2727 sw snyder blvd, ankeny, ia 50023

1 (888) 964-2020



navigation

roadway upgrades lead community to implement streetscape upgrades: pleasant hill

pleasant hill gateway and streetscape improvements

with a population that has nearly doubled over the past two decades, more than 10,000 people now call the city of pleasant hill home. situated on the eastern outskirts of des moines, pleasant hill is also a major hub of the gay lea wilson trail, providing direct access to des moines and altoona for outdoor enthusiasts. in light of the city’s steady growth, new streets and infrastructure were necessary to accommodate the burgeoning community. at the same time, a desire existed among city leaders to create a cohesive sense of place by tying certain areas of the community together through the use of streetscape and gateway enhancements.

one notable corridor was the newly reconstructed section of northeast 70th street extending south from highway 163 (east university avenue). this section of roadway was emerging as a major thoroughfare for pleasant hill residents seeking quick access to the u.s. route 65 interchange. snyder & associates was tasked with not only redesigning the roadway to accommodate heavier traffic loads but also to “rebrand” the roadway section as a distinctive pleasant hill entry point.

insufficient capacity & dangerous intersection addressed by roadway design

in its pre-construction state, ne 70th street was too narrow to effectively handle the increased traffic flows. also, a lack of sidewalks, ada-compliant ramps, and other multi-modal considerations were all negative marks for attracting new residents to the area. ne 70th street linked up with rising sun drive a short ⅓-mile south of highway 163. the current configuration had rising sun drive intersecting ne 70th street on a curve. this caused reduced sightlines for vehicles attempting to enter ne 70th and created a dangerous situation.

managing streetscape requirements with manageable maintenance 

the snyder & associates team coordinated with city staff and the 世界杯足球比赛预选赛 to help guide the design process and address key challenges. after a topographic survey and site analysis were complete, the designers prepared a master plan that incorporated attractive and safe streetscape features that help to create the desired sense of place. with the main goals of welcoming people to pleasant hill, expanding the roads, and tying together the existing gateway, the design team considered crucial elements, like stormwater, utilities, and safety, along with a balanced aesthetic and easy-to-maintain amenities.

the team’s forward-thinking approach included features like wider sidewalks to accommodate future growth, decorative pavements in the raised medians, new signage, landscaping, and upgraded street lighting. a gateway sign at the entrance of the roadway welcomes visitors and decorative, wave-like concrete and steel median dividers create a distinct transition into the neighborhood. a new roundabout eliminated the dangerous intersection and created an unimpeded traffic flow at the intersection of northeast 70th street and rising sun drive.

a concept rendering of a roundabout.

a roundabout at ne 70th street and rising sun drive keeps traffic moving smoothly along the corridor.

once fundraising is complete, a one-of-a-kind art piece will be installed in the center of the roundabout. the freestanding sculpture “phoenix” by volkan alkanoglu will stand 26 feet high and be visible from highway 163. future development plans call for roadway construction to continue further south and create a new boulevard section that connects near four mile elementary school, incorporating some of the same decorative features.

these thoughtfully planned improvements create a pedestrian-friendly environment with better traffic control and a noticeable transition to the neighborhood. when the final landscaping pieces are in place in spring 2020, guests will be able to fully appreciate the visual appeal of the amenities incorporated into this growing community.

client

city of pleasant hill

client type

project type

no team members assigned to this project.

related projects

overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
this rendering shows several design ideas that would allow food trucks to inhabit the space for community events|overhead deception showing numerous amenities the design team proposed for the merrill alley section of this project|plans showing the upgrades and improvements to transform 3 alley ways in fort dodge

fort dodge alleyways three-block master plan enhances community space

in the heart of fort dodge, tucked away behind the buildings lining central avenue between ninth and 12th streets, lies the canvas for an ambitious project — the fort...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
newly poured concrete roadway|construction workers pouring concrete for stormwater drainage|cement truck pours wet concrete onto newly established roadway|construction workers in large hole for sanitary sewer|crews lay wet cement

major street reconstruction project benefits waverly community

the 4th street sw corridor is a busy north/south thoroughfare in the heart of the waverly community. this busy stretch provides access to the bustling business district...
upgraded park landscaping and new amenities|clay paver pathway|park landscape upgrades|

peter melendy park upgrades enhance cedar falls riverfront

while the main street parkade renovations in recent years have been taking center stage in cedar falls, the upgrades to nearby peter melendy park and the surrounding...

more than 45 years

serving clients around the country

db+