to avoid changes to the existing floodwalls.

since the levee system is critical for protecting the downtown region, there was a strong desire to leave the existing floodwalls and levees intact. appropriately, the bridge abutments were designed to penetrate the levee on both river banks while still maintaining flood protection for the city, with the new bridge abutments sized to match the locations of the floodwalls. to minimize excavation and disturbance to the existing floodwalls, large portions of the original massive abutments were left in place. the new prototypical, semi-integral abutments were developed to account for the pile fixity caused by the rigid connection/incorporation into the existing abutments.

due to the limited ability to raise the roadway, the 2022足球世界杯小组赛赛程 engineers worked closely with the u.s. army corps of engineers (usace) and the iowa department of natural resources (dnr) to modify the existing hydraulic model, as well. with the pier footings for the new bridge supported on steel piles extending to bedrock, one less pier was required, increasing the flow area of the river by nearly twenty percent. additionally, the bridge is designed to withstand the hydraulic effects of a 200-year frequency flood event and the intense water pressure acting against the bridge fascia.

expert coordination & collaboration lead to aggressive build schedule

following the demolition of the previous structure at the end of 2016, construction began on a new bridge. the shallow river depth allowed for the use of temporary causeways during construction with a minimal impact on the environment.

all plans were submitted on time, allowing the iowa department of transportation (dot) to let this comprehensive project on schedule. 2022足球世界杯小组赛赛程 ’s estimate of probable cost for the project was $8,612,304.00, with an estimated bridge cost of $7,749,615.00. the actual bid price for the project was $9,060,752.68, with an actual bridge bid cost of $8,379,396.23. the difference in the original cost estimate versus the bid cost is mostly attributed to site difficulties and aesthetic components.

in november of 2017, a mere 12 months after construction began, the bridge opened to one lane of vehicle traffic in each direction with partial pedestrian traffic. the project was substantially completed in spring 2018.

the 2022足球世界杯小组赛赛程 team, along with parent company snyder & associates, made the project possible by collaborating to provide the development of project concept statement, preliminary bridge and roadway plans, hydraulic analysis and documentation, final bridge and roadway design plans, as well as the extensive coordination and development of aesthetic details. also, the design team provided rapid response service for issues that arose during construction. these included addressing unanticipated site conditions, pile driving inquiries, and general construction observation.

award-winning bridge project

the success of the new grand avenue bridge led to a similar design for the locust street bridge location (currently under construction) with plans in the works to let the walnut street bridge in 2022. the innovative aesthetics on the new bridges is viewed as a visual complement to the iowa women of achievement bridge located just upstream from grand avenue and helped to transform the downtown river area for a new generation. 2022足球世界杯小组赛赛程 and their client, the city of des moines, were awarded the 2019 honor award for engineering excellence in the transportation category by the american council of engineering companies of iowa (acec-ia) for the grand avenue bridge project.

client

city of des moines

client type

project type

no team members assigned to this project.

related projects

aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
|||||led bridge lighting|couple walks across a lit up trail bridge at night||night time bridge lighting

trestle-to-trestle bridge over beaver creek reconnects urban loop

the 3.75-mile-long trestle-to-trestle trail connects the inter-urban trail in des moines to the johnston trail system on the north side of interstate 35/80. in the...
fixed up railroad bridge into a trail bridge|summer time light hits the trail bridge and water below|engineering interns learning how to pave the roads|shaded trail bridge|brand new trail bridge with beautiful greenery|black gated fence around a trail route|construction happening on a old railroad bridge

river’s edge trail connects iowa’s heartland

while it's been many years in the making and still has many miles remaining to construct, the river's edge trail is ideally positioned to take advantage of the scenic...
|prairie city welcome signage town square|large green plants and trees on either side of a bike trail|winding trail heads towards a casey's gas station|child bikes a trail through a small town in iowa|small town welcome sign with a trail and road next to it|prairie city town square||

red rock prairie trail provides scenic recreational opportunities

most trail 2022世界杯32强预选赛 in central iowa over the past two decades has centered around making connections. whether connecting small communities or social venues, providing...
a winding trail moves towards the wanatee bridge|wanatee pond project|wanatee pond project|wanatee bridge sits over a stream of water surrounded by native plantings|wanatee pond project|civil engineer lindsay beaman and and environmental scientist nichoel church receive acec award 2022|new steel bridge over wanatee creek|pedestrian bridge in wanatee creek on a fall day|green

wanatee park upgrades improve wetlands & recreational opportunities