design & implementation of park master plan creates terry trueblood recreation area

former quarry becomes a recreational amenity

located along the iowa river on the southern edge of iowa city, the terry trueblood recreation area is iowa city’s largest park. this 207-acre site was once farmland used for growing alfalfa, soybeans, and corn before it became a quarry in the late 1970s. the quarrying process, which extracted sand and gravel for local construction projects, created sand lake. once all viable material had been extracted and the area was quarried down to blue clay, iowa city bought the land in 2005 to develop as a 世界杯足球比赛预选赛 park.

with the area’s unique access to water, city leaders envisioned the park serving as a year-round, day-use park for visitors and locals alike. they brought snyder & associates into the fold to conduct 世界杯足球比赛预选赛 meetings to gain project input and prepare the design for the park’s master plan. additionally, funding sources were identified and applied for, with grants being secured through vision iowa and resource enhancement and protection (reap).

multi-phase construction schedule makes park plan reality

master plan of park

overhead artist’s rendering of the terry trueblood recreation area.

the snyder & associates design team developed a park plan that included amenities for bird watching and fishing, a multi-use trail network, a natural play area, and numerous picnic shelters with a modern lodge facility available for 世界杯足球比赛预选赛 use. a marina provides a rental station for paddleboards, kayaks, canoes, as well as a concession stand.

implementing the park master plan required three separate phases of design and construction. during the first phase, a two-mile trail was constructed around the lake. this trail was then opened for 世界杯足球比赛预选赛 use during the remaining construction phases. the second phase included the marina building which has concessions, restrooms, and the rental stand. improvements also included the shelter area, parking for vehicles and boat trailers, and a boat ramp.

by far the most aggressive construction efforts took place during phase three of the project. this phase included the construction of the lodge, an outdoor patio and 世界杯足球比赛预选赛 overlook, numerous shelter areas, the natural play area, fishing jetties, canoe launch, more parking space, and landscaping efforts, which included a variety of native prairie plantings to help restore the natural state of the area.

anticipated construction challenges test design team

construction crew installing pavement

crews pour concrete for one of the several pathways around the terry trueblood recreation area.

a primary challenge faced by the design team was tied to the sand foundation surrounding the quarry site. to create a stable foundation for the lodge and the patio space, a reinforced pier system was required. the sandy soil was also cause for concern for the landscape team. however, through collaboration with a seed supplier, custom seed mixes for sand prairie and emergent aquatics were created that would flourish in the soil’s sand-based structure.

another obstacle the team had to overcome was the discovery of miscellaneous debris that had been buried around the grounds over time. this debris was found after construction had begun. our team was able to make the necessary revisions to the plans without losing substantial time in the schedule.

perhaps the recreation area’s best feature is the accessibility that it provides to all citizens. from the paved trail around the lake and all the picnic shelters to play areas, restrooms, concessions, and event lodge were all constructed to meet ada standards. designated parking spaces provided in the lot have an accessible route from the parking area to all amenities.

the recreation area was named after terry trueblood, the former director of iowa city’s parks and recreation department who led the efforts to garner project support and funding. mr. trueblood’s drive and determination, coupled with the snyder & associates teams’ practical, yet creative design acumen has developed an outdoor oasis that will be enjoyed for many generations to come.

client

city of iowa city

client type

project type

clay schneckloth, pla

clay schneckloth, pla

landscape architect

related projects

a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
||||||indian creek trail connection ribbon cutting

indian creek trail connection unites key marion neighborhoods

having doubled in population over the past three decades, the cedar rapid’s suburb of marion has been the dual beneficiary of a rapidly expanding metro area and the...
|prairie city welcome signage town square|large green plants and trees on either side of a bike trail|winding trail heads towards a casey's gas station|child bikes a trail through a small town in iowa|small town welcome sign with a trail and road next to it|prairie city town square||

red rock prairie trail provides scenic recreational opportunities

most trail 2022世界杯32强预选赛 in central iowa over the past two decades has centered around making connections. whether connecting small communities or social venues, providing...
children of pella enjoying playing on the kiwanis playground|kids playing on the ada playground equipment at pella's kiwanis park|the community enjoying playing at the inclusive kiwanis playground|kiwanis playground turf surfacing|kiwanis slide and turf ground|two adults read a playground sign of the list of major donors at kiwanis park|ada playground equipment at kiwanis park in pella iowa|kiwanis park bathroom and drinking fountain|construction and concrete progress at the kiwanis park|phasing plan for kiwanis park improvements

inclusive playground & park improvements for pella’s kiwanis park

meaning "miracle play" in dutch, "wonder spelen" is a pella-based nonprofit organization formed to raise money to create an all-inclusive park for children with...
fixed up railroad bridge into a trail bridge|summer time light hits the trail bridge and water below|engineering interns learning how to pave the roads|shaded trail bridge|brand new trail bridge with beautiful greenery|black gated fence around a trail route|construction happening on a old railroad bridge

river’s edge trail connects iowa’s heartland

while it's been many years in the making and still has many miles remaining to construct, the river's edge trail is ideally positioned to take advantage of the scenic...
bike trail winding through the green forest|trail with black fencing one either side|freshly paved trail goes uphill towards a tree line|incomplete trail bridge|map of the rolling prairie trail system|paving underway in the middle of a storm|trail water drainage

rolling prairie trail provides rural link across iowa’s scenic landscape

when rail transportation in iowa peaked in the early 1900s, the state was home to more than 10,500 miles of track. as automobiles became the preferred mode of...
bridge on the railroad highway trail|pre-construction of the railroad highway trail|bridge on the railroad highway trail|trail pavement of the railroad highway trail|map of the railroad highway trail

railroad highway trail connects western iowa communities

now standing at more than 50% complete, the dream of a completely off-roadway, multi-use trail network spanning the entire country keeps taking steps to becoming...
high trestle trail pedestrian bridge at night|oralabor road trail bridge|many citizens gathered for a bike ride|oralabor road trail bridge under construction|the snyder and associates transportation team for oralabor road trail bridge|many bicyclists riding along the high trestle trail bridge|family smiling as they ride across a trail bridge on bikes||||rich voelker

pedestrian tunnel & bridge showcase trail extension in ankeny — high trestle trail

shortly after the high trestle trail bridge over the des moines river was completed in 2011, the focus quickly shifted to continuing the trail south through the ankeny...