etc brightens their future with award-winning expansion project

wisconsin firm ties expansion to surrounding environment

as a global leader in the manufacture of lighting and rigging technology, etc (electronic theatre controls) has called middleton, wisconsin home since 1976. recently, this growing organization needed to create more room for their research and development department by adding to their existing 328,000 square feet of office, manufacturing, and warehouse space. snyder & associates partnered with the project’s architect and general contractor to design several facets of the new site.

parking lot site presented design challenges

the new addition, located on the north end of the existing building, consists of a 74,500 square foot, multistory structure with an expansive open atrium. the first challenge for the design team was ensuring that the company’s operations could continue throughout the entirety of the project. to make this possible, our team designed a new, 300-stall parking lot for employees so the new building addition could be constructed on an existing parking lot location.

native plants outside of etc building

the newly expanded etc facility creates a wonderful environment for their employees and the surrounding community.

the parking lot site presented additional challenges stemming from poor soil conditions, a high groundwater table, and the proximity to wetlands and pheasant branch creek. extensive permitting coordination at the city and state level was necessary to adhere to the rules and regulations surrounding construction near waters of the u.s. (wotus).

our designers also minimized on-site water and sanitary sewer needs through careful attention to grading design and elevation. additionally, these grading and erosion control efforts were needed to protect the sensitive environmental areas located just north of the site. the creation of several wet ponds and infiltration basins satisfied the stormwater management requirements for the location.

site design that fosters creativity 

the unique and artistic design of the etc building expansion was designed to foster a creative spirit among its employees and expand the success of the company. the contributions made by the snyder & associates team helped to accomplish the fundamental goal of building a facility that blends with its natural environment and reflects the personality of the organization that operates inside.

client

electronic theatre controls

client type

project type

no team members assigned to this project.

related projects

||||

creating a safer, smarter space for animal services in des moines

at the corner of se 14th and harriett streets in des moines, a forward-thinking facility now stands as a beacon of care for animals and the community. the new des...
||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
newly poured concrete roadway|construction workers pouring concrete for stormwater drainage|cement truck pours wet concrete onto newly established roadway|construction workers in large hole for sanitary sewer|crews lay wet cement

major street reconstruction project benefits waverly community

the 4th street sw corridor is a busy north/south thoroughfare in the heart of the waverly community. this busy stretch provides access to the bustling business district...

more than 45 years

serving clients around the country

db+