design of unit train service addition to industrial site: global agricultural products corporation

plans to accommodate unit train shipping service to improve transport

the project site for a global agricultural products corporation was served by the union pacific railroad (up) through manifest train service but didn’t possess the rail assets needed to accommodate unit trains. to keep trains running proficiently, many industrial corporations consider unit train shipping service because it’s the most efficient form of land transportation. unit trains can be between 65 cars in length and 200 cars (or more), varying on the location and railroad. all cars in the freight train carry the same type of commodity, from origin to destination. also important to note, the locomotives pulling the train will typically stay connected throughout the entire journey promoting time-saving.

view of railroad train and tracks

the client required space for 110 cars with 48 hour turnaround time on equipment and a drive-in, drive-out design.

the up required space for 110 cars with 48 hour turnaround time on equipment and a drive-in, drive-out design. unfortunately, the existing yard and loading equipment were unable to accommodate these requirements. snyder & associates served as the lead designer and initially provided assistance to verify the overall feasibility of accommodating unit train service. after determining that required improvements were possible and up could provide service, the design of upgrades was initiated.

the owner operates an established, busy yard facility that was required to remain in service 24 hours a day, 365 days a year during construction. working with the owner, designs were developed to enable continued operation and accommodation of the addition of unit trains. to handle unit trains, extensive changes in standard facility operating procedures were required. we assisted the owner to develop operating sequences that drove design parameters. the design included extensive grading and construction of approximately 14,000 feet of additional track, turnouts, grade crossings, and connections to the existing yard track. numerous utilities were present in the construction area. coordination of utility relocation and accommodation was conducted throughout the project design.

space was limited, so creative site design was critical. a new track was designed to run parallel to the existing up corridor with geometry designed to accommodate large road locomotives and switching equipment. the owner hasn’t released the project for construction yet.

client

confidential

client type

project type

darin jacobs, p.e.

darin jacobs, p.e.

water resources work group leader

related projects

||||

creating a safer, smarter space for animal services in des moines

at the corner of se 14th and harriett streets in des moines, a forward-thinking facility now stands as a beacon of care for animals and the community. the new des...
||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
thick metal signage with large text|bicyclist ride past the council bluffs fire station|before construction on first ave|bicyclist happily wave at on down the bike trail|first ave trail in council bluffs|asphalt trail along high school athletic facilities|council bluffs bike trail

first avenue trail creates council bluffs connection

formally adopted by the city of council bluffs in 2015, the west broadway corridor plan was developed to guide the transformation of this busy stretch of roadways into...
houses on a neighborhood street taken from an angle shot with vehicles in the driveways|brand new housing on walnut grove in council bluffs iowa|old school surrounded by green grass and native plantings|flat grass land with trees primed for housing construction to begin|walnut grove school prior to demolition|two story square blue house with stone work and green lawn

walnut grove subdivision provides new housing for council bluffs neighborhood

the walnut grove elementary school dutifully served the north side of council bluffs for nearly nine decades. after a feasibility study conducted in the early 2010s...
|kwik star convenience stores continued growth||stormwater drain

kwik star convenience stores continued growth

fresh meals and competitively priced grocery items aren’t what most of us expect when we visit a convenience store. kwik star, however, is setting the bar higher with...
iowa state building|back of a glass building on college campus|front of glass building along sidewalk|glass building along college campus|water tower on iowa state's campus|parking area cement work|bike racks at iowa state university

glass-walled student innovation center impresses & inspires: iowa state university campus

when the idea was first proposed for a student experimentation center on the iowa state university campus, leaders envisioned a flexible, open space that would elevate...
photo of a loves truck stop at night on a rainy day|photo of a loves truck stop at night on a sunny day|gas station utilities being constructed.|construction workers paving cement at a loves truck stop.

love’s travel stops & country stores continued expansion

snyder & associates has been aiding love’s with their expansion efforts by providing our full contingent of 2022世界杯32强预选赛 , engineering, and design services.

community center at recently developed pleasant view apartments in madison

tuscany on pleasant view apartments complement prairie point housing options

west side madison neighborhood benefits from upscale, multi-family development attic angel prairie point is a 54-acre community designed for seniors-only, independent...
fuel prices are displayed on sign as vehicles enter and exit recently complete kwik trip convenience store|cars entering and exiting recently completed gas station|bio-retention basin enhances stormwater mitigation satisfy local requirements|bio-retention basin enhances stormwater mitigation satisfy local requirements for recently completed kwik trip|vehicle parked next to fuel pump in front of a recently complete kwik trip in deforest wisconsin|vehicles refueling at kwik trip convenience store

kwik trip store location requires extensive land development

kwik trip turned to the civil engineers with snyder & associates to develop the site plans for their store along west north street in the community of...
concrete and glass design for iowa 世界杯足球比赛预选赛
 works facility|firetruck next to fire training tower|世界杯足球比赛预选赛
 works vehicles lined up inside warehouse|loading docks on the back of the iowa 世界杯足球比赛预选赛
 works facility building||black and white rendering highlighting project area in color.

modern facility consolidates iowa city 世界杯足球比赛预选赛 works municipal operations

several 世界杯足球比赛预选赛 works facilities brought under one roof for years, iowa city 世界杯足球比赛预选赛 works (icpw) utilized several sites to house different departments and equipment....

more than 45 years

serving clients around the country

db+