back to projects | project categories: bridges | environmental | traffic

bridge widening & street reconstruction spotlight northeast 36th street upgrades

rural to urban roadway reconstruction

crews work on the phase one bridge reconstruction efforts on northeast 36th street.

over the past two decades, rapid population growth in ankeny has prompted the need for increased traffic capacity and improved safety, particularly along northeast 36th street between north ankeny boulevard and northeast delaware avenue. in 2012, construction was finalized on the interstate 35/northeast 36th street interchange project. while this project drastically changed the traffic patterns on the north side of ankeny, it was also the catalyst for transforming northeast 36th street from a rural, two-lane roadway to a four-lane urban boulevard with left-turn lanes and expansive pedestrian walkways and sidewalks.

as the design engineer for this ambitious project, snyder & associates (along with our subsidiary 2022足球世界杯小组赛赛程 ) provided transportation, civil, traffic, and structural bridge engineering services. additionally, our team designed a stormwater wetland and water quality basin located upstream from fourmile creek.

phased construction process keeps traffic flowing

aerial view of phase one bridge reconstruction efforts on northeast 36th street.

the northeast 36th street project has a strong regional impact due to its location and the surrounding transportation system. it’s highlighted in the ankeny comprehensive plan as a municipal arterial, with plans to ultimately extend the roadway all the way west to u.s. highway 415 as traffic volumes dictate. our team was tasked with developing a plan for the delaware avenue to ankeny boulevard section in the most cost-effective manner possible. to achieve this goal, major components of the project were established for bidding and staging, including:

  • widening the existing bridge over fourmile creek
  • complete reconstruction of three intersections along the corridor
  • disconnecting one intersection from northeast 36th street and replacing it with a hammerhead configuration
  • addition of a traffic signal at the intersection of northeast 36th street and northeast trilein drive

due to the extensive scope of the project, construction was split into two phases to be built over two construction seasons. during phase one, the bridge over fourmile creek was widened to accommodate four lanes of traffic. this portion of the project occurred with the street fully open to traffic, creating limited inconvenience to drivers.

during phase two, our team recommended putting a detour in place and closing the road to all motorists except for local traffic. this strategy benefited the city in two specific ways. first, it greatly improved bid prices from contractors since they would not have to contend with traffic staging obstacles. second, it allowed construction to occur during one construction season without a need for temporary pavement.

to avoid as many conflicts as possible during construction, our team closely coordinated with six franchise utility companies early in the design phase. the carefully crafted design minimized impacts outside the existing right-of-way, making temporary easement needs minimal throughout the 4,450-foot-long project corridor. other project features include landscaping, a new storm sewer, and water main, street lighting, and sidewalks.

stormwater treatment installation upstream from fourmile creek

iowa governor kim reynolds and iowa secretary of agriculture mike naig attend the ribbon-cutting ceremony.

a major highlight of the finished corridor project is a stormwater wetland and water quality basin built on city property south of the woodland reserve greenway & outdoor education center. designed by the snyder & associates team, the wetland was installed upstream from fourmile creek to treat storm sewer outlet water before it enters the creek. the wetland also includes a grass trail open to the 世界杯足球比赛预选赛 with educational signage to explain the stormwater treatment process.

to recognize the significance of the new stormwater wetland, a ribbon-cutting ceremony was held in 2018. attended by iowa governor kim reynolds and iowa secretary of agriculture mike naig, the governor also signed a proclamation declaring april 29 through may 6 as iowa soil and water conservation week.

with the improvements in place, the newly upgraded northeast 36th street corridor is now equipped to provide adequate safety and capacity for the ever-increasing regional traffic.

client

city of ankeny

client type

project type

no team members assigned to this project.

related projects

aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
exposed siphon at omaha papio creek|drone map of the papio creek in omaha ne|papio creek stream

safeguarding critical infrastructure and water resources: omaha’s “papio” creek

in march 2019, the city of omaha faced a significant threat to its critical infrastructure under west papillion creek (known to locals as papio creek). a disastrous...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
south dakotas capitol building behind dredging equipment on lake|excavator on floating platform|excavator dredging from shoreline|sediment being pulled from lake bed|aerial view of capitol lake in south dakota|dump truck being filled with sediment from of south dakota's capitol lake

sediment buildup necessitates lake dredging project at south dakota capitol complex

one of the prominent features complementing the architectural beauty of the capitol complex in pierre, south dakota, is the 9.5-acre capitol lake. fed by a naturally...
people enjoying 世界杯足球比赛预选赛
 launch at hubbard park|rendering of a canoe launch in wisconsin||||kinds in the water at hubbard park launch|families playing in the river at hubbard park launch

water access upgrade expands amenities at hubbard park: shorewood, wisconsin

hubbard park in the village of shorewood is a local landmark in this wisconsin community. located on a nearly five-acre, 1,400-foot-long strip of land between the...

more than 45 years

serving clients around the country

db+