wra fourmile interceptor

the fourmile sewer interceptor project extended from the wastewater treatment facility to the constructed fourmile interceptor extension project at broadway avenue. this was an expansion project to serve the communities of ankeny, altoona, bondurant, des moines, and polk county. design capacities for the projects are from approximately 50 mgd to approximately 80 mgd. allowable infiltration of new sewers was reduced to 100 gal/in dia./mile/day for this project, and final testing results averaged around 25 gal/in dia./mile/day.

this expansion project address’ the wastewater treatment needs of ankeny, altoona, bondurant, des moines, and polk county.

the project was separated into five segments with four construction contracts. the project included construction of approximately 16,700-feet of 72-inch and 20,100-feet of 60-inch sanitary sewer through a mix of industrial, commercial, residential, and agricultural areas within the city of des moines and polk county at depths up to 25-feet including open cut and trenchless installation methods. the new sewer primarily paralleled an older sewer/s and an additional project was performed to investigate and evaluate the condition of existing sewers and manholes. this project also included two active railroad crossings requiring significant coordination with the railroad.

with the exception of geotechnical engineering, snyder & associates completed all aspects of the project including comprehensive facility 2022世界杯32强预选赛 , wetland delineation, right-of-way acquisition and negotiations, construction documents, construction observation, construction staking, and construction administration.

client

wra wastewater

client type

project type

wes farrand, p.e.

wes farrand, p.e.

civil engineer

related projects

exposed siphon at omaha papio creek|drone map of the papio creek in omaha ne|papio creek stream

safeguarding critical infrastructure and water resources: omaha’s “papio” creek

in march 2019, the city of omaha faced a significant threat to its critical infrastructure under west papillion creek (known to locals as papio creek). a disastrous...
leachate disposal lift station at des moines county landfill|excavator digging trench for sewer force main|leachate disposal submersible wet well lift station|leachate disposal construction of force main|leachate disposal wastewater force main cleanout

leachate disposal solution for des moines county landfill & the city of west burlington

for many years, the des moines county landfill relied on the traditional yet costly method of trucking excess water that percolated through the landfill, commonly known...
slater wastewater treatment greenhouse at sunset|wastewater lagoon with aeration bubbles|greenhouse and settling pond|aerial view of large lagoon cell drained for construction|slater's new greenhouse for wastewater treatment|inside slater greenhouse with empty cells|inside of slater wastewater treatment plant with algae belts.|slater wastewater treatment plant ribbon cutting|visitors walk inside the new slater greenhouse and view rab belts|aerated lagoon at the slater wastewater treatment plant|rab belts at the slater wastewater treatment plant

slater incorporates algae to treat community wastewater

for years, the city of slater used an aerated lagoon system as its primary wastewater treatment method. however, increased awareness of pollutants and their impact on...
blue and red map of sewer system service area|corroded manhole|lime green map of pleasant hill sewer system and neighboring communities

growth in pleasant hill leads to sanitary sewer system review

snyder & associates was tasked with conducting a sanitary sewer system review, identifying long-term system and infrastructure upgrades.

square concrete new lift station|above ground section of vertical screen|large machine used to bore holes and make way for pipe|trenchless construction|lead tubing being placed before pipe|concrete tube that will eventually house pumps|square concrete new lift station

lift station upgrades eliminate backups & increase efficiencies: anamosa

anamosa 2nd street wastewater lift station improvements as community leaders in mature communities know, the need for new and more efficient wastewater systems is a...
large rectangle wastewater lagoon pond|snowy fields with school in distant background||large dirt hole during lagoon construction|concrete walls of the lagoons lift station placed in the ground

starmont high school’s wastewater dilemma requires speedy solution

thanks to positive client relationships and word-of-mouth recommendations, snyder & associates was hired to find a viable wastewater solution for a high...
aerial view of two large blue lagoons and operation buildings||waterside view of lagoon and gravel shores|metal walkway between two lagoons. one is rough and one is smooth.||

west burlington’s wastewater treatment plant upgraded to meet current npdes requirements

snyder & associates wastewater engineers were enlisted to develop a plan for remodeling and expanding west burlington’s existing wastewater treatment...
car sprays water while driving through a large puddle||car sprays water while driving through a large puddle|view of downtown skyscrapers at then end of a main street|satellite map with project area outlined in red|construction work in a deep trench

des moines’ sewer separation initiative prevents flooding, backups & overflows

antiquated stormwater & wastewater system fails to meet new standards when the city of des moines wastewater system was initially constructed, viable methods for...
inside of the disinfection-flow equalization tank.|inside of the sbr tank looking at the aeration piping system.|inside of treatment tank looking at piping

custom wastewater treatment solutions for growing industrial client

working with this industrial client for over ten years, snyder & associates continues to provide the most cost-effective, environmentally-sound, and...
cement building with blue roof|grey wall of electrical pannels|multiple pumps in cement room|three oval motors in a row|looking down on multi-level facility floors|

new pump station expands st. joseph’s eastside sewer system reach

the city of st. joseph selected snyder & associates to replace the outdated, undersized easton road pump station with a newly designed wastewater facility in an...