3-d modeling design technology increases efficiencies for roadway reconstruction: interstate 35

increasing efficiencies for interstate reconstruction design: iowa dot

as part of an on-call design contract, the iowa department of transportation (dot) tapped snyder & associates to complete the final roadway design work for multiple construction contracts on interstate 35 spanning polk and warren counties. the design covers i-35 beginning south of the iowa highway 92 interchange and extends over 16 miles to the i-35/80/235 interchange (regionally known as the west mixmaster) in west des moines.

the project included extensive grading and paving work near the iowa 92 interchange, as well as the design and paving of the roadway approaches to the new northbound and southbound bridges spanning the north river and badger creek. in addition, the northbound lanes of i-35 were reconstructed from the polk/warren county line to the west mixmaster.

pavement concerns, roadway deficiencies, & design changes

initially constructed in 1958, the existing pavement in the project area was some of the oldest in iowa’s interstate system and required costly ongoing maintenance. in addition to the poor pavement conditions, specific areas to be addressed were:

  • two interchanges in warren county and one in polk county which had physical and geometric roadway deficiencies.
  • functionally obsolete and structurally deficient bridges located throughout the corridor. this included overhead bridges at iowa 92 and county road g14 which didn’t meet current vertical clearance standards and had been struck by tall vehicles several times.
  • widening of i-35 from four lanes to six lanes to accommodate increased traffic throughout the corridor. (some areas will remain a four-lane facility, but can easily be expanded to six lanes as future traffic volume requires.) expansion to six lanes throughout the entire corridor is anticipated for 2032.
  • detailed staging and complex traffic control plans were required to maintain safe and efficient traffic flow on i-35 during the construction.
  • due to plan changes made during years of construction with multiple construction contracts, the original design created by iowa dot required numerous updates to better facilitate the project. snyder & associates was able to quickly complete these changes to arrive at the final design.

3-d modeling technology for automated machine guidance (amg)

our team also developed 3-d machine control files. these files were made available to contractors in order to use automated machine guidance (amg). amg is a process whereby construction equipment utilizes onboard computers and global positioning system (gps) technology for horizontal and vertical guidance in real-time.

for certain types of grading work, amg has the potential to achieve designed grades on the first pass. this results in fewer budgetary impacts and shorter construction timeframes. other benefits of using amg include improved quality, better safety for construction workers compared to traditional staking, and more efficient use of already limited resources.

financial 2022世界杯32强预选赛 assistance for roadway projects

prior to snyder & associates completing the final project design, the cost of all programmed projects was estimated at less than $100 million. however, because there were projects in the original environmental assessment that had not yet been programmed, that cost was expected to increase. once all projects were added, the estimated cost exceeded $140 million. because federal funds were being used for the project, a financial plan reviewed by the federal highway administration (fhwa) was required. this requirement pertains to all projects with an estimated cost between $100 million and $500 million. snyder & associates navigated this complex financial 2022世界杯32强预选赛 process for the client in consultation with the fhwa.

the purpose of a financial plan is to ensure financial resources for large projects are identified, available, and properly managed during the life of the project. it’s a comprehensive document designed to reflect the project scope, schedule, cost, and funding. the plan goes far beyond the typical cost estimates prepared by engineers. progress is tracked over time through annual updates to the initial financial plan. each annual update reviews and tracks actual dollars spent on each project and anticipated changes to overall project costs over the past fiscal year. this helps to determine if changes to project programming are needed.

while it’s typically only done for large, complex projects, this type of detailed financial 2022世界杯32强预选赛 strategy is useful for smaller projects, as well. although the financial plan for a small project is less complicated, it’s equally important to track all aspects of the project cost, changes that occur, and anticipated funding sources. in the event of a funding shortfall, snyder & associates can assist with the identification of potential funding sources and the preparation of required applications.

snyder & associates completed both the final roadway design and financial plan for the reconstruction of interstate 35 while overcoming several challenges along the way. snyder & associates’ flexibility and commitment to doing what is necessary to ensure the success of a project is the2022世界杯32强赛程表时间 .

client

iowa dot

client type

project type

wade greiman, p.e.

wade greiman, p.e.

transportation business unit leader

related projects

aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
overlaid pavement on 1st ave with railroad crossing in the background|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|aerial view of ellis boulevard and 6th street nw connector & 1st ave rehabilitation in cedar rapids iowa|railroad crossing|roundabouts streamline traffic flow|cars driving around the roundabout creating efficient traffic flow|1st ave & 6th street intersection facing north before & after construction

ellis boulevard & 6th street nw connector & 1st avenue rehabilitation: cedar rapids

a 2022世界杯32强预选赛 initiative performed in the community of cedar rapids identified a critical need for better connections and smoother traffic flow between the kingston...
roundabout in anamosa iowa|roundabout in anamosa iowa|overview of us 151 grade separation and roundabout in anamosa iowa|roundabout design showcasing lighting and signage in anamosa iowa|man cutting the ribbon for us 151 grade separation and roundabout in anamosa iowa||us 151 grade separation and roundabout: anamosa

us 151 grade separation and roundabout: anamosa, iowa

in a strategic move to address safety concerns and bolster regional connectivity, the city of anamosa required a unique transportation solution to address a regional...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
newly poured concrete roadway|construction workers pouring concrete for stormwater drainage|cement truck pours wet concrete onto newly established roadway|construction workers in large hole for sanitary sewer|crews lay wet cement

major street reconstruction project benefits waverly community

the 4th street sw corridor is a busy north/south thoroughfare in the heart of the waverly community. this busy stretch provides access to the bustling business district...
|||||led bridge lighting|couple walks across a lit up trail bridge at night||night time bridge lighting

trestle-to-trestle bridge over beaver creek reconnects urban loop

the 3.75-mile-long trestle-to-trestle trail connects the inter-urban trail in des moines to the johnston trail system on the north side of interstate 35/80. in the...