mark c. ackelson trail design enhances easter lake park renovations

expanding recreational opportunities through trail connections

east lake pavement construction

crews work to install a new section of the mark c. ackelson trail.

in 2012, numerous stakeholders came together to develop the easter lake water quality management plan in response to severe water quality problems in the lake. this comprehensive plan would serve as the baseline for design work performed by snyder & associates. this work included a new spillway and fish-rearing pond improvements, the creation of lake drainage and hydraulic dredging plan, and extensive stormwater wetland improvements, just to name a few.

a separate but coordinated component of the easter lake restoration plan was the creation of a trail project to encompass the lake and connect with other area attractions. named in honor of the former iowa natural heritage foundation (inhf) president mark c. ackelson, the trail project was also designed by the snyder & associates team. the trail culminated from polk county conservation’s desire to improve safe access to easter lake park and expand recreational facilities. the result is a 4.1-mile trail loop encompassing the entire lake. a signature bridge located at the west end of the trail serves as an impressive focal point with overlooks at each pier. sidewalk connections to surrounding neighborhoods provide ease of access for residents and visitors alike.

to further expand the recreational facilities, a multi-use trail connection was made between easter lake park and ewing park located to the west. by tying the parks together, users have access to over 1,000 contiguous acres of park and recreational facilities to enjoy. from ewing park, other trails connect to the north and south along indianola avenue.

fundraising assistance & phased construction prompts straightforward development

an aerial image highlighting phased construction of the mark c. ackelson trail at easter lake park.

an aerial view of the phased construction plan for the mark c. ackelson trail.

the loop trail and connecting segments required a concerted fundraising effort. our team provided construction cost opinions, developed promotional materials, and rendered an image of the signature bridge to assist polk county conservation in generating excitement and project funding. polk county voters opted to support the polk county water and land legacy bond (pcwll), which provided significant project funding. with the snyder & associates team’s assistance, polk county conservation was also able to leverage the bond funds to secure federal funding assistance through the transportation alternatives program (tap).

the detailed trail design and construction process was split into four distinct phases:

  • phase one (2013) — trail construction through the historic, covered bridge and along the south side of the lake
  • phase two (2015) — starting in ewing park, another 36miles of the trail was constructed, passing through a tunnel under indianola avenue, then proceeding east along the north side of easter lake beyond the eastern park entrance
  • phase three (2018) — closed the eastern gap between phases 1 and 2 and paved two additional parking lots. modifications to easter lake dam were required to incorporate the trail along the dam
  • phase four (2018) — a short trail segment and a 443-foot-long, three-span bridge completed the 1-mile trail loop. this phase also included the construction of a sediment forebay weir
easter lake drained for construction

bridge construction was simplified with the lake drained.

phases three and four were constructed in coordination with the watershed restoration & water quality improvements project which involved dredging, shoreline restoration, and a constructed wetland. the lake was drained for dry dredging, which enabled the trail construction process to utilize lake bottom soils for borrow material, staging of construction materials, and modification to the dam while dry. the dry lakebed also facilitated the construction of the weir for the sediment forebay on the west side of the lake and the signature bridge.

the weir is made from a row of recycled concrete placed across the lake bottom directly under the bridge. it’s submerged below the surface and not visible to passing boaters. however, placing the weir under the bridge allows the bridge to serve as the visual cue to boaters that there’s an obstacle below. the weir is low enough to allow people kayaking and canoeing to glide over the top to access yeader creek.

phase three also included repaving evergreen avenue and connecting sidewalks for the city of des moines as a separate division in the construction documents. joint bidding and construction of the trail and the roadwork resulted in construction cost savings for both the city and polk county conservation.

additionally, the evergreen avenue bridge was replaced by a separate construction contract. we coordinated with the city of des moines to include a trail with the new bridge that crosses over the lake outlet. the simultaneous construction of the road, bridge, and trail minimized negative impacts to the area by overlapping construction activities and road closures.

trail design & related construction services

wetlands of easter lake trail

the restored wetlands are thriving after the completion of the project.

snyder & associates provided the conceptual, preliminary, and final design for over five miles of a 12-foot-wide pcc recreational trail. we also provided construction observation and administration, including the management of required federal funding documentation. 2022足球世界杯小组赛赛程 , a subsidiary of snyder & associates, provided structural engineering and construction phase services for the four pedestrian bridges along the alignment, varying in length from 32- to 443-feet.

our team coordinated extensively with the iowa department of transportation (dot), the iowa department of natural resources (dnr), and the u.s. army corps of engineers (usace) for environmental clearance, permitting, and trail construction throughout the park. wetland impacts were minimized through adjustments to the trail alignment when possible. potential bat habitats were also identified, and recommendations were given for trees to be cut during the winter months, so that bats would not be present.

increased usage of easter lake park is anticipated to continue in the future. the completion of the mark c. ackelson trail, together with the easter lake spine trail, provides a major steppingstone in connecting the area to the larger regional trail network.

client

polk county conservation

client type

project type

rich voelker, p.e.

rich voelker, p.e.

transportation business unit leader

related projects

aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
exposed siphon at omaha papio creek|drone map of the papio creek in omaha ne|papio creek stream

safeguarding critical infrastructure and water resources: omaha’s “papio” creek

in march 2019, the city of omaha faced a significant threat to its critical infrastructure under west papillion creek (known to locals as papio creek). a disastrous...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
south dakotas capitol building behind dredging equipment on lake|excavator on floating platform|excavator dredging from shoreline|sediment being pulled from lake bed|aerial view of capitol lake in south dakota|dump truck being filled with sediment from of south dakota's capitol lake

sediment buildup necessitates lake dredging project at south dakota capitol complex

one of the prominent features complementing the architectural beauty of the capitol complex in pierre, south dakota, is the 9.5-acre capitol lake. fed by a naturally...
||||||indian creek trail connection ribbon cutting

indian creek trail connection unites key marion neighborhoods

having doubled in population over the past three decades, the cedar rapid’s suburb of marion has been the dual beneficiary of a rapidly expanding metro area and the...
people enjoying 世界杯足球比赛预选赛
 launch at hubbard park|rendering of a canoe launch in wisconsin||||kinds in the water at hubbard park launch|families playing in the river at hubbard park launch

water access upgrade expands amenities at hubbard park: shorewood, wisconsin

hubbard park in the village of shorewood is a local landmark in this wisconsin community. located on a nearly five-acre, 1,400-foot-long strip of land between the...
|||||led bridge lighting|couple walks across a lit up trail bridge at night||night time bridge lighting

trestle-to-trestle bridge over beaver creek reconnects urban loop

the 3.75-mile-long trestle-to-trestle trail connects the inter-urban trail in des moines to the johnston trail system on the north side of interstate 35/80. in the...