stream & sanitary sewer protection: fourmile creek

improving ecological stream functions & habitat

the wra fourmile creek improvements-north of broadway project protects vital infrastructure while fostering improved ecological functions and habitat. traditional infrastructure protection with riprap at single bends was abandoned because of the low ecological value. generally speaking, the ecological value of an organism, natural resource, activity, and other components of natural ecosystems are defined by the benefits they provide to support native life.

integrating ecological lift techniques within this complex project has garnered a 2019 engineering excellence honor award from the acec-ia.

this project began when streambank erosion at several fourmile creek locations put sanitary sewer infrastructure at risk. snyder & associates’ experience with environmental engineering, fluvial processes, and stream restoration prompted the des moines metropolitan wastewater reclamation authority (wra) to seek our assistance on a creative solution to address the issue. collaboration was essential in creating a vision for the project as well as identifying project priorities and opportunities.

by reading the river and using natural channel design concepts, this project transformed an environmental liability into an improvement that:

  • boosts water quality through sediment loading reductions and vegetative filtering of nutrients
  • strengthens the safety of stable/non-vertical banks
  • reduces the risk of downstream flooding
  • creates a user-friendly recreational environment
  • enhances the aquatic habitat for fish and other living organisms

funding assistance strengthens project impact

wra embraced the opportunity to leverage srf sponsored project funding associated with their infrastructure improvement loans. as a result, they expanded a limited bank stabilization project to protect their sanitary sewer infrastructure into a comprehensive stream restoration approach that benefits longer reaches.

through several applications, we helped the wra secure $4.2 million in funding assistance to leverage their limited traditional funds. we were also able to successfully coordinate with multiple agencies and partners to facilitate right-of-way acquisition and meet funding requirements. over 8,000 feet of stream restoration was prioritized in three fourmile creek reaches—north of broadway avenue, north of euclid avenue, and south of university avenue—to reduce severe bank erosion and channel degradation, and protect sanitary sewer infrastructure.

client

des moines metropolitan wastewater reclamation authority (wra)

client type

project type

jeff walters, pws

jeff walters, pws

environmental sciences work group leader

related projects

||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...
exposed siphon at omaha papio creek|drone map of the papio creek in omaha ne|papio creek stream

safeguarding critical infrastructure and water resources: omaha’s “papio” creek

in march 2019, the city of omaha faced a significant threat to its critical infrastructure under west papillion creek (known to locals as papio creek). a disastrous...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
south dakotas capitol building behind dredging equipment on lake|excavator on floating platform|excavator dredging from shoreline|sediment being pulled from lake bed|aerial view of capitol lake in south dakota|dump truck being filled with sediment from of south dakota's capitol lake

sediment buildup necessitates lake dredging project at south dakota capitol complex

one of the prominent features complementing the architectural beauty of the capitol complex in pierre, south dakota, is the 9.5-acre capitol lake. fed by a naturally...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...

more than 45 years

serving clients around the country

db+