kempton bridge & nw 66th avenue

flood damage & traffic volume lead to new bridge

located in central polk county, kempton bridge was originally built in 1959. over time, it became structurally deficient and functionally obsolete. flooding in 1993 and an uncontrolled release from the saylorville reservoir in 2008 damaged the bridge and overtopped the roadway. high traffic volume further added to the need for improvements with approximately 15,000 vehicles passing through the area per day. according to a des moines area mpo traffic model, that number could reach 30,000 by 2030.

significant bridge & roadway improvements

to provide the needed improvements, the existing two-lane kempton bridge is being removed and replaced with a four-lane bridge. the new bridge will be over 200-feet longer and is designed to better withstand flood events similar to those previously experienced in the area. additional lanes will accommodate higher traffic volumes, while the addition of multipurpose, recreational trail promotes safe passage for bicyclists and pedestrians.

the project involves the reconstruction of two and a half miles of rural, two-lane roadway into a four-lane roadway with a designated left-turn lane. new traffic signals will be added at nw beaver drive/nw 66th avenue and nw 26th street/nw 66th avenue intersections.

coordination with utility providers and the united states army corps of engineers (usace) was performed during design. several adjustments were made to avoid existing gas main facilities and minimize the impact of relocating overhead electric lines. a 30-inch water main extending from the des moines water works plant on nw 26th street west to nw beaver drive was directional drilled beneath the des moines river. adjustments were also made to minimize tree clearing and grading on usace property while maintaining access and minimizing impacts to the sycamore boat ramp and neal smith trail facilities.

due to a lack of suitable bypass routes through des moines, an extensive three-phase plan is being utilized to maintain two-way traffic during construction.

kempton bridge construction during august 2017.

phase 1: summer 2015 through fall 2017. construction of the new bridge featuring four lanes and a recreational trail along the bridge’s south side to connect with the neal smith trail on the east side of the bridge. access to the neal smith trail was detoured along toni drive via temporary crossings and signals, and waterway traffic was restricted for brief periods. the bridge was constructed in two stages to maintain two-way traffic. both the bridge and trail opened to traffic in early december 2017.

phase 2: spring 2017 through fall 2017. reconstruction of nw 66th avenue from the nw beaver drive intersection in johnston to the new kempton bridge. nw 66th avenue was transformed from a rural, two-lane section into a five-lane, urban section with left turn lanes between nw beaver drive east past the johnston soccer fields. reconstruction of nw 66th avenue also created a four-lane rural section adjacent to the usace between the johnston soccer fields and kempton bridge.

the recreational trail from nw beaver drive in johnston to kempton bridge will be connected via usace property. trail alignment was coordinated with usace staff to minimize the impact to trees while maneuvering the trail through a wooded area between the soccer fields and kempton bridge. overall project completion is anticipated for mid-november 2017.

phase 3: spring 2018 through spring 2019 – reconstruction of nw 66th avenue east of kempton bridge through the nw 26th street intersection in polk county from two lanes to five lanes with a two-way left turn lane. drainage improvements will eliminate or reduce localized flooding along the roadway. traffic along nw 26th street and nw 66th avenue will be maintained during construction.

snyder & associates, inc. is providing a variety of services for the project including traffic studies, environmental, 2022世界杯32强预选赛 , right-of-way, survey, civil and structural engineering. 2022足球世界杯小组赛赛程 provided the structural bridge design, and polk county is performing the construction services.

click here to view the environmental assessment.

client

polk county 世界杯足球比赛预选赛 works

client type

project type

no team members assigned to this project.

related projects

aerial rendering of the grand avenue roadway extension in west des moines|map of national flood hazard layer of the project area|image of construction taking place for grand avenue extension in west des moines iowa with construction workers and cement trucks in the background|newly poured roadway with road crew working in the background.|image of construction taking place for grand avenue extension in west des moines iowa|new bridge over johnson creek with earthwork still to complete underneath.|view of the johnson creek bridge along grand avenue with the new monuments installed on either side.|custom-designed monuments for the city of west des moines

grand avenue extension in west des moines opens additional area for development

to provide access to microsoft's new data center and open additional area for development in southwest west des moines, city leaders contracted with snyder and...
a man running on trail underneath bridge|creek bank underneath bridge|map of the new clear creek trail alignment around the interstate 80/380 interchange|workers install one of the bridges over clear creek|decorative concrete castings for clear creek trail connection|clear creek trail connection bridge|trail underneath bridge in coralville iowa

clear creek trail connection fills critical multi-modal gap: coralville, iowa

the clear creek trail project has emerged as a significant addition to the ongoing efforts to enhance connectivity and recreational opportunities in johnson county....
exposed siphon at omaha papio creek|drone map of the papio creek in omaha ne|papio creek stream

safeguarding critical infrastructure and water resources: omaha’s “papio” creek

in march 2019, the city of omaha faced a significant threat to its critical infrastructure under west papillion creek (known to locals as papio creek). a disastrous...
||restoration from marsh to top tier course with featuring bright green golf course and trees in background|

tpc wisconsin emerges as a premier golf course

in the heart of madison, wisconsin, a remarkable transformation has occurred, reshaping the golfing experience for enthusiasts and professionals alike. dennis tiziani,...
ne 51st avenue intersection along us 69 reconstruction project.|intersection with traffic lights|intersection at ne 70th avenue intersection along the us 69 reconstruction project.|intersection of ne 60th avenue near the polk county sheriff's office along us 69 reconstruction.|median under construction|lidar image of us 69 reconstruction|snyder & associates transportation experts

us 69 reconstruction: paving the way for future growth in ankeny

in the heart of unincorporated polk county, a bustling two-lane corridor known as us highway 69 (ne 14th street) has long been a critical lifeline connecting des moines...
newly constructed roadway intersection|road traffic transitions into roundabout|improved traffic flow due to new corridor|snyder & associates worker surveying roadway construction|group of people attending a ribbon cutting for new roadway|tower terrace roadway map

tower terrace road upgrades fill gap in northern connector initiative

nearly two decades ago, planners for linn county and several surrounding communities — including cedar rapids, hiawatha, and marion — began laying the groundwork for an...
|||aerial rendering of hickman and interstate 35/80 diverging diamond interchange.||street level rendering of hickman and interstate 35/80 diverging diamond interchange.|||rendering of pedestrian tunnel underneath interstate 35/80 at hickman road diverging diamond interchange.|bridge abutments design treatment underneath interstate 35/80 diverging diamond interchange bridge.|||median treatment rendering underneath interstate 35/80 diverging diamond interchange bridge.|two pedestrian bridges over the interstate onramps

progress on the interstate 35/80 & u.s. 6 diverging diamond interchange upgrade

the exponential growth of communities, particularly in the western suburbs of des moines, has been nothing short of remarkable. the population of waukee, for example,...
||||

cedar heights drive reconstruction continues cedar falls corridor upgrades

for several years, the cedar falls community has been expanding its transportation network along the southern edge of town, including the greenhill road corridor. this...
south dakotas capitol building behind dredging equipment on lake|excavator on floating platform|excavator dredging from shoreline|sediment being pulled from lake bed|aerial view of capitol lake in south dakota|dump truck being filled with sediment from of south dakota's capitol lake

sediment buildup necessitates lake dredging project at south dakota capitol complex

one of the prominent features complementing the architectural beauty of the capitol complex in pierre, south dakota, is the 9.5-acre capitol lake. fed by a naturally...
people enjoying 世界杯足球比赛预选赛
 launch at hubbard park|rendering of a canoe launch in wisconsin||||kinds in the water at hubbard park launch|families playing in the river at hubbard park launch

water access upgrade expands amenities at hubbard park: shorewood, wisconsin

hubbard park in the village of shorewood is a local landmark in this wisconsin community. located on a nearly five-acre, 1,400-foot-long strip of land between the...

more than 45 years

serving clients around the country

db+