noelridge park stream mitigation improves park’s biological health

restoration & stabilization required to combat stream erosion

exposed storm pipe

areas that previously had storm pipes inserted experienced severe erosion.

conveniently located on the north side of cedar rapids, noelridge park is a 100-acre community park complex filled with a host of recreational amenities. these include ball diamonds, botanical gardens, a greenhouse facility, a modern playground area and splash pad, an aquatic center, tennis courts, and a trail network that ties it all together. a nearby stream feeds the park’s centrally-located pond and provides fishing and small boating opportunities.

under previous construction efforts, portions of the stream had storm pipes installed while the remainder of the channel was filled in. years later, both the piped and channelized sections were determined to be unstable after experiencing significant erosion, leading to sediment transport. this not only caused safety concerns along the banks but diminished the overall water quality of the park’s pond. a stream channel restoration and bank stabilization project was needed to mitigate these issues. however, the project couldn’t get off the ground without adequate funding.

following historic floods, cedar rapids utilized a clean water state revolving fund loan to upgrade its water pollution control facility. at the same time, a water resource restoration sponsored project was applied for and awarded to the city. this project allowed interest from the state revolving fund loan to be redirected to noelridge park, offering a unique funding option to restore a section of the stream.

multiple stream renovation methods used to improve park’s health

once funding was secured, a team from snyder & associates modeled watershed and stream flows throughout the city and into noelridge park. a typical stream cross-section was designed to accommodate normal flow levels and allow overflow to the channel cross-section’s upper portions and into the floodplain.

as part of the restoration design, the stream’s length was increased, and the channel slope was decreased by incorporating meanders into the stream. energy dissipaters for culvert outlets and rock check dams were integrated into the stream channel design to reduce the channel slope further and reduce stream velocities. native plants, forbs, and flowers were selected, along with native seed mixtures, to help naturally stabilize the channel. by stabilizing the banks in noelridge park, not only should the water quality be improved, but the entire 世界杯足球比赛预选赛 area’s biological health has also been enhanced.

importance of 世界杯足球比赛预选赛 education on water best management practices

due to the high volume of visitors to this recreational destination, it’s also expected that community education on water quality best management practices (bmps) will increase. educating the 世界杯足球比赛预选赛 is essential when discussing bmps to improve watershed health since the 世界杯足球比赛预选赛 ’s actions directly impact the quality and quantity of water in local lakes, streams, and rivers. an effective management plan cannot be implemented without the basic knowledge of what methods and policies affect the watershed’s health.

through facilitating 世界杯足球比赛预选赛 engagement, our team strives to discover approaches to make our work more relevant to communities. at noelridge park, we worked closely with city staff who maintain the native plants to help control invasive species. after the restoration project, the stream is now in a naturally stable condition with a significant reduction in erosion. native plants are once again thriving and help provide natural stormwater filtration, improving the stream’s overall water quality. these sustainable upgrades will ensure that the park continues to be a favorite gathering place for residents and visitors well into the future.

client

city of cedar rapids

client type

project type

no team members assigned to this project.

related projects

||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
exposed siphon at omaha papio creek|drone map of the papio creek in omaha ne|papio creek stream

safeguarding critical infrastructure and water resources: omaha’s “papio” creek

in march 2019, the city of omaha faced a significant threat to its critical infrastructure under west papillion creek (known to locals as papio creek). a disastrous...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
newly poured concrete roadway|construction workers pouring concrete for stormwater drainage|cement truck pours wet concrete onto newly established roadway|construction workers in large hole for sanitary sewer|crews lay wet cement

major street reconstruction project benefits waverly community

the 4th street sw corridor is a busy north/south thoroughfare in the heart of the waverly community. this busy stretch provides access to the bustling business district...

more than 45 years