fema recertification improves levee & flood protection: council bluffs, iowa

reducing flood risk & ensuring levee performance

levees are an important component of community infrastructure in council bluffs, iowa. located near streams and rivers, these embankments reduce flood risk. the council bluff levee system spans over 28 miles, helping to protect more than 35,500 people and 11,700 buildings. without levees, over 60 percent of council bluffs would be at a higher risk of flooding from the missouri river.

most of council bluffs’ levee system was built 60 years ago, and maintenance is essential to ensure the long-term performance of these manmade structures. currently, fema is 2022世界杯32强预选赛 to assess flood protection in council bluffs in 2023. without adequate maintenance and rehabilitation of the council bluffs levee system, significant portions of the city would likely be classified as a flood plain during the fema assessment. if that were to happen, property mortgages would require costly flood insurance. additionally, according to local insurance agents, the cost of homeowner’s insurance could rise from $1,200 – $2,000 annually.

to protect residents from flooding and the potential for higher insurance costs, council bluffs initiated 10 projects to recertify its entire levee system before the 2023 fema assessment.

project improvements required for fema accreditation

snyder & associates was selected by the city to provide design, survey, and construction phase services for the levee underseepage control improvement (geotechnical mr_2) project, which is one segment of a much larger project. the focus of geotechnical mr_2 is addressing deficiencies with existing seepage control measures and providing improvements that are needed for fema accreditation of embankment and foundation stability.

modifications necessary for accreditation include the:

  • abandonment of existing relief wells
  • development, pump testing, and sterilization of relief wells
  • installation of a buried pipeline system to collect the flow from relief wells
  • reconstruction of borehole and casing grout
  • construction of a groundwater sump structure to collect and allow for pumping of flow from relief wells
  • reconstruction of the existing access drive

peer review of preliminary design & optimization of seepage control measures

we began by collaborating with the geotechnical project team to conduct a peer review of the preliminary design and optimization of seepage control measures, which were previously prepared by another consultant. our team’s review included the:

  • project background and related scopes
  • subsurface investigation and conditions
  • material permeability and shear strength parameters
  • analyses and results of seepage and slope stability for the levee for a 100-year flood event
  • recommendations provided by others

field pump testing of five of the existing relief wells was conducted to provide confirmation of the permeability values used in the seepage calculations. additional soil borings and laboratory testing was conducted, as well as slope stability and seepage analysis in order to validate findings of the preliminary investigation.

evaluating project alternatives

evaluations of two potential alternatives were also conducted to determine the scope for project design.

option one – replacement of the existing wells using a pervious toe trench system with collector pipe, pumping stations, and rock toe.

option two – retrofitting the existing well system with a discharge pipe system to lower the head at each well.

the relief well system retrofit was determined to be more cost-effective than a pervious toe trench because it utilizes the existing wells and requires less construction to comply with a limited existing right-of-way.

helping the community achieve levee certification

incorporating findings from the preliminary investigation, we conducted a topographic survey, engineering design, and preparation of plans, along with specifications and special provisions for the relief well pipe collection system. its alignment is located at the toe of the levee directly below the existing surface water drainage ditch in a corridor about 20 feet wide with approximately 2.5 feet of elevation change over 800 linear feet, requiring a highly-precise grading for the pipe and restored drainageway. 2022足球世界杯小组赛赛程 , a subsidiary of snyder & associates, partnered to provide structural design and specifications for the groundwater sump structure.

significant collaboration was required between snyder, shuck, council bluffs 世界杯足球比赛预选赛 works and the geotechnical team to produce final project plans in conjunction with a section 408 alteration request submittal to the u.s. army corps of engineers (usace) for review, including iterations of minor resubmittals, information requests, and design modifications that ultimately led to approval in tandem with bid phase services for construction. a partnership was also necessary with another consultant representing the city for review and submittal of fema certification. project completion was crucial to avoid construction activities during the high water season as well as frozen conditions in fall/winter.

overcoming levee certification challenges

construction in council bluffs for levee reconstruction

snyder & associates provided construction administration services throughout the entire construction process.

snyder & associates provided construction administration services throughout the entire construction process.snyder provided construction phase services in administration, observation, staking, testing coordination, as well as land survey for the contractor per the requirements of the emergency action plan. challenges encountered during construction included modifications to the well abandonment procedures due to destabilized well screens and the potential to create voids, and failed testing and development of some of the existing relief wells. underperformance in pumping rates and excessive sand production from the aquifer resulted in the replacement of four relief wells. snyder interfaced with the usace to obtain approval of two addenda to the 408 request. other unforeseen circumstances addressed during construction included concrete columns in the borehole of the existing relief wells, layers of trash/debris in the collection pipe trench excavation, and excessive sand and obstructions in the relief wells.

levee construction report for fema certification

after construction, we compiled a comprehensive levee construction report detailing all activities conducted, project timelines/milestones, summary and analysis of quality assurance and quality control testing, work change directives during construction, and daily observation reports through substantial completion. the report was submitted to the usace for final acceptance as well as to the partnering consultant for inclusion in the overall fema submittal for certification documentation that also included an operations and maintenance addendum for the newly constructed facilities.

successful levee system improvements

in march 2019, the collection pipe system was observed functioning for the first time during the high water event with the sump structure filling with groundwater as intended, which city operations subsequently pumped back over the levee. collective performance of the overall council bluffs levee system has been recognized as being in better condition, than during the flooding of 2011 and no further deficiencies have been found on the geotechnical mr_2 segment.

client

city of council bluffs, ia

client type

project type

michael g. geier, pls

michael g. geier, pls

council bluffs business unit leader

related projects

||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
newly poured concrete roadway|construction workers pouring concrete for stormwater drainage|cement truck pours wet concrete onto newly established roadway|construction workers in large hole for sanitary sewer|crews lay wet cement

major street reconstruction project benefits waverly community

the 4th street sw corridor is a busy north/south thoroughfare in the heart of the waverly community. this busy stretch provides access to the bustling business district...
project street after rainfall with no flooding|street signs showing 47th and holcomb location|storm drains and wet pavement with no flooding|civil engineer wes farrand and city representative receive acec award 2022|street signs at intersection of 47th and holcomb|map of closes creek construction projects

right-sizing stormwater infrastructure in flood-prone des moines neighborhood

homeowners near the intersection of 47th street and holcomb avenue in des moines are no strangers to repeated localized flooding. this issue has plagued the beaverdale...

more than 45 years

serving clients around the country

db+