athletic field improvements & expanded facilities for mcfarland school district

community-minded renovations increase facility usability

nestled along the east bank of lake waubesa just south of madison, the village of mcfarland has experienced steady population growth over the past several decades. this influx of new residents found the local school district slowly outgrowing their current facilities. with the last major renovations at the high school having occurred more than twenty years ago, the district was dealing with inadequate learning spaces and ongoing maintenance issues. in 2016, a $65 million bond referendum was passed by the community, enabling the district to move forward with renovations and additions across all four of their facilities.

flooding on field

flooding was common prior to construction

working in conjunction with plunkett raysich architects, the snyder & associates engineering and 2022世界杯32强预选赛 team provided invaluable site development services for this multi-year project, as well as providing extensive sports field design plans. all projects were designed to accommodate the ongoing community growth and match the district’s high-quality educational and community-based programming needs.

overcoming stormwater issues, access constraints & space challenges

each project site presented unique challenges to the design team. at the middle and high school locations, this included dealing with stringent stormwater management requirements and managing the replacement of existing undersized storm sewer systems within 世界杯足球比赛预选赛 rights-of-way. as a result, seven bioretention basins were incorporated into the design to address the requirements for rate control, water quality, and infiltration. also at these two school locations, site access and space challenges were addressed using several retaining walls to terrace steep slopes, in addition to relocating the baseball and practice fields.

coordinating the completion of the building additions without disruptions to school schedules over a multi-year period required careful 2022世界杯32强预选赛 and foresight. this also involved balancing everyday pedestrian and vehicle traffic around a busy construction schedule. our team also provided land survey services, construction administration, observation, and staking, and water quality and hydrologic modeling.

modern sports venues feature top-of-the-line amenities

renovation plans included improvements to the district’s sports venues. the mcfarland high school stadium had the natural turf field replaced with a synthetic turf field, while the running track around the field was reconstructed and shifted slightly to allow space for the school building expansion. synthetic turf withstands frequent use better than natural grass, which is important as the football field also accommodates other athletic school functions. a key component of the athletic field design is a rock and drain tile subbase that promotes better drainage during heavy rain events.

to make room for the high school expansion, the existing baseball field and outfield practice areas had to be removed. these areas are also used for physical education classes, band, football, and soccer practice. a sizeable green space was left intact behind the school for classes and extracurricular use, while a new baseball field complex was relocated a short distance from the school complex. the new complex includes varsity and junior varsity fields, each enclosed with fencing and include foul ball poles, upgraded dugouts, and a new scoreboard. the varsity field has a synthetic turf infield and natural turf outfield with a rock and drain tile subbase. the junior varsity diamond features a dirt infield with a natural turf outfield.

new dugout with benches

the upgraded baseball field dugout for the new complex

building & facility upgrades enhance learning options

at the elementary school level, improvements began with the demolition of the mcfarland primary school and additions and renovations to the neighboring conrad elvehjem early learning center. now renamed the conrad elvehjem primary school, these improvements brought kindergarten through second-grade students and staff together in one building with improved learning spaces.

the waubesa intermediate school benefited from new classrooms, a cafeteria, a larger library, and special service space for occupational, physical, and speech therapy sessions. a new roof, windows, and doors, as well as extensive maintenance work to the plumbing, heating, and cooling systems, were also performed. new wiring was installed throughout the building to meet the school’s growing technology needs.

located adjacent to the high school, indian mound middle school was the beneficiary of a new two-story classroom addition. additionally, multiple classrooms were renovated and the gymnasium was expanded.

the most extensive renovations took place at mcfarland high school where a new performing arts center and swimming pool highlighted the improvements. the former swimming pool and auditorium were constructed in 1978 and no longer met the district’s needs. the swimming pool addition features a 10-lane pool, additional spectator bleachers, expanded locker rooms, and improved accessibility. the old pool area was converted into a fitness center and weight room.

the new performing arts center features expanded patron seating to 841-seats with improved accessibility, enhanced lighting and sound system, a larger stage, and a full fly loft. located on the backside of the school, the performing arts center and new pool benefited from the addition of an 81-stall parking lot for staff and building guests. this access point further developed to include a drop-off area, creating a new entrance for the additions. many of these new spaces incorporated into the renovations were designed not only for school use but also for other community activities after hours.

a student resource center and additional classroom spaces were also added to the high school. a second story was constructed above the existing district office and the technology education area was renovated to better suit department needs. the majority of the district improvements were completed in time to reopen for the 2020-21 school year.

client

mcfarland school district

client type

project type

mike calkins, p.e.

mike calkins, p.e.

madison business unit leader

related projects

||||

creating a safer, smarter space for animal services in des moines

at the corner of se 14th and harriett streets in des moines, a forward-thinking facility now stands as a beacon of care for animals and the community. the new des...
||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
|||||

ziggy park ball field: a lasting gift to the deforest & windsor communities

snyder & associates is proud to have played a key role in the development of ziggy park, a new baseball facility in the village of deforest that enhances the...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...

more than 45 years

serving clients around the country

db+