modern behavioral health center adapted for infill development

mercyone central iowa & universal health services team up for behavioral health center

water color rendering of building

architect’s rendering of the new clive behavioral health facility.

when mercyone central iowa partnered with universal health services to establish a new behavioral health facility in clive, iowa, they hired johnson johnson crabtree architects, p.c. (jjca) to design the new structures and campus. jjca in turn tasked snyder & associates to provide the expansive site development plans and drawings for this proposed infill project.

situated across the street from the current mercyone health plaza and mercyone rehabilitation hospital, this new 78,000 sq. ft. state-of-the-art complex consists of a one-story clinical and support services area, along with an accompanying three-story unit for inpatient and outpatient services. together these facilities will accommodate 100 patient beds for providing advanced behavioral health services.

infill site presents stormwater challenges

by definition, infill projects consist of the development of vacant parcels within previously built areas. they provide a smart alternative to ever-expanding sprawl by taking advantage of locations that are typically already served by 世界杯足球比赛预选赛 infrastructure. but infill sites can present numerous challenges and constraints for development engineers. the foremost challenge for this project was fitting all of the required amenities on this tight building site — structures, parking, courtyard — while still accommodating for the rigorous stormwater standards.

above-ground detention facilities are a common solution for mitigating stormwater runoff in many urban commercial situations. for this space-constrained project, however, our designers devised a plan to create a large underground detention basin below the parking lot using a stormtech® manufactured system. the basin consists of several large, corrugated chambers surrounded by gravel. once covered, stormwater is diverted to the basin through normal channels where it’s temporarily stored. it’s then released through a series of outlets that are specifically designed to let water out in a controlled manner to mitigate flooding issues.

building mid-construction without exterior finished

indoor work closely to commencing in portions of the new facility.

in addition to the extensive stormwater design, the team also created plans for the site utilities, grading, landscaping, and parking lots that met the city’s standards. they also provided a detailed courtyard design for behavioral health therapy use and outdoor space for patients of all ages. the design team’s creative use of gravity-style retaining walls minimized the impact on adjacent properties while maximizing the available building site.

this development project is just a sampling of the work snyder & associates has performed for the healthcare industry. with substantial completion slated for the fall of 2020, the clive behavioral health center will soon be open to provide a valuable service for the community in a facility designed to provide the best experience possible for patients.

client

johnson johnson crabtree architects, p.c.

client type

project type

eric cannon, p.e.

eric cannon, p.e.

development business unit leader

related projects

||||

creating a safer, smarter space for animal services in des moines

at the corner of se 14th and harriett streets in des moines, a forward-thinking facility now stands as a beacon of care for animals and the community. the new des...
||

madison’s first permanent men’s shelter prioritizes sustainability & dignity

for decades, men experiencing homelessness in madison sought shelter in temporary spaces, often in church basements or emergency accommodations. that will soon change...
aerial view of wlcsd new football field.||west liberty athletic complex|aerial image of the two new ballfields at the wlcsd athletic complex.|close up aerial image of the backstop area at the new wlcsd athletic complex.|aerial image of wlcsd new football field and track.|new synthetic turf being installed at the wlcsd athletic complex.

west liberty athletic complex consolidates multiple venues

the west liberty community school district (wlcsd) selected feh design and snyder & associates to prepare an athletic facility plan to consolidate their football,...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
newly poured concrete roadway|construction workers pouring concrete for stormwater drainage|cement truck pours wet concrete onto newly established roadway|construction workers in large hole for sanitary sewer|crews lay wet cement

major street reconstruction project benefits waverly community

the 4th street sw corridor is a busy north/south thoroughfare in the heart of the waverly community. this busy stretch provides access to the bustling business district...