cost-saving method used for street rehabilitation project: norwalk

infrastructure study identifies poor street conditions

lakewood drive in norwalk, iowa is a residential street running along the southern edge of lake colechester in the lakewood village neighborhood. just shy of one mile in length, the street services almost 90 single-family residences, as well as provides access to recreational areas along the lake’s shoreline.

performed in 2013, the norwalk community infrastructure study (ncis) examined the city’s water system, storm and sanitary sewers, and street conditions in the lakewood village area. it identified the existing pavement on lakewood drive as being near the end of its useful life. because of the large number of residences along the corridor, the city preferred that any street rehabilitation work be confined to the existing right-of-way. snyder & associates was retained to determine the best method for upgrading the roadway.

determining the scope of roadway improvements

as part of the design services provided by our firm, it was discovered that the storm sewer system that serves the area was substantially undersized. the undersized system had led to numerous cases of localized flooding during periods of heavy rain. a complete upgrade of the existing storm sewer system was necessary to minimize the recurring flooding issues.

a detailed pavement analysis was completed on the existing roadway. this included reviewing the type of traffic using the roadway (nearly no trucks), obtaining pavement cores and performing an analysis of the subbase and subgrade. the results determined the base materials were stable and in quite a good condition. with that in mind, it was determined that a complete reconstruction of the roadway would not be required, but rather a “crack and seat” method, followed by a hot mix asphalt (hma) overlay could be used.

“crack & seat” roadway rehabilitation method limits disruptions & reduces expenses

the crack and seat method is designed to reduce reflective cracking in an hma overlay by minimizing the movements in the underlying concrete. the crack and seat process involves cracking the existing pavement into pieces small enough to reduce horizontal movement, but large enough to maintain structural integrity. this is most commonly performed using a gravity, guillotine-type breaker. after seating the pieces into the subgrade using a weighted roller, hma is then used to overlay the roadway.

wood framing before sidewalk construction

layout and framing of sidewalk prior to construction

there are two primary benefits to using the crack, seat, and overlay process. first, since the existing pavement doesn’t need to be removed, the roadway can be kept open to local traffic during most of the process with minimal disruption to residents. the storm sewer, curb, gutter, and sidewalk replacement work only requires minimal periodic closures to individual residential driveways. our team provided constant feedback to the city staff to help keep the residents along the corridor updated on the progress. second, compared to a full street pavement tear out and replacement, the crack, seat, and overlay method provides a substantial reduction in the project’s overall cost.

challenging staging for street rehabilitation & utility coordination

because of the scale of the project and the large number of residences impacted, the work was divided into two separate phases, starting at the west end of lakewood drive and working east. during the first construction phase, work was completed between wakonda drive and old orchard drive. in the second year of the project, the remaining section from old orchard drive out to iowa highway 28 was wrapped up. breaking the construction into two phases allowed for better coordination with the multiple utilities in the project zone, as well as maintaining access to the lake amenities along the corridor.

the lakewood drive rehabilitation was the second of several planned corridor projects in the lakewood village neighborhood. because of the success of the crack, seat, and overlay process used on this project, it’s also being considered for several other street rehabilitation projects in the area.

client

city of norwalk

client type

project type

wade greiman, p.e.

wade greiman, p.e.

transportation business unit leader

related projects

8th avenue reconstruction & mount vernon road rehabilitation – cedar rapids, iowa

grand place award in the transportation category for the 2026 engineering excellence awards competition for acec iowa the 8th avenue reconstruction & mount vernon...

3rd street northeast reconstruction – belmond, iowa

modernizing infrastructure and enhancing connectivity in belmond to address aging infrastructure and improve overall street conditions, the city of belmond partnered...

hickman road & se legacy pointe / nw 161st street intersection improvements

to support long-term traffic efficiency and corridor consistency along hickman road, the cities of clive and waukee partnered on a joint project to reconstruct and...
||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

2025 engineering excellence award in the transportation category awarded by the american council of engineering companies (acec) a 2022世界杯32强预选赛 initiative performed in the...
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

2024 engineering excellence awards, honor award winner in the transportation category awarded by the american council of engineering companies (acec) of iowa in the...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...

more than 45 years

serving clients around the country

db+