jewellsworth trail strengthens rural community connection

abandoned railroad line presents trail opportunity

the communities of jewel and ellsworth in central iowa are but a stone’s throw away from each other. for many years, covering that short distance could only be safely accomplished by motor vehicle along busy highway 175. that all changed in 2006, however, when the union pacific railroad filed for the abandonment of a 3.2-mile stretch of track that ran between the two communities.

viewed as the ideal location for a future trail connection, the hamilton county conservation board secured funding assistance to acquire the track right-of-way through a special state transportation appropriation. with assistance from the iowa natural heritage foundation, hamilton county purchased the corridor in 2009. over several ensuing years, four additional properties were acquired to complete the necessary acquisitions for a trail connection.

establishing community connections with dependable design

the designers and engineers with snyder & associates were brought on board to help create the final trail alignment, as well as provide a host of necessary services. before the concept of the jewellsworth trail was born, hamilton county was home to just two trails — the one-mile-long jewell jubilee trail and the briggs woods trail, a 5.9-mile-long trail in webster city nearly 20 miles away.

additionally, a lack of sidewalks and narrow roads with limited shoulders made the transportation system around the two communities inadequate for walking and biking. the area had a critical need to fill these voids by providing safe, alternative transportation connections within and between both communities.

rural shared bike lane on town road

in both towns shared lane markings were created to complete the connection.

our design team quickly went to work establishing the best pathway to connect the two towns. the final design called for a ten-foot-wide, 3.5-mile-long, paved trail running mostly adjacent to highway 175 on the former rail line. in jewell, bicycle lanes and shared lane markings were established to complete an additional 0.5-mile-long connection through the downtown area to connect with the existing jewell jubilee trail. in ellsworth, shared lane markings created an additional 0.4-mile-long route through town.

noteworthy accomplishments & perseverance pave the way

during the trail alignment process, our team was faced with numerous challenges. the first called for the rehabilitation of two former railroad bridges between jewell and ellsworth. the first bridge consisted of a 63-foot-long timber bridge over an unnamed tributary. the second bridge was a 225-foot-long steel girder bridge over the skunk river. additionally, the plan also called for an entirely new trail bridge over a major drainage ditch.

to minimize the financial commitment of the county and both cities, multiple state and federal funding sources were sought for this project. by the very nature of granting periods and project requirements, obtaining the necessary funds was an arduous and drawn-out process. the commitment of several local stakeholders, along with the perseverance of our design team, ensured that the project didn’t get lost in “red tape” stumbling blocks and moved swiftly to completion once funding was secured. the steadfast dedication of this relentless group of people was the key ingredient that kept things moving forward.

future trail connections possible

steel trail bridge over a stream of water

this 225-foot bridge was rehabilitated as part of the jewellsworth trail project.

while it took nearly a decade of work and collaboration between a host of partners to move the jewellsworth trail from vision to reality, the new trail connection has brought the two communities closer together than ever before. area children can safely travel between the two communities, and recreational riders and those seeking exercise have the perfect reason to hit the trail.

substantially complete in 2016, the jewellsworth trail is the first complete section of what could become a larger trail loop that connects with and extends the iowa trail network. as the hamilton county conservation board and the iowa natural heritage foundation continue to plan future trail phases, snyder & associates is well-positioned to assist with critical design components.

client

hamilton county conservation

client type

project type

rich voelker, p.e.

rich voelker, p.e.

transportation business unit leader

related projects

aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
exposed siphon at omaha papio creek|drone map of the papio creek in omaha ne|papio creek stream

safeguarding critical infrastructure and water resources: omaha’s “papio” creek

in march 2019, the city of omaha faced a significant threat to its critical infrastructure under west papillion creek (known to locals as papio creek). a disastrous...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
south dakotas capitol building behind dredging equipment on lake|excavator on floating platform|excavator dredging from shoreline|sediment being pulled from lake bed|aerial view of capitol lake in south dakota|dump truck being filled with sediment from of south dakota's capitol lake

sediment buildup necessitates lake dredging project at south dakota capitol complex

one of the prominent features complementing the architectural beauty of the capitol complex in pierre, south dakota, is the 9.5-acre capitol lake. fed by a naturally...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
people enjoying 世界杯足球比赛预选赛
 launch at hubbard park|rendering of a canoe launch in wisconsin||||kinds in the water at hubbard park launch|families playing in the river at hubbard park launch

water access upgrade expands amenities at hubbard park: shorewood, wisconsin

hubbard park in the village of shorewood is a local landmark in this wisconsin community. located on a nearly five-acre, 1,400-foot-long strip of land between the...
||||||indian creek trail connection ribbon cutting

indian creek trail connection unites key marion neighborhoods

having doubled in population over the past three decades, the cedar rapid’s suburb of marion has been the dual beneficiary of a rapidly expanding metro area and the...
|||||led bridge lighting|couple walks across a lit up trail bridge at night||night time bridge lighting

trestle-to-trestle bridge over beaver creek reconnects urban loop

the 3.75-mile-long trestle-to-trestle trail connects the inter-urban trail in des moines to the johnston trail system on the north side of interstate 35/80. in the...

more than 45 years