corridor traffic study recommends complete street solutions for cedar falls

reinventing roadway corridors to meet future demands

once a primary north/south iowa highway through cedar falls, the main street corridor no longer experiences the traffic demand that it did before the construction of the relocated iowa 58 freeway in the early 1990s. this four-lane mostly undivided roadway does, however, still serve local traffic to residential and business areas in the downtown and to other adjacent land uses within the corridor. as the pavement along main street had reached the end of its useful life, in addition to other underground utility maintenance needs, the city of cedar falls requested snyder & associates perform a traffic study on the corridor from 6th street to university avenue to determine the appropriate design alternatives for the corridor moving into the future.

with funding to reconstruct the roadway already included in the capital improvement budget, the primary goal of this study was to identify potential design alternatives for safety and traffic operation improvements along the main street corridor with enhanced pedestrian and bicycle mobility. additionally, it entailed the creation of a corridor plan incorporating those improvements while considering all modes of transportation and is fully consistent with current and future land uses. finally, this analysis allowed our engineers to provide recommendations for the most efficient configuration of the reconstructed roadway that was congruent with the complete streets policy previously adopted by the city.

corridor data analysis guides alternatives

the goals of the corridor study were accomplished through the examination of multiple information channels, including; traffic volume history, crash history, pedestrian and bicycle needs, the collection of 世界杯足球比赛预选赛 input, and forecasted traffic demand. the analysis of this data allowed our traffic engineers to evaluate and develop intersection and corridor alternatives. these alternatives were then evaluated based on their ability to meet complete streets objectives, the minimization of right-of-way impacts, and creating a measurable improvement to safety and traffic efficiency along the corridor.

alternative lane configurations for safer travel

after evaluating the data, several alternatives for lane configurations through the corridor were developed that not only create a safe and efficient roadway but also considered accommodations for all modes of travel. this included the possibility of on-street bike lanes to address the recommendations of the cedar falls bicycle and pedestrian advisory committee. the other primary consideration was to minimize any right-of-way needs and, if possible, work within the same (or even narrower) back-of-curb width that already exists in the corridor. three alternatives were considered after the evaluation:

  • alternative 1: maintain the existing four-lane cross-section. rebuild the roadway as is
  • alternative 2: switch to a three-lane cross-section. rebuild the roadway with a nearly identical width, but incorporate one through lane in each direction with a center two-way left-turn lane (twltl) and bike lanes on each side
  • alternative 3: boulevard cross-section. rebuild the roadway with alternative 2 improvements from seerley boulevard to 18th street and then transition to a two-lane section with bike lanes from 17th street to 8th street, including a central grass median with breaks at 世界杯足球比赛预选赛 street intersections

the use of roundabouts was also reviewed as an option instead of traffic signals at three key intersections in the main street study area: seerley boulevard, 18th street, and 12th street. a bridge located near the seerley boulevard intersection eliminated the possibility of a single-lane roundabout at that location. however, it was determined the 12th and/or 18th street intersections would operate well as single-lane roundabouts versus the current traffic signals. it would, however, require right-of-way acquisition in each quadrant, as well as utility considerations and unique fire department traffic flow demands.

世界杯足球比赛预选赛 input & feedback meetings keep residents informed & drive decisions

group of people gathered around a map

two 世界杯足球比赛预选赛 meetings were conducted during the study period. the first meeting was to seek 世界杯足球比赛预选赛 input on issues and concerns within the corridor area. this open house-style meeting allowed those attending the opportunity to visit with the city staff and our engineering team and learn valuable information about the existing conditions along the corridor. it also provided the environment for our team to listen to 世界杯足球比赛预选赛 needs and concerns. a second meeting incorporated a formal presentation about the traffic study analysis and findings, including displays of the proposed improvement alternatives for the corridor and the specific intersection treatment options. further listening sessions and discussion periods were held, as well.

cost-effective recommendations

at the conclusion of the process, the snyder & associates team recommended the reconstruction of the main street corridor between seerley boulevard and 6th street as a three-lane facility. this solution would provide one through lane in each direction, develop a center two-way left-turn lane (protected lefts at signalized intersections), and consider roundabouts to replace the traffic signals at 12th and 18th streets.

our recommendation also included bike lanes within the same corridor and the construction of sidewalks on the east portion of the corridor between seerley boulevard and 18th street. cost comparisons between the alternatives range from $4.4m to rebuild the existing roadway to $5.2m to rebuild a three-lane option with a 12th street roundabout.

however, these are only initial construction cost opinions and do not factor in additional utility upgrades, improved safety benefits, and travel delay improvements that will be realized over time with the three-lane alternative and roundabout additions. while upfront costs will be higher than traditional signalized intersections, our firm’s study determined roundabout conversions will result in considerable traffic safety and delay cost savings over the lifespan of the project, as well as improved efficiency and traffic flow.

client

city of cedar falls

client type

project type

mark perington, p.e., ptoe

mark perington, p.e., ptoe

traffic work group leader

related projects

overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
this rendering shows several design ideas that would allow food trucks to inhabit the space for community events|overhead deception showing numerous amenities the design team proposed for the merrill alley section of this project|plans showing the upgrades and improvements to transform 3 alley ways in fort dodge

fort dodge alleyways three-block master plan enhances community space

in the heart of fort dodge, tucked away behind the buildings lining central avenue between ninth and 12th streets, lies the canvas for an ambitious project — the fort...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
newly poured concrete roadway|construction workers pouring concrete for stormwater drainage|cement truck pours wet concrete onto newly established roadway|construction workers in large hole for sanitary sewer|crews lay wet cement

major street reconstruction project benefits waverly community

the 4th street sw corridor is a busy north/south thoroughfare in the heart of the waverly community. this busy stretch provides access to the bustling business district...
upgraded park landscaping and new amenities|clay paver pathway|park landscape upgrades|

peter melendy park upgrades enhance cedar falls riverfront