adaptive signal control technology (asct) system along busy corridor set to reduce travel times: pleasant hill

community growth drives need for signal upgrades

the city of pleasant hill, iowa has turned to snyder & associates for professional transportation engineering services on numerous occasions over the past decade. this thriving and growing suburb located east of the des moines metro carries a high volume of traffic through town, particularly along the busy iowa highway 163 corridor. this corridor has seen many physical improvements and intersection upgrades over the years. however, the existing traffic signal system is not capable of incremental, short-term, or continuous timing changes to automatically accommodate fluctuations in traffic demand without manually adjusting signal timings. this leads to traffic congestion and queuing issues at numerous locations.

to combat this issue, the city decided to investigate the possibility of implementing adaptive signal control technology (asct) at 13 intersections along the busy corridor. this project would include the installation of adaptive signal control technology along highway 163 at 10 signalized intersections — stretching from copper creek drive to ne 80th street. it would also include three additional signalized intersections that are adjacent to highway 163.

what is adaptive signal control technology (asct) for traffic signals?

with standard traffic signals, retiming might only occur every few years and is reliant on time-consuming, manually collected data. even then, standard time-of-day signal timing plans don’t accommodate for variable and unpredictable traffic patterns. this results in more delays due to congested traffic, excess fuel consumption, and frustrated drivers.

adaptive signal control technology (asct) uses sensors to gather real-time traffic information and monitor the system’s performance along an entire corridor. this information is quickly evaluated and signal timing improvements are developed by an algorithm. the asct implements the updates continually, sharing information between signals to make timing adjustments. these constant adjustments accommodate traffic patterns that are different from the peak periods (during which the standard signals were designed to operate) and help keep traffic flowing smoothly.

a street view of the traffic signal system with blue sky

this project includes the installation of adaptive signal control technology along highway 163 at 10 signalized intersections

systems engineering study determines need for asct

to determine if asct was necessary for this corridor, a systems engineering study needed to be conducted. based on the strong relationship between the city of pleasant hill and snyder & associates, our traffic engineers were tasked with performing this study. a systems engineering study is a meticulous process that follows guidelines established by the federal highway administration (fhwa). this type of study is also a requirement of most state dots to be eligible for grant and other program funding.

because there are numerous adaptive control systems available, it’s critical to know the existing conditions of a corridor before issuing a request for proposals (rfp). to that end, a systems engineering study looks at peak/off-peak traffic conditions and studies turning movement counts along the corridor. the engineering team also inventories the current signal controller equipment in use, the communications network in the area, and any geometric concerns that may need to be addressed at individual intersections.

additionally, other improvements to modify signal controller cabinet equipment or update the communication network are considered. fortunately, all of the intersections in the study group already have relatively modern controller cabinets, signal controller hardware, and a strong fiber optic network from prior traffic signal system projects. fiber optic connectivity is a strong necessity for most asct installations to provide the level of communication necessary for optimal performance.

the systems engineering study also considered the detection system in use along the corridor. currently, pleasant hill uses inductive loop detection at all of the intersections, with video detection at one intersection. the study determined that some of the loops were failing, causing the city to consider switching to a non-intrusive video or radar detection system. our team provided guidance for possible replacement detection measures for future implementation.

operational considerations & unique challenges for asct determination

several important operational considerations along the highway 163 corridor were taken into account during the study. foremost was accommodating peak traffic periods, mini peak periods, and near real-time changes in traffic volumes.

there are several event facilities located along or near the corridor. the southeast polk school complex and several churches host various events throughout the year. the iowa state fairgrounds (approximately one mile west of the city of pleasant hill) hosts the iowa state fair annually. highway 163 is a designated route to the fairgrounds and the southeast polk schools provide a park-and-ride service for fair attendees. an asct system would need to handle the increased traffic from such events as they occur.

returning to normal operation quickly after coordinated signal operations are disrupted by pedestrian actuation and emergency vehicle preemption is another necessity of an asct system. any proposed system should be able to support the existing emergency vehicle preemptive (evp) system currently in place at all intersections. since there is limited pedestrian activity along the corridor, the proposed system should be able to accommodate the pedestrian demand, while minimizing impacts to vehicle traffic.

queue management was also a study focus along the corridor, including the us highway 65 ramp intersections. heavy queueing concerns at both ramp intersections can impact through-traffic operations along highway 65. additionally, the ne 56th street intersection was notable for experiencing periodic queueing problems that impact traffic flow along the corridor.

funding & rfp assistance

the results of the extensive systems engineering study determined asct would be the proper solution for the issues plaguing the highway 163 corridor through pleasant hill. to facilitate the process, snyder & associates assisted the city by compiling and submitting an iowa clean air attainment program (icaap) funding application with the iowa dot. approximately $580,000 in icaap funds would be used for the engineering study, as well as procuring and installing the asct system.

additionally, the snyder & associates team wrote the extensive rfp submittal. as proposals are received, our team will also help the city determine the best vendor to implement its asct solution. the future success of this project will be measured by a notable reduction in intersection delays and travel times along highway 163 in pleasant hill. this will result in a reduction in vehicle emissions and pollutant output caused by stopped vehicles and excessive idling. the deployment of an asct system along this corridor will also allow the city to proactively manage traffic, enhance operations, increase mobility, and reduce congestion.

client

city of pleasant hill

client type

project type

mark perington, p.e., ptoe

mark perington, p.e., ptoe

traffic work group leader

related projects

roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
newly poured concrete roadway|construction workers pouring concrete for stormwater drainage|cement truck pours wet concrete onto newly established roadway|construction workers in large hole for sanitary sewer|crews lay wet cement

major street reconstruction project benefits waverly community

the 4th street sw corridor is a busy north/south thoroughfare in the heart of the waverly community. this busy stretch provides access to the bustling business district...
|construction workers under bridge|bridge underpass|i-35 bridge construction|pedestrian sidewalk on bridge|under interstate bridge|google maps of i-35 bridge in iowa|side view of an interstate bridge|concrete bridge in iowa|concrete sidewalk bridge|busy traffic and a gas station||||||||||

corporate woods drive bridge over interstate 35 supports new development

the rapid population growth in ankeny, iowa can in large part be attributed to its proximity to des moines and the easy access to interstate 35. to support new site...
diamond grinding construction truck.|fault line in a road being measured||large construction truck and workers on a road.|pavement technology machine.|road construction|

pavement structural integrity analysis drives kiwanis avenue rehabilitation

when the busy kiwanis avenue corridor in sioux falls began to show signs of deterioration, city leaders turned to the professionals with snyder & associates to...