flood damage repair & dam reconstruction reduces safety concerns: summit lake dam

flood damage threatens local dam & spillway

flood waters coming over summit lake spillway

summit lake flooding causes significant damages and is in need of repairs

originally built in the late 19th century, summit lake spans 250 acres across the west side of creston, iowa, and is a popular destination area for fishing and recreational use. for many years, the lake was privately owned by the municipal taxpayers water company until the city of creston purchased it in the mid-1930s. almost immediately after purchasing, the city raised the earthfill dam and spillway to almost double the capacity of the reservoir. this arrangement lasted until the historic floods of 2008 caused significant deterioration.

creston water works partnered with snyder & associates to inspect the flood damage and develop a plan for making any needed repairs. because repair work would likely require lowering the water level in the lake, the decision was made to seek out funding assistance and address several other lake issues at the same time. these include making improvements for better recreational access to the lake and stabilizing the erosion-damaged shoreline.

spillway repair & reconstruction to keep dam stable

the snyder & associates team evaluated the dam and spillway and provided an extensive engineering report detailing our findings. after conducting a multitude of tests, it was clear damage was evident and a geotechnical exploration was undertaken to determine the dam’s underlying stability. after the evaluation, it was determined that the earthen section of the dam was in stable condition.

however, the spillway section had developed hollow pockets underneath the concrete. this was allowing lake water to seep beneath the spillway putting the entire dam at risk. since this structure was built nearly 100 years ago, very little design information existed. our design team utilized their years of expertise with dam removal and modification to determine hazard risks and formulate a cost-effective repair plan.

with the scope of the damage known, we designed a modern spillway replacement that would enable the city to maintain the lake in a safe and usable condition. our team began by creating a dam breach analysis report to determine hazard classifications and

large cat machinery breaking up the old spillway

the old spillway section had developed hollow pockets underneath the concrete.

assure downstream safety measures were adequate before the reconstruction was permitted by the iowa department of natural resources (idnr).

throughout the entire design and analysis process, the spillway continued to have a constant stream of water flowing below the concrete, decreasing its ability to withstand large flows of water. working with the city, permitting agencies, and stakeholders, our team developed a plan to substantially drain the lake to allow construction efforts and increase safety measures.

the new concrete spillway section was designed to safely accommodate the expected flow rates established by the breach analysis. this design included a new energy-dissipating outlet structure, stilling basin, and downstream creek stabilization efforts to eliminate erosion on the new structure. the new spillway section was also constructed vertically, as opposed to sloped, to comply with idnr regulations concerning the control of undesirable fish migration into the lake. additionally, our team assisted the creston water works in securing funding from fema and the iowa department of economic development (ided) to help make the needed improvements economically feasible.

 

client

creston water works

client type

project type

darin jacobs, p.e.

darin jacobs, p.e.

water resources work group leader

related projects

exposed siphon at omaha papio creek|drone map of the papio creek in omaha ne|papio creek stream

safeguarding critical infrastructure and water resources: omaha’s “papio” creek

in march 2019, the city of omaha faced a significant threat to its critical infrastructure under west papillion creek (known to locals as papio creek). a disastrous...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
south dakotas capitol building behind dredging equipment on lake|excavator on floating platform|excavator dredging from shoreline|sediment being pulled from lake bed|aerial view of capitol lake in south dakota|dump truck being filled with sediment from of south dakota's capitol lake

sediment buildup necessitates lake dredging project at south dakota capitol complex

one of the prominent features complementing the architectural beauty of the capitol complex in pierre, south dakota, is the 9.5-acre capitol lake. fed by a naturally...
people enjoying 世界杯足球比赛预选赛
 launch at hubbard park|rendering of a canoe launch in wisconsin||||kinds in the water at hubbard park launch|families playing in the river at hubbard park launch

water access upgrade expands amenities at hubbard park: shorewood, wisconsin

hubbard park in the village of shorewood is a local landmark in this wisconsin community. located on a nearly five-acre, 1,400-foot-long strip of land between the...
aerial view of construction at niebuhr mitigation bank|update stream with new protections|aerial view of niebuhr mitigation bank|field of reed canary grass|construction machinery creating low water crossing in a stream|snyder & associates employees walking through mitigation bank|construction machinery digging out dirt for stream

niebuhr stream mitigation bank establishment & environmental benefits

the niebuhr family farm in northeast iowa contains a perennial stream called buck creek, bordered by fields that were historically used for cattle pasture. over time,...
a winding trail moves towards the wanatee bridge|wanatee pond project|wanatee pond project|wanatee bridge sits over a stream of water surrounded by native plantings|wanatee pond project|civil engineer lindsay beaman and and environmental scientist nichoel church receive acec award 2022|new steel bridge over wanatee creek|pedestrian bridge in wanatee creek on a fall day|green

wanatee park upgrades improve wetlands & recreational opportunities

in november 2016, linn county iowa residents passed the water and land legacy bond issue with a 74 percent approval. this popular concept demonstrated that county...
|kwik star convenience stores continued growth||stormwater drain

kwik star convenience stores continued growth

fresh meals and competitively priced grocery items aren’t what most of us expect when we visit a convenience store. kwik star, however, is setting the bar higher with...
bridge over fourmile creeks|butterfly on a flower bush|stream across iowa|fourmile creek iowa||||rainstorm fourmile creek|fourmile creek construction

fourmile creek watershed stabilization and water quality improvements

the fourmile creek watershed in central iowa consists of nearly 80,000 acres of urban and agricultural communities. it’s also home to over 80,000 residents. as this...
|||aerial view of noelridge park||broken down double culvert on narrow stream||

noelridge park stream mitigation improves park’s biological health

restoration & stabilization required to combat stream erosion conveniently located on the north side of cedar rapids, noelridge park is a 100-acre community park...
wetland during the fall season with a small pond|||green fields with small pond under blue sky|monarch butterfly on grass in wetland mitigation site|looking down a tree tube at young tree sprout|shovel holding soils during a wetland site visit|looking down the newly paved cedar valley nature trail|construction of new bridge

cedar valley nature trail benefits from wetland mitigation

environmental services expedite trail restoration the cedar valley nature trail traverses nearly 52 miles from evansdale to hiawatha, crossing the cedar river at...

more than 45 years