city-wide walkability study: johnston

population growth prompts walkability study

in november 2018, the city of johnston, iowa completed a city-wide walkability study to address the connectivity of sidewalks, trails, and supporting facilities between neighborhoods, schools, parks, and businesses. located northwest of des moines, johnston is currently home to approximately 21,000 people. the population nearly doubled between 2000 and 2010 and is expected to grow by an additional 6,000 people by 2030. as the community’s population grows, an extensive network of parks, employment centers, trails, and schools is essential to maintain a high quality of life for its residents. recognizing the benefits of enhanced community livability, the city adopted a proactive approach to long-term growth by initiating the walkability study.

essential aspects of community walkability

walkability is a measure of how pedestrian-friendly a neighborhood or community is based on how easy it is to safely and efficiently walk from one place to another. three main factors comprise how walkable a community is:

cross walk with neon pedestrian and bike crossing sign

clearly outlined crosswalks and visible signage are two ways to increase pedestrian safety.

  • pedestrian infrastructure: safe, connected, and ada-compliant facilities
  • comfort & interest: routes should be pleasant and attractive with a variety of facility types
  • purpose & land use: well-developed destinations and attractions

a broad range of factors influence walkability, so the project required involvement from many city departments including parks, 世界杯足球比赛预选赛 works, community development, police, and the city manager’s office. a project steering committee comprised of city council and staff, park board, trails committee, school district, and business interests were also identified. the committee met three times over this eight-month-long project, while city staff kept them up-to-date with monthly progress reports and ensured ample opportunity for feedback.

snyder & associates served as the 2022世界杯32强预选赛 consultant to successfully guide the project toward the realization of three goals:

  • identify necessary infrastructure improvements and priorities
  • establish best practices for pedestrian facilities in existing and new development areas
  • ensure that pedestrian crossing treatments maximize pedestrian safety
  • consider maintenance needs and abilities with recommendations

measuring and assessing walkable conditions

the project began with snyder gathering input from various city departments, community-representative stakeholder groups, and engagement events. the information gathered allowed the team to provide an assessment of current network conditions, which focused on existing and planned trails and sidewalks, destinations, school walk zones, and crash data. to supplement the assessment, online 世界杯足球比赛预选赛 engagement was conducted using map.social, a map-based outreach website. the effort attracted 67 contributors that provided 214 data features and comments related to community walkability. the resulting information covered problematic intersections or crossings, gaps in sidewalk and trail routes, hazardous conditions, and pedestrian destinations.

working closely with staff and the steering committee, we prioritized the urgency of each data feature as either high, medium, or low and assigned a recommendation to address each issue, such as “review for intersection improvements” or “build sidewalk with sidewalk program.” the plan provides guidance on the types of intersection and crossing improvements to consider, along with estimated construction costs and expected lifecycles. it also includes a list of potential funding opportunities for sidewalk and trail improvements.

finally, snyder & associates reviewed 11 city ordinances and policies and provided recommendations to make them more pedestrian-friendly. for example, recommendations addressed landscaping in the road right-of-way, site plan design standards for requiring pedestrian paths to connect sidewalks or trails to main entrances, and when to construct a typical sidewalk versus a sidepath. the plan also encourages the city to take future mobility trends such as scooters and bike share systems into account.

2022世界杯32强预选赛 for a more walkable community

at the conclusion of the project, we presented the 2022世界杯32强预选赛 process, data, and final plan to the city council, ensuring all of their questions were answered and that they understood the source of the information and resulting recommendations. using the implementation chapter of the plan, the city will continue to make pedestrian-friendly infrastructure and policy updates.

services provided by the snyder & associates team ranged from the assessment of existing conditions and walkability to 世界杯足球比赛预选赛 engagement and meeting facilitation, ordinance recommendations, cost opinions, and land 2022世界杯32强预选赛 .

view the johnston walkability study in its entirety.

client

city of johnston

client type

project type

rich voelker, p.e.

rich voelker, p.e.

transportation business unit leader

related projects

||||

creating a safer, smarter space for animal services in des moines

at the corner of se 14th and harriett streets in des moines, a forward-thinking facility now stands as a beacon of care for animals and the community. the new des...

innovative structural solutions at the historic polk county courthouse

the polk county courthouse, a 1906 beaux arts classical landmark, has been thoughtfully restored to meet the evolving needs of the county while honoring its storied...

radial collector wells strengthen water supply for atchison, kansas

reliable access to safe drinking water is essential for any community, and the city of atchison is taking proactive steps to enhance its raw water supply system. as...
|||||

ziggy park ball field: a lasting gift to the deforest & windsor communities

snyder & associates is proud to have played a key role in the development of ziggy park, a new baseball facility in the village of deforest that enhances the...
||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...

more than 45 years

serving clients around the country

db+