2727 sw snyder blvd, ankeny, ia 50023

1 (888) 964-2020



navigation

back to projects | project categories: wastewater

cedar falls lift station

the steadily growing population and expanding commercial base within the city of cedar falls caused the city’s sewer system to have capacity issues.  in 2006, the city asked snyder & associates to examine the bluff street lift station and the sanitary sewer collection system that drained to it. that analysis led to the development of a bluff street lift station drainage area wastewater master plan which examined the existing sanitary capacity, the likelihood for future growth, and the ability of the current system to handle existing and future sewer flows. the city proceeded with plans to replace the existing bluff street lift station and construct a new 17th street lift station to increase sewage pumping capacity and meet long-term needs of the growing community.

the 17th street lift station was designed to increase sewage pumping capacity from 17,000-gallons per minute (gpm) to 24,000 gpm with capacity for additional upgrades in the future to 37,500 gpm.  the new facility includes:

  • screening to protect lift station pumps from damage
  • a self-cleaning component for the wet-well
  • four pumps capable of delivering less than 1,000 gpm each and at least 24,000 gpm when three are operating in parallel
  • emergency power in the lift station
  • increased flood protection by making the lowest access to the facility more than two-feet higher than the 1 percent annual chance flood event, also referred to as the 100-year flood, and one foot higher than the previously recorded high water level in the area, which occurred during the 2008 flood.

gates and bar screens.

the new lift station has provisions for adding a fifth pump and upgrading the new pumps in the future to meet growing system demands.  additionally, space was reserved for carbon scrubbers to be added as needed in the future to meet enhanced environmental requirements or neighborhood needs. the existing force main was utilized while still increasing pumping capacity by more than 40 percent. the existing lift station is to be recommissioned for use by the fire department for testing equipment.

the new facility exceeded the project goal by delivering flows below the requested 1,400 gpm minimum. optimum performance was demonstrated during the summer of 2013 when a drought reduced the flow rate to less than 1,000 gpm and continuous sewage flows to the treatment plant were maintained. additionally, the project was constructed approximately $400,000 (5 percent) under budget.

client

city of cedar falls

client type

project type

no team members assigned to this project.

related projects

exposed siphon at omaha papio creek|drone map of the papio creek in omaha ne|papio creek stream

safeguarding critical infrastructure and water resources: omaha’s “papio” creek

in march 2019, the city of omaha faced a significant threat to its critical infrastructure under west papillion creek (known to locals as papio creek). a disastrous...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
slater wastewater treatment greenhouse at sunset|wastewater lagoon with aeration bubbles|greenhouse and settling pond|aerial view of large lagoon cell drained for construction|slater's new greenhouse for wastewater treatment|inside slater greenhouse with empty cells|inside of slater wastewater treatment plant with algae belts.|slater wastewater treatment plant ribbon cutting|visitors walk inside the new slater greenhouse and view rab belts|aerated lagoon at the slater wastewater treatment plant|rab belts at the slater wastewater treatment plant

slater incorporates algae to treat community wastewater

for years, the city of slater used an aerated lagoon system as its primary wastewater treatment method. however, increased awareness of pollutants and their impact on...
blue and red map of sewer system service area|corroded manhole|lime green map of pleasant hill sewer system and neighboring communities

growth in pleasant hill leads to sanitary sewer system review

snyder & associates was tasked with conducting a sanitary sewer system review, identifying long-term system and infrastructure upgrades.

square concrete new lift station|above ground section of vertical screen|large machine used to bore holes and make way for pipe|trenchless construction|lead tubing being placed before pipe|concrete tube that will eventually house pumps|square concrete new lift station

lift station upgrades eliminate backups & increase efficiencies: anamosa

anamosa 2nd street wastewater lift station improvements as community leaders in mature communities know, the need for new and more efficient wastewater systems is a...
large rectangle wastewater lagoon pond|snowy fields with school in distant background||large dirt hole during lagoon construction|concrete walls of the lagoons lift station placed in the ground

starmont high school’s wastewater dilemma requires speedy solution

thanks to positive client relationships and word-of-mouth recommendations, snyder & associates was hired to find a viable wastewater solution for a high...
aerial view of two large blue lagoons and operation buildings||waterside view of lagoon and gravel shores|metal walkway between two lagoons. one is rough and one is smooth.||

west burlington’s wastewater treatment plant upgraded to meet current npdes requirements

snyder & associates wastewater engineers were enlisted to develop a plan for remodeling and expanding west burlington’s existing wastewater treatment...
car sprays water while driving through a large puddle||car sprays water while driving through a large puddle|view of downtown skyscrapers at then end of a main street|satellite map with project area outlined in red|construction work in a deep trench

des moines’ sewer separation initiative prevents flooding, backups & overflows

antiquated stormwater & wastewater system fails to meet new standards when the city of des moines wastewater system was initially constructed, viable methods for...
inside of the disinfection-flow equalization tank.|inside of the sbr tank looking at the aeration piping system.|inside of treatment tank looking at piping

custom wastewater treatment solutions for growing industrial client

working with this industrial client for over ten years, snyder & associates continues to provide the most cost-effective, environmentally-sound, and...
cement building with blue roof|grey wall of electrical pannels|multiple pumps in cement room|three oval motors in a row|looking down on multi-level facility floors|

new pump station expands st. joseph’s eastside sewer system reach

the city of st. joseph selected snyder & associates to replace the outdated, undersized easton road pump station with a newly designed wastewater facility in an...

more than 45 years

serving clients around the country

db+