2727 sw snyder blvd, ankeny, ia 50023

1 (888) 964-2020



navigation

downtown revitalization plan starts with market analysis & traffic feasibility study: bettendorf

changing strategies for shifting consumer demands

during the first half of the 20th century, the bettendorf riverfront had a thriving downtown retail district that served as the destination shopping area for citizens of the community. however, in the 1960s and into the 1980s, large shopping centers and malls started opening on the north side of town, as well as along the easily-accessible kimberly road corridor in davenport. these new businesses generated a shift in shopping preference, leading to a steady decline in downtown business district activity. the farm crisis in the 1980s led to an appreciable decline in the area’s population, which in turn impaired the prosperity of the downtown region even further.

riverboat floating along river shoreline

the legalization of riverboat gambling in the early 90s brought renewed interest to the waterfront area.

however, a renewed interest in the downtown region started taking shape in the early 1990s with the introduction of riverboat gambling on the bettendorf waterfront. spurred by this development, more entertainment venues and restaurants began relocating to the downtown area. unfortunately, the layout of the downtown street network (between 15th street and 26th street) wasn’t conducive for the revitalization effort to meet its full potential. the city of bettendorf partnered with snyder & associates to create an improved transportation plan that efficiently facilitates through traffic while also assigning local traffic to a dedicated roadway serving the downtown area. another focus of the partnership was to further support the recent plans to replace the interstate 74 mississippi river bridge adjacent to the study area.

market analysis provides road map for downtown revitalization

before beginning any corridor 2022世界杯32强预选赛 work, snyder & associates oversaw the administration of a thorough market analysis. this analysis provided a fact-based look at the existing business conditions in the greater quad cities area. it also produced insight into the types of businesses that would be needed in downtown bettendorf to create the proper balance for becoming a shopping and entertainment destination with a unique character. part of this insight was identifying redevelopment opportunities for a downtown area containing aging infrastructure and buildings.

it also identified five distinct land-use areas that would be needed to harmonize the downtown business environment. these districts would be the drivers for the recommended roadway configurations in the study corridors and include an:

  • entertainment district
  • residential district
  • mixed-use district
  • office district
  • special district (open-air market, museum, business incubation space, etc.)

downtown traffic feasibility study calls for conversion of one-way couplet to help meet goals

with the market analysis complete, a traffic feasibility study was initiated. the feasibility study included the review and evaluation of impacts associated with converting the us highway 67 one-way couplet (locally known as grant and state streets), to two-way roadways through the downtown area. the goal was to separate the regional traffic moving along grant street from the destination traffic that would use state street to the south.

map and legend describing future improvement plans

the traffic analysis portion of the study included an evaluation to determine the redistribution of traffic if the corridors were separated. the study concluded that converting state street into a low-speed, two-way roadway with on-street parking would provide better access to the businesses located between 15th street and 26th street, while at the same time creating a more pedestrian-friendly environment. grant street to the north would continue to carry the heavier, us 67 traffic as a two-way, highway thoroughfare. coordination with the iowa dot would also be necessary regarding the potential transfer of jurisdiction of state street to the city.

another goal of the study was to find a way to provide better connectivity from downtown to the riverfront. currently, the canadian pacific railroad tracks run parallel to state street to the south and divide the two districts. a single overpass at 17th street is the only grade-separated crossing that provides uninterrupted access to venues south of the tracks, including the casino, regional trail system, and the riverfront. locating another access to the riverfront would link a network of entertainment destinations and services to help attract visitors and residents.

an undertaking of this scale requires an extensive amount of coordination between local and state agencies, area business owners, and the 世界杯足球比赛预选赛 at large. the snyder & associates team was able to bring these various groups to the table to solicit input and ideas through numerous 世界杯足球比赛预选赛 meetings. they also observed, documented, and evaluated existing conditions, along with the traffic operations throughout the downtown.

multiple roadway realignment layouts & streetscape options offered to create a sense of place

with the project goals established, numerous roadway alternatives were developed to separate us 67 into two, independent roads. for grant street, which is proposed to maintain the us 67 designation, three options were created for realignment. each option looked to maximize existing right-of-way and create a safe corridor where access control was defined through the use of medians. these options also took into consideration the existence of dilapidated buildings and older infrastructure in the corridor area that was slated for potential redevelopment.

the state street options looked at reconfiguring both ends of the corridor where they connect with grant street. the goal of these changes was to support siphoning local traffic from grant street in order to better facilitate pedestrian and vehicle mobility in the downtown business district. different intersection treatments, including mini-roundabouts and stop-controlled intersections, were evaluated for the state street corridor. three-lane and two-lane options with on-street parking and multi-modal accommodations were also considered for the corridor. several alternatives were developed to delineate the five separate land-use districts throughout the entire downtown area.

street lightpole with purple welcome banner

streetscape enhancements along the corridor create a sense of place.

gateway and streetscape enhancements for both roadways were incorporated into the concept designs. these included unique signage or architectural features to mark the transition to the newly created downtown corridor. other treatment options included seating and benches, as well as decorative lighting and bicycle racks. the parking study indicated an additional need for on-street and off-street parking. this finding led to a redevelopment concept for future revitalization efforts.

finally, an overpass on 23rd street was suggested as a means to provide another grade-separated access to the riverfront. this overpass would connect with a new access road leading to the riverfront casino and hotel area. it would also open up the possibility of land redevelopment to the east of the casino.

funding sources pinpointed for long-term project success

as a result of the study, several short and long-term strategies were identified to help funding efforts on this project. among them was the recommendation to implement a self-supported municipal improvement district (ssmid). ssmid funds would be used for the maintenance of 世界杯足球比赛预选赛 spaces, marketing and promotion of the downtown district, and capital improvements. additionally, it was suggested that application processes should begin for state and local funding sources. these programs generally require well-developed 2022世界杯32强预选赛 initiatives and matching funds. the establishment of these 2022世界杯32强预选赛 documents and match dollars as soon as possible assists the city in positioning bettendorf into upcoming funding streams, which may take years to mature.

client

city of bettendorf

client type

project type

wade greiman, p.e.

wade greiman, p.e.

transportation business unit leader

related projects

overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
this rendering shows several design ideas that would allow food trucks to inhabit the space for community events|overhead deception showing numerous amenities the design team proposed for the merrill alley section of this project|plans showing the upgrades and improvements to transform 3 alley ways in fort dodge

fort dodge alleyways three-block master plan enhances community space

in the heart of fort dodge, tucked away behind the buildings lining central avenue between ninth and 12th streets, lies the canvas for an ambitious project — the fort...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
newly poured concrete roadway|construction workers pouring concrete for stormwater drainage|cement truck pours wet concrete onto newly established roadway|construction workers in large hole for sanitary sewer|crews lay wet cement

major street reconstruction project benefits waverly community

the 4th street sw corridor is a busy north/south thoroughfare in the heart of the waverly community. this busy stretch provides access to the bustling business district...
upgraded park landscaping and new amenities|clay paver pathway|park landscape upgrades|

peter melendy park upgrades enhance cedar falls riverfront

while the main street parkade renovations in recent years have been taking center stage in cedar falls, the upgrades to nearby peter melendy park and the surrounding...

more than 45 years

serving clients around the country

db+