increased growth along iowa highway 141 leads to corridor study

improved operations & safety key to corridor study focus

as communities surrounding the city of des moines continue to experience rapid growth, the roadways that carry traffic into and around the city have also seen increased traffic flows. serving as a major freeway link between des moines and the outlying communities to the northwest, iowa highway 141 is one of those impacted roadways. one particular section of iowa 141 directly east of the town of granger had been especially hard hit by increased traffic flows — experiencing an increase in the number and severity of crashes where it intersects with northwest 121st street.

in partnership with the iowa dot, polk county authorities engaged snyder & associates to review traffic operations and the safety history along this busy stretch of the highway corridor. the study was designed to identify short-term traffic engineering solutions and alternatives that can be implemented to improve safety and operations. because this stretch of corridor also intersects with the western-most termination point of iowa highway 415, this study also included long-term interchange, intersection, and corridor improvement needs to meet the forecasted increase in traffic demand.

targeted focus area for corridor study success

red truck turning at 4-way intersection

before the proposed improvements, left-turn movements at the busy northwest 121st street intersection were extremely dangerous.

the primary focus area for this project was to address safety concerns related to the elevated crash rate at the iowa 141 and northwest 121st street intersection. the east/west running iowa 141 is a four-lane, high-speed highway divided by a wide median. traffic attempting to enter from northwest 121st street faces a difficult and dangerous movement when crossing or turning left onto iowa 141. additionally, left-turning traffic was also subject to queuing issues in the median, leading to crashes. at the time of the study, this intersection was ranked 23rd statewide on the iowa dot safety improvement candidate location (sicl) list.

the secondary focus was to address all intersection operational issues within the corridor study area. in addition to the problems at the iowa 141 and the northwest 121st street intersection, our traffic analysis also revealed that the intersection of iowa 415 and northwest beaver drive was functioning at poor levels of service for some traffic movements during the am and pm peak periods.

世界杯足球比赛预选赛 input meetings drive solutions

numerous 世界杯足球比赛预选赛 meetings were key to the success of this study. an initial meeting was held to update concerned citizens and stakeholders on the study background data and environmental constraints in the focus area. also, the 世界杯足球比赛预选赛 feedback our team received regarding corridor safety and operations was used to advance potential intersection and roadway alternatives, and eventually assisted in the development of recommendations for improvements to the area.

a follow-up 世界杯足球比赛预选赛 information meeting allowed our team, along with polk county and iowa dot staff, an opportunity to explain the study and some of the alternatives being considered. residents and other interested parties were also allowed to express their opinions and ask questions regarding the project and any potential solutions.

numerous alternatives provided for consideration

to remedy the high crash levels at the iowa 141 and northwest 121st street intersection, four viable alternatives were put forward for consideration. these alternatives included:

  • alternative 1: making the intersection four-way signalized
  • alternative 2: creating a j-turn intersection
    • instead of motorists crossing fast-moving lanes of traffic to get to the opposing lanes, drivers at a j-turn intersection turn right in the same direction of traffic, merge into the left lane and then make a u-turn through the wide median and into the direction they intend to travel
  • alternative 3: the closure of northwest 121st street north of iowa 415 and the creation of an alternative north connector through the extension of northwest 110th court to the east of the iowa 141/415 interchange
  • alternative 4: alternative 3 with the westerly extension of iowa 415 to northwest 121st street, which also includes a reconfiguration of the interchange between iowa 415 and iowa 141

after weighing the extensive pros and cons of each alternative, the preferred option was alternative 3, which would drive traffic to the new north connector roadway. this in turn would encourage drivers to use the safer iowa 141/415 interchange for travel further south. while this alternative had a longer timeframe for completion, it offered the best solution for the return on investment and increased safety benefits. it also paved the way for the future implementation of the more extensive alternative 4 improvements.

in the interim, it was decided the iowa dot would construct an intersection collision warning system (icws) at the northwest 121st and iowa 141 intersection. an icws warns approaching drivers of an upcoming intersection. additionally, an off-set right-turn lane for westbound iowa 141 traffic was also included in advance of the long-term improvements deemed necessary by this study.

view down the middle of a road with double yellow stripe

the intersection at iowa 415 and northwest beaver drive will also see improvements as a result of the corridor study.

the iowa 415 and northwest beaver drive intersection options included making the intersection four-way signalized, the construction of a roundabout, or constructing additional through lanes with a continued four-way stop. the addition of more through lanes was the ultimate best candidate for improving this location.

with an environmental study for the proposed north connector currently underway, the improvements to the corridor are progressing as planned. the upgrades identified by the snyder & associates corridor study will result in a considerable quality of life improvement for roadway users, as well as improved safety, efficiency, and traffic flow well into the future.

client

polk county

client type

project type

wade greiman, p.e.

wade greiman, p.e.

transportation business unit leader

related projects

overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
newly poured concrete roadway|construction workers pouring concrete for stormwater drainage|cement truck pours wet concrete onto newly established roadway|construction workers in large hole for sanitary sewer|crews lay wet cement

major street reconstruction project benefits waverly community

the 4th street sw corridor is a busy north/south thoroughfare in the heart of the waverly community. this busy stretch provides access to the bustling business district...
|construction workers under bridge|bridge underpass|i-35 bridge construction|pedestrian sidewalk on bridge|under interstate bridge|google maps of i-35 bridge in iowa|side view of an interstate bridge|concrete bridge in iowa|concrete sidewalk bridge|busy traffic and a gas station||||||||||

corporate woods drive bridge over interstate 35 supports new development

the rapid population growth in ankeny, iowa can in large part be attributed to its proximity to des moines and the easy access to interstate 35. to support new site...
diamond grinding construction truck.|fault line in a road being measured||large construction truck and workers on a road.|pavement technology machine.|road construction|

pavement structural integrity analysis drives kiwanis avenue rehabilitation

when the busy kiwanis avenue corridor in sioux falls began to show signs of deterioration, city leaders turned to the professionals with snyder & associates to...