tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an east/west crosstown route along the northern edge of the cedar rapids metro area. stretching from interstate 380 in the west to highway 13 in the east, the tower terrace road corridor was the preferred option to provide access to an area with a projected population growth of 40,000 by 2040. a significant piece of this northern connector was recently realized with the upgrades to the i-380 interchange and the extensive roadway improvements on both sides of the interchange.

the new interchange was reconfigured to a diverging diamond interchange (ddi) formation to improve efficiency and safety. working in conjunction with the interchange design group, the iowa dot, and multiple jurisdictions, the team from snyder & associates was chosen to design the critical roadway elements on either side of the interchange to ensure a smooth and safe transition for motorists.

west side roadway improvements

on the west side of the interchange, our group was tasked with developing designs to reconstruct tower terrace road from 1,000 feet west of miller road to the i-380 interchange. this included updating the roadway from a rural section to an urban section with pedestrian accommodations.

staging for the project construction was critical for maintaining access to nearby homeowners and a busy commercial business on the south side of the roadway. our team designed a temporary access road along the south side of the street between miller road and twisters gymnastics to maintain access during construction. on the north side of the roadway, a temporary entrance and gapped paving were used to support access to an impacted homeowner. in addition to coordinating with the numerous utility conflicts in the project area, we devised a plan for temporary drainage during the staged construction to alleviate stormwater concerns.

during design, our team continuously contacted the idot’s consulting engineer for the ddi portion of the project to ensure our design matched the interchange tie-ins. we also prompted numerous design team meetings with the idot to ensure seamless project coordination.

east side roadway upgrades

north center point road traffic transitions into the roundabout at tower terrace road.

to the east of the interchange, constructing a roundabout at the north center point road intersection was a critical infrastructure upgrade to improve efficiency for drivers near the new ddi interchange. this joint project between hiawatha and the iowa dot was also constructed concurrently with the interchange.

the roadway upgrades include a 4-lane section with a sidewalk on the north and a 10-foot-wide trail on the south side just east of the interchange. the roundabout was designed with a single through lane for north and southbound traffic, dedicated eastbound and westbound right turn lanes, and two through lanes for eastbound and westbound traffic. the design and construction allow for the future addition of another northbound and southbound lane without requiring reconstruction or road closures. our team’s design also alleviated environmental concerns relating to the tower terrace mobile home park adjacent to the new section of the roadway.

as with the west side improvements, extensive coordination meetings with the dot’s consulting engineer were initiated to ensure interchange project alignments and profiles matched. we also designed the west and east side improvement projects to be a “mandatory tie” with the i-380 interchange project. this allowed all three projects to be completed under the same contract and timeline, saving the client money through a larger-scoped project that attracted a large pool of contractors.

tower terrace road stands to become an essential commercial corridor that will promote sustainable development and help the surrounding communities become more vibrant. with a considerable piece of this northern connector now open, this long-planned objective may be realized sooner than expected. the snyder & associates team has also been active with other sections of this vital corridor connection. it looks forward to providing services to all agencies and communities involved in bringing this extensive project to a successful conclusion.

client

cities of cedar rapids & hiawatha

client type

project type

no team members assigned to this project.

related projects

||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
this rendering shows several design ideas that would allow food trucks to inhabit the space for community events|overhead deception showing numerous amenities the design team proposed for the merrill alley section of this project|plans showing the upgrades and improvements to transform 3 alley ways in fort dodge

fort dodge alleyways three-block master plan enhances community space

in the heart of fort dodge, tucked away behind the buildings lining central avenue between ninth and 12th streets, lies the canvas for an ambitious project — the fort...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...

more than 45 years

serving clients around the country

db+